Removal and installation of fuel tanks and soil rehabilitation at Havre-Saint-Pierre airport
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project is divided into two secteurs (East and West) and 2 phases.
In 2024 :
- A 25,000 L tank located on a parcel of land in the western sector of the site will be permanently removed.
- A 45,500 L tank located on a parcel of land in the eastern sector of the site will be removed, and the soil beneath it rehabilitated.
In 2025 :
- A 50,000 L tank located on a parcel of land in the western sector of the site will be emptied, removed and reinstalled on the eastern parcel, on a concrete base;
- The soil on the western plot will be rehabilitated;
- A new 30,000+ L reservoir will be installed on the eastern plot.
An excavation approximately 2 m deep over an area of 4 m x 10 m is estimated.
The machinery required for the planned work is: a mechanical shovel with a maximum height of 4.5 m, and a 3.6 m wheel loader. Equipment will circulate only in areas authorized by security, and a site fence will be erected to limit the work area. A concrete mixer will also be required for the foundation under the tanks to be reinstalled.
No vegetation removal is required for the work.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of determination | - | November 21, 2024 |
| 1 | Notice of Intent to Make a Determination-Start of Public Comment Period | - | October 8, 2024 |
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Havre-Saint-Pierre airport (Quebec)
-
Nature of Activity
- Airport and Airfields
- Soil management
-
Assessment Status
Completed -
Start Date
2024-10-08 -
Proponent
AVJET -
Authorities
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
88965
Nearby assessments
...within 200 kilometres-
Development of new campsites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve
Mingan Archipelago National Park Reserve -
Construction of an additional campsite at Le Havre au Sauvage
Mingan Archipelago National Park Reserve -
Construction of a base camp for group activities at the Barachois campground in Montpetit
Mingan Archipelago National Park Reserve -
Development of new campsites and outhouses on La Grande-île
Mingan Archipelago National Park Reserve of Canada -
Camp for Ekuanitshit guardians
Mingan Archipelago National Park Reserve of Canada -
Stabilization and Protection of the Mingan River Bank
Ekuanitshit -
Relocation of the Domestic Outfall of the Mingan Wastewater Treatment Plant
Ekuanitshit -
Manitou and C Street Extensions and D Easement
Ekuanitshit -
Rehabilitation work of Utshimauat Petashu and Manitou Streets
Lot 5 062 511 -
Development of 30 residential lots: Manitou, H, I and J streets and rainwater outfall
Ekuanitshit, Québec -
Development of 11 lots and housing construction, F street, Ekuanitshit
Ekuanitshit -
Development of new camp sites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve.
Mingan Archipelago National Park Reserve -
Tio Mine Expansion Project
Havre-Saint-Pierre -
Demolition of the dock and warehouse, and rehabilitation of sediments and soils – Baie-Johan-Beetz Port
Baie-Johan-Beetz -
Replacement of navigation aid structures - Baie-Johan-Beetz
Baie-Johan-Beetz -
Maintenance Dredging at Rivière-au-Tonnerre Fishing Harbour
Rivière-au-Tonnerre Fishing Harbour -
Construction of a new fishing harbour in Natashquan
Natashquan -
Improvement of the Nutashkuan Leisure Offer
Nutashkuan -
Municipal Garage
Nutashkuan -
Lowering of the local groundwater table
Nutashkuan -
Movement Area Overlay at Natashquan Airport
Natashquan -
Tank removal by AVJET
Natashquan Airport -
Residential development phase III in Nutashkuan
Nutashkuan -
Main Breakwater Repair at Rivière-au-Renard Harbour
Riviere-au-Renard Harbour -
Installation of a 15,000L diesel fuel tank at the Rivière-au-Renard Search and Rescue station.
Rivière-au-Renard Search and Rescue station -
Discovery and fishing cruise along the north coast of Forillon
Forillon National Park -
Construction of a service building in the parking lot of the Cap-des-Rosiers Beach
Forillon National Park -
Construction of a service building in the parking lot of the Cap-des-Rosiers beach
Forillon National Park -
Notice of intention - Maintenance Dredging - Cap-des-Rosiers Fishing Harbour
Cap-des-Rosiers Fishing Harbour -
Petroleum product storage cabinet at Cap-des-Rosiers harbour in Forillon National Park
Forillon National Park of Canada -
Development of a service area at the Kegaska fishing harbour - Côte-Nord
Kegaska fishing harbour -
Kegaska - Deconstruction of the former Fish plant and two related buildings
Kegaska wharf -
Development of a picnic site on the Laurencelle
Forillon National Park of Canada -
Establishment of a Micmac experiential site within Forillon Park in the Cap-Bon-Ami sector.
Forillon National Park of Canada -
Penouille Energy Trail
Forillon National Park of Canada -
Protection of vegetation against spruce budworm at Petit Gaspé and oTENTik campgrounds
Forillon National Park -
Acquisition and installation of propane heating in the oTENTiks of loop F at Petit-Gaspé campground
Forillon National Park of Canada -
Refurbishment of the Joseph-Gavey house - LOT 2 PRO-1686
Forillon National Park of Canada -
Access to heritage homes in the Grande Grave area PRO-1686
Forillon National Park of Canada -
Renovation of the Elias-Gavey house and related improvements
Forillon National Park of Canada -
Changes to the Grande-Grave floating dock
Forillon National Park of Canada -
Equipment shelter replacement at Moisie
Moisie -
Permanent decommissioning of Canadian Coast Guard infrastructure at the Point Heath, Anticosti
East Point of Anticosti Island -
Establishment of a new telecommunication site, Anticosti
East Point of Anticosti Island -
Maintenance Dredging - L'Anse-à-Brillant Fishing Harbour
L'Anse-à-Brillant Fishing Harbour -
Food counter service at the new visitor center located in the North sector
Forillon National Park -
EXTENSION OF THE DRINKING WATER SUPPLY NETWORK COMMUNITIES OF MANI-UTENAM AND PLACE DE LA BOULE
Mani-Utenam (Malioténam) -
Residential Development and Storm Outfall Construction, Mani-Utenam
Mani-Utenam (Malioténam) -
Construction of a new health center in Mani-Utenam
Mani-Utenam -
Rehabilitation and updating of two domestic wastewater pumping stations in Mani-utenam.
Updating of two wastewater pumping stations in Mani-utenam -
Residential Development and Storm Outfall Construction, Mani-Utenam
Mani-Utenam (Malioténam) -
Mani-Utenam drinking water plant upgrade
Mani-Utenam -
Construction of the necessary infrastructure and production of spirulina
Mani-Utenam -
Rehabilitation and updating of two domestic wastewater pumping stations in Mani-utenam.
Updating of two wastewater pumping stations in Mani-utenam -
Construction of 150 housing units and supporting infrastructures.
Mani-Utenam -
Glamping Mani-Utenam
Mani-Utenam -
Ecocentre development in Uashat Mak Mani-Utenam
Uashat Mak Mani-Utenam -
Construction of an ecocenter in Mani-utenam
Mani-Utenam (Malioténam) -
Installation of a concrete slab and a new 25,000 L reservoir at Sept-Îles airport
Sept-Îles -
Extension of the Breakwater at St-Georges-de-Malbay Harbour
St-Georges-de-Malbay Harbour -
Drainage, lighting, and repair work on existing fencing, installation of a megadome (temporary) and a reservoir at Sept-Îles Airport
Sept-Îles Airport -
Sept-Îles Airport - Remplacement of a reservoir
Sept-Îles Airport -
Land development work, ground elevation, and demolition of the existing building at Sept-Îles Airport.
Sept-Îles Airport -
Enclosure Drainage at Sept-Iles Airport, Quebec
Sept-Iles Airport -
Reconstruction of runway 09-27 and rehabilitation of traffic lanes A, B, C, D and apron at Sept-Îles Airport
Sept-Îles Airport -
Dismantling of infrastructure at Heath Point telecommunications site
Heath Point -
Pointe-aux-Basques wharf modernization project at the Port of Sept-Îles
Pointe-aux-Basques -
Construction of 150 housing units and supporting infrastructures.
Uashat -
Renovation of hangar 6 at Mgr-Blanche terminal of the Port of Sept-Iles, to create a cruise passenger reception pavilion
Port of Sept-Îles -
Installation and Operation of a Water Intake and Discharge System – UMEK Expansion
Sept-Iles -
Renovation of the Mgr-Blanche terminal at the Port of Sept-Iles
Port of Sept-Iles -
Dock Repair - His Majesty's Canadian Ship Jolliet, Sept-Îles
Sept-îles marina -
BA042154 Heating system conversion - Buildings B300/B301
HMCS Jolliet, in the city of Sept-Îles -
Decontamination and deconstruction of buildings and installations - Ile du Corossol
Corossol Island