Harbour Development, Lark Harbour, NL
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed project will see the development of the DFO-SCH site including a new marginal wharf, a new launchway, floating dock system and breakwater. The proposed work will include demolition and clean up of the site to facilitate new construction, as well as excavation, scarification and compaction of the existing upland and parking area to facilitate placement of new rock fill and granulars. The harbour basin will also be dredged to provide safe access to the new infrastructure.
Latest update
October 3, 2024 – The Federal Authorities have issued their Notice of Determination after evaluation of the harbour development at the Lark Harbour, and have determined that the project is not likely to cause significant adverse environmental effects and can therefore proceed.
This determination was based on a consideration of the following factors:
- Impacts on rights of Indigenous peoples;
- Community and Indigenous knowledge;
- Comments received from the public; and
- Technically and economically feasible mitigation measures.
Mitigation measures taken into account for this determination are:
- To minimize the possibility of fish habitat contamination and the spread of aquatic invasive (alien) species, all construction equipment which will be immersed into the water or has the possibility of coming into contact with such water during the course of the work, must be cleaned and washed to ensure that they are free of marine growth and alien species.
- Weather conditions are to be assessed on a daily basis to determine the risk of extreme weather in the project areas. Avoid work during periods which Environment and Climate Change Canada has issued rainfall, wind or wave warning for the work area.
- An Erosion and Sediment Control Plan will be developed for the site that minimizes risk of sedimentation to the marine environment.
- Ensure that all in-water activities, or associated in-water structures, do not interfere with fish passage.
- Wash, refuel and service machinery and store fuel and other materials for the machinery in such a way as to prevent any deleterious substances from entering the water.
- Construction material and debris are not to become waterborne. Do not dispose of any materials or waste into marine environment.
- All equipment to be used in or over the marine environment is to be free from leaks or coating of hydrocarbon-based fluids and/or lubricants harmful to the environment. Hoses and tanks are to be inspected on a regular basis to prevent fractures and breaks.
- On site, crews must have emergency spill clean-up equipment adequate for the activity involved, and it must be on site. Spill equipment will include, as a minimum, at least one 250 L (i.e., 55 gallon) overpack spill kit containing items to prevent a spill from spreading; absorbent booms, pillows, and mats; rubber gloves; and plastic disposal bags. All spills or leaks must be contained, cleaned up, and reported to the 24-Hour Environmental Emergencies Report System (1-800-565-1633).
- Minimize disturbance to all wildlife on-site and in adjacent areas during the entire course of the work.
- Ensure that waste is not left at the work site. All construction waste material will be disposed of in a provincially approved manner.
- No one shall disturb, move, or destroy migratory bird nests.
- Workers in contact with hazardous materials must be provided with and use appropriate personal protective equipment.
- Proper safety procedures must be followed throughout the duration of the project as per applicable municipal, provincial, and federal regulations.
- Dispose of and stabilize all excavated material above the ordinary high water mark or top of bank of nearby waterbodies and ensure sediment re-entry is prevented.
- Replace/restore any temporarily disturbed habitat features and remediate any areas impacted by the works, undertakings or activity.
- Sediment controls will be visually monitored throughout the life of the project, and repaired immediately if necessary.
- Any debris or waste material will be disposed of in a provincially approved manner.
- Eliminate free board spillage when excavating, loading and hauling material. Do not dump petroleum products or any other deleterious substances on ground.
- Dust control should be provided for construction activities and open soil areas, primarily by using fresh water.
- Work is to be carried out during hours agreed upon with the Departmental Representative to mitigate any disturbance to harbour users and residents.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | October 3, 2024 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | December 15, 2022 |
Contacts
Fisheries and Oceans CanadaPaul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Lark Harbour, Newfoundland (Newfoundland and Labrador)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2022-12-15 -
Proponent
Fisheries and Oceans Canada- Small Craft Harbours (DFO-SCH) -
Authorities
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
84286
Nearby assessments
...within 200 kilometres-
Lark Harbour Search and Rescue Wharf Extension
Main Road, Lark Harbour -
Wharf Replacement, Frenchmans Cove, Newfoundland
Frenchmans Cove -
Bay of Islands SAR Project, Corner Brook, Newfoundland
Corner Brook, Newfoundland -
Emergency Dredging, Trout River, NL
Trout River, Newfoundland. -
Wharf Reconstruction, Trout River, Newfoundland
Trout River -
Fiona Storm Damage - Wharf and Breakwater Reconstruction - Blue Beach, NL
Blue Beach, Newfoundland -
Trout River Gulch Public and Commercial Snowmobile Corridor
Gros Morne National Park -
Highway 431 and Tablelands Trail Access Road and Parking Lot Renovations
Gros Morne National Park of Canada -
Floating Dock Installation, Fox Island River, NL
Fox Island River, Newfoundland -
Harbour Entrance Improvements, Fox Island River, NL
The DFO-SCH project site is located in Fox Island River, Newfoundland. -
Dredging, Fox Island River, NL
Fox Island River, Newfoundland -
Highway 431 Barters Hill Renovations
Gros Morne National Park of Canada -
Lomond River Fishway Replacement
Lomond River -
Harbour Development, Norris Point, Newfoundland
Norris Point (Neddys Harbour) -
7Corners Installation Rocky Barachois
Gros Morne National Park of Canada -
Conservation and Protection Detachment Construction in Rocky Harbour, NL
On a portion of land on West Link rd., adjacent to the RCMP detachment, in Rocky Harbour, Newfoundland and Labrador (NL) -
Transmission Main from Chlorine Building to West Link Road
Rocky Harbour -
Shoreline Protection, Rocky Harbour, NL
The DFO-SCH project site is located in Rocky Harbour, Newfoundland. -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Ammonia and hydrogen production facility -
Martin Point Landfill Remediation
Gros Morne National Park of Canada -
Newfoundland and Labrador Hydro Line Modifications in Gros Morne National Park
Gros Morne National Park of Canada -
Environment and Climate Change Canada climate station relocation, Gros Morne National Park
Gros Morne National Park -
Visitor Centre Recapitalization in Gros Morne National Park
Gros Morne National Park -
Slipway Construction, Lourdes, Newfoundland
Lourdes -
Green Point Access Road Widening
Gros Morne National Park of Canada -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Port au Port wind farm -
Deer Lake Very High Frequency Omni-directional Range (VOR) Replacement
Deer Lake -
Summer guided activities by business license holders for Gros Morne National Park
Gros Morne National Park -
Long Range Campsite Redevelopment
Gros Morne National Park of Canada -
Western Brook Bridge Replacement
Gros Morne National Park -
Wharf Reconstruction, Cape St. George, Newfoundland
Cape St. George -
Harbour Cleanup, St. David's (Crabbes River), NL
St. David's (Crabbes River), NL -
Valentine Gold Project
Valentine Lake -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Codroy area wind farm -
Wharf Reconstruction, Westport, NL
Westport, Newfoundland -
Cape Ray Gold Project
Channel-Port aux Basques -
Storm Damage Repairs, Codroy, NL
Codroy, Newfoundland -
Floating Dock Construction and Installation at Codroy SCH, NL
The Codroy SCH is located in the community of Codroy, on the southwestern portion of Newfoundland. -
Storm Damage Repairs, Harbour Le Cou, NL
Harbour le Cou, Newfoundland -
Storm Damage Repairs, Rose Blanche, NL
Rose Blanche, Newfoundland -
VHF tower construction, Burgeo, Newfoundland Labrador
Burgeo -
Fishway Reconstruction, Indian River, Springdale, NL
Indian River, Springdale, Newfoundland -
Reconstruction of the navigation aid and the heliport at Rochers-au-Cormoran island
Côte-Nord-du-Golfe-du-Saint-Laurent -
Storm Damage Repairs, Burnt Islands, NL
Burnt Islands, Newfoundland -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Burgeo Wharf Reconstruction
The Canadian Coast Guard Lifeboat Station is located in the community of Burgeo, NL.The project site is accessible via Reach Road located off of Route 480. -
Rehabilitation of the retaining wall on the approach to the wharf in Harrington Harbour, Quebec
Harrington Harbour -
Harrington Harbor hauling slip repair
Harrington Harbour -
Wharf Reconstruction and Launchway, Isle aux Morts, NL
Isle aux Morts, Newfoundland -
Wharf / Breakwater Reconstruction, Fox Roost, NL
Fox Roost, Newfoundland -
Maritime Link Transmission Project
Cape Ray Cove -
Storage Tank Installation - Canadian Food Inspection Agency's Inspection station - Port-aux-Basques, Newfoundland
Channel-Port aux Basques -
Storm Damage Repairs, Channel-Port aux Basques, NL
Channel-Port aux Basques, Newfoundland -
Storm Damage Repairs, Margaree, NL
The DFO-SCH project site is located in Margaree, Newfoundland. -
Completion work by the BCNHST, to bring the new transfer facilities for hydrocarbons up to standard - Tête-à-la-Baleine Wharf
Tête-à-la-Baleine Wharf -
Point Rousse Port Facility Project
Baie Verte -
Point Rousse Port Expansion Project
Baie Verte -
Storm Damage Repairs, Ramea, NL
Ramea, Newfoundland -
Corridor Resources Inc. Drilling of an Exploration Well on the Old Harry Prospect - EL 1153 (previously EL 1105)
Gulf of St-Lawrence -
Helicopter Pad Replacement, Northwest Head (Ramea), NL
The DFO-RPSS project site is located in Northwest Head (Ramea), Newfoundland. -
DFO-SCH Floating Dock Installation, Roberts Arm, NL
Roberts Arm -
Marginal Wharf Reconstruction, Port aux Choix, NL
Port aux Choix, Newfoundland -
Launchway Improvements, Port Au Choix, NL
Port aux Choix, Newfoundland -
Maritime Link Transmission Project
Cabot Strait -
Floating Dock Installation, Nippers Harbour, NL
The DFO-SCH project site is located in Nippers Harbour, Newfoundland. -
Launchway Upgrades, Fleur de Lys, NL
DFO SCH Site in Fleur de Lys, NL (DFRP #24299) -
Installation of a floating dock at La Tabatière wharf
La Tabatière -
Demolition of shed at La Tabatière wharf, La Tabatière, QC
La Tabatière -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor