Document Notice of Determination - TELUS Cell Tower Cable Upgrade, Vernon British Columbia

  • Project TELUS Cell Tower Cable Upgrade
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-09-02
  • Document: 135928E.html
  • Relevance: 276.09
  • Notice of Determination September 3, 2020 - Vernon, British Columbia The Department of National Defence has determined that the proposed 'TELUS Cell Tower Cable Upgrade project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
  • Relevance: 225.09
  • Avis de détermination Le 3 septembre 2020 - Vernon, Colombie-Britannique Le Ministère de la Défense nationale a déterminé que le projet proposé de Modernisation du câblage de la tour de transmission cellulaire TELUS n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale ...

Document Public Comment Period on Intent to Make a Determination

  • Project TELUS Cell Tower Cable Upgrade
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-07-22
  • Document: 135506E.html
  • Relevance: 273.29
  • Public Comment Period on Intent to Make a Determination TELUS Cell Tower Cable Upgrade July 22  2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should ...
1 alternate format found
French HTML
  • Relevance: 222.29
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Modernisation du câblage de la tour de transmission cellulaire TELUS Le 22  juillet  2020 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: