Yellowhead Copper Project
Taseko Mines Limited is proposing the construction, operation, and closure of a new open-pit copper mine located about 150 kilometres northeast of Kamloops, British Columbia. The Yellowhead Copper Project has been designed with a production capacity of 90,000 tonnes of ore per day (up to 32 million tonnes per year) over a 25-year mine life. The project, which would also produce gold and silver, includes a new mill, an approximately 110 kilometre transmission line that would connect to an existing BC Hydro substation near 100 Mile House, and a rail load-out facility at an existing site at Vavenby.
British Columbia's Environmental Assessment Office is collaborating with the Impact Assessment Agency of Canada as part of the federal impact assessment of the project. For more information on the EAO's process, please visit EPIC.engage.
Latest update
At a glance
Planning
Time limit suspension
The time limit for the impact assessment process was suspended on October 17, 2025 at the request of the proponent and the number of days will not advance.
Planning
Key documents
- Notice of Time Limit Suspension with Reasons October 9, 2025
- Joint Summary of Issues and Engagement October 2, 2025
- Summary of the Initial Project Description of a Designated Project June 23, 2025
- Initial Project Description of a Designated Project June 23, 2025
Comment periods
- Public notice - Comments Invited & Information Sessions on the Initial Project Description August 5, 2025 to September 15, 2025 - Closed
Post Decision
Post Decision phase is an ongoing process
Post Decision
Participate
Contacts
Media RelationsImpact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca
Yellowhead Copper Project
Impact Assessment Agency of Canada
1800-1138 Melville Street
Vancouver, British Columbia V6E 4S3
Telephone: 604-666-2431
Email: Yellowhead@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- 150 kilometres northeast of Kamloops (British Columbia)
-
Nature of Activity
- Mines and Minerals
-
Assessment Status
Suspended -
Start Date
2025-08-05 -
Proponent
Taseko Mines Limited -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Planning Phase for Impact Assessment -
Reference Number
89694
Nearby assessments
...within 200 kilometres-
Harper Creek Mine Project
Vavenby -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
New Fibre Installation
Project Site 08: North Thompson 1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Ruddock Creek Mine Project
Avola -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
North Thompson Rail Terminal Development Project
Kamloops -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
Affordable Housing Units
Adams Lake Indian Band -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Ajax Mine Project
Kamloops -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
New Fibre Installation
Project site 1: Enderby 2 -
Timber harvesting on Salmon River 1
Salmon River 1 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
New Fibre Installation
Okanagan -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Parking Lot repave
301 3rd Street West, Revelstoke -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Head of the Lake Subdivision
Vernon -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Timixw Mixed Use Development
Vernon, BC -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
New Fibre Installation
Canoe Creek IR#2 -
Hazard Spruce Tree Removal
Glacier National Park -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
Pyramid Bench Wildfire Risk Reduction
Jasper National Park of Canada -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Dog Creek
Stswecem'c Xgat'tem First Nation -
Revision to the Posting for IAA Reference Number 85748 (Dog Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands.
Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands. -
Knucwentwecw Society Office
2561 Quigli Drive -
Williams Lake First Nation - Northside Development (Coyote Rock)
Williams Lake IR1 -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Nazco 20 -
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Esk'etemc First Nation - Telus Telecommunications Tower - Alkali Lake
Esk'etemc First Nation -
AIB reservoir Construction
Ashcroft -
Esk'etemc-Alkali Lake IR1 Wastewater Upgrades project
Esk'etemc, Alkali Lake IR 1 -
New Fibre Installation
Nooaitch -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 6.5
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment Site 6
Jasper National Park of Canada -
Trans Mountain Miette River Bridge Replacement
Jasper National Park -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Marmot Basin Knob Area Avalanche Berm
Jasper National Park of Canada -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
New Fibre Installation
Coldwater -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Trans Mountain Pipeline Site KP387 Bioremediation
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 2 (KP386.75)
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 1.25
Jasper National Park of Canada -
Parks Canada 8-Mile Pit Expansion and Aggregate Extraction
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Valley of the Five Lakes Trail Restoration
Jasper National Park of Canada -
Parks Canada Agency Whistlerville Housing Rebuild and Utilities to Marmot Meadows
Jasper National Park -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
Jasper House Bungalows Wildfire Rebuild Master Plan
Jasper National Park of Canada -
Anticipatory Proposed Site Development for Municipality of Jasper Interim Housing Outside Townsite
Jasper National Park -
Jasper House Bungalows Master Plan
Jasper National Park -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Petro Canada Wildfire Rebuild
Jasper National Park of Canada -
Redevelopment of 702 Connaught Drive - 7-Eleven Convenience Store and Gas Bar
Jasper National Park of Canada -
Telus Communications Inc., new radiocommunications tower (BC105333) on Toosey I.R. No. 1, near Riske Creek, BC.
BC105333 - Toosey I.R. No. 1 -
Tekarra Lodge Wildfire Rebuild
Jasper National Park of Canada -
Tl'esqox First Nation - Telus Telecommunications Tower - Riske Creek, Toosey IR1
Toosey First Nation -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Parks Canada Pyramid Bench Wildfire Risk Reduction 2025-2030
Jasper National Park -
ATCO Electric - Pyramid Bench Underground Conversion
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Pursuit - Columbia Icefield Discovery Centre - Wastewater Treatment System and Building Replacement
Jasper National Park -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
JTA - Hochimini Trail Realignment
Jasper National Park -
Jasper Park Lodge Maintenance and Golf Maintenance Compounds, General Manager's Cabin & Superintendent's Cabin Rebuild - Post-Wildfire
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Jacques Lake Realignment
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada