Permanent decommissioning of Canadian Coast Guard infrastructure at the Point Heath, Anticosti
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Canadian Coast Guard (CCG) wishes to permanently decommission two 50,000 L buried diesel tanks and a 13,620 L Jet A above-ground tank and to dismantle a guyed tower at the Heath Point site, located on the east of Anticosti Island. These activities will be carried out between 2022 and 2024, once the new Anticosti telecommunication site has been commissioned. The decommissioning of the tanks consists of emptying, transferring the diesel and jet A fuel, and cleaning the related equipment. These hazardous residual materials will be managed in accordance with applicable regulations. All decommissioned equipment will remain on site to be recovered in a later phase (2025). The guyed tower will be put down by controlled and directed fall, avoiding sensitive components of the environment (e.g. ruin of the old lighthouse and peat bog). The tie rods will be cut at ground level and the shrouds and sections of the tower will be cut in section. The dismantled structure will be left in place and recovered in 2024.
Latest update
Participate
Contacts
Emilie PrevostCanadian Coast Guard - Marine and Civil Infrastructure
Emilie Prevost, Project Engineer
1550 avenue D'Estimauville
3rd floor
Quebec, Quebec G1J 0C2
Telephone: 418-563-4754 or 1-418-563-4754
Fax: 418-563-4754
Email: emilie.prevost@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- East Point of Anticosti Island (Quebec)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-06-02 -
Proponent
Garde côtière canadienne -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
83688
Nearby assessments
...within 200 kilometres-
Establishment of a new telecommunication site, Anticosti
East Point of Anticosti Island -
Dismantling of infrastructure at Heath Point telecommunications site
Heath Point -
Municipal Garage
Nutashkuan -
Lowering of the local groundwater table
Nutashkuan -
Residential development phase III in Nutashkuan
Nutashkuan -
Improvement of the Nutashkuan Leisure Offer
Nutashkuan -
Movement Area Overlay at Natashquan Airport
Natashquan -
Tank removal by AVJET
Natashquan Airport -
Construction of a new fishing harbour in Natashquan
Natashquan -
Development of a service area at the Kegaska fishing harbour - Côte-Nord
Kegaska fishing harbour -
Kegaska - Deconstruction of the former Fish plant and two related buildings
Kegaska wharf -
La Romaine commercial wharf - Rehabilitation of the western riprap
La Romain Wharf -
Demolition of the seaplane dock in La Romaine, Quebec
La Romaine -
Renovation of a wastewater pumping station in Unamen Shipu
Pumping station -
Stabilization of four stormwater outfalls, Unamen Shipu
Unamen Shipu -
Replacement of navigation aid structures - Baie-Johan-Beetz
Baie-Johan-Beetz -
Demolition of the dock and warehouse, and rehabilitation of sediments and soils – Baie-Johan-Beetz Port
Baie-Johan-Beetz -
Development of new camp sites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve.
Mingan Archipelago National Park Reserve -
Corridor Resources Inc. Drilling of an Exploration Well on the Old Harry Prospect - EL 1153 (previously EL 1105)
Gulf of St-Lawrence -
Reconstruction of the navigation aid and the heliport at Rochers-au-Cormoran island
Côte-Nord-du-Golfe-du-Saint-Laurent -
Discovery and fishing cruise along the north coast of Forillon
Forillon National Park -
Construction of an additional campsite at Le Havre au Sauvage
Mingan Archipelago National Park Reserve -
Addition of a line of floating pontoons and riprap to breakwater 301 at Grosse-Île harbour, Magdalen Islands
Grosse-Ile Harbour, Magdalen Islands -
Reorganisation of the Grosse Île Harbour, Magdalen Islands
Grosse-Île, Îles-de-la-Madeleine, QC -
Redevelopment of parking areas, Pointe-de-Est National Wildlife Area
Magdalen Islands -
Installation of culverts
Magdalen Islands -
Development of new campsites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve
Mingan Archipelago National Park Reserve -
Maintenance of the Minimal Trails Network at Pointe de l'Est National Wildlife Area
Pointe-de-l'Est National Wildlife Area -
Maintenance of the minimal trail network at Pointe-de-l'Est National Wildlife Area
Pointe-de-l'Est National Wildlife Area -
Removal and installation of fuel tanks and soil rehabilitation at Havre-Saint-Pierre airport
Havre-Saint-Pierre airport -
Installation of riprap at the commercial wharf of Grande-Entrée Harbour in Magdalen Islands
Grande-Entrée Fishing Harbour -
Installation of a line of floating docks at Grande-Entrée harbour in Magdalen Islands
Grande-Entrée harbour -
Reconstruction of a section of the commercial wharf of Grande-Entrée Harbour in Magdalen Islands
Grande-Entrée Harbour -
Maintenance Dredging at Grande-Entrée Harbour
Grande-Entrée Fishing Harbour -
Construction of a service building in the parking lot of the Cap-des-Rosiers beach
Forillon National Park -
Construction of a service building in the parking lot of the Cap-des-Rosiers Beach
Forillon National Park -
Notice of intention - Maintenance Dredging - Cap-des-Rosiers Fishing Harbour
Cap-des-Rosiers Fishing Harbour -
Petroleum product storage cabinet at Cap-des-Rosiers harbour in Forillon National Park
Forillon National Park of Canada -
Establishment of a Micmac experiential site within Forillon Park in the Cap-Bon-Ami sector.
Forillon National Park of Canada -
Access to heritage homes in the Grande Grave area PRO-1686
Forillon National Park of Canada -
Refurbishment of the Joseph-Gavey house - LOT 2 PRO-1686
Forillon National Park of Canada -
Changes to the Grande-Grave floating dock
Forillon National Park of Canada -
Renovation of the Elias-Gavey house and related improvements
Forillon National Park of Canada -
Acquisition and installation of propane heating in the oTENTiks of loop F at Petit-Gaspé campground
Forillon National Park of Canada -
Protection of vegetation against spruce budworm at Petit Gaspé and oTENTik campgrounds
Forillon National Park -
Development of a picnic site on the Laurencelle
Forillon National Park of Canada -
Food counter service at the new visitor center located in the North sector
Forillon National Park -
Extension of the Breakwater at St-Georges-de-Malbay Harbour
St-Georges-de-Malbay Harbour -
Construction of a base camp for group activities at the Barachois campground in Montpetit
Mingan Archipelago National Park Reserve -
Development of new campsites and outhouses on La Grande-île
Mingan Archipelago National Park Reserve of Canada -
Tio Mine Expansion Project
Havre-Saint-Pierre -
Maintenance Dredging - L'Anse-à-Brillant Fishing Harbour
L'Anse-à-Brillant Fishing Harbour -
Installation of a 15,000L diesel fuel tank at the Rivière-au-Renard Search and Rescue station.
Rivière-au-Renard Search and Rescue station -
Main Breakwater Repair at Rivière-au-Renard Harbour
Riviere-au-Renard Harbour -
Runway 16-34 (secondary) Overlay, Parking lot and Visual Aids Rehabilitation at Îles-de-la-Madeleine Airport
Iles-de-la-Madeleine Airport -
Îles-de-la-Madeleine Airport - Installation of a shelter and parking lot
Iles-de-la-Madeleine Airport -
Cap-aux-Meules Airport - Refueling station
Îles-de-la-Madeleine Airport -
Camp for Ekuanitshit guardians
Mingan Archipelago National Park Reserve of Canada -
Penouille Energy Trail
Forillon National Park of Canada