Modification of Hydro-Québec facilities, including the construction of a new sectioning post to optimize and integrate energy produced by a forest biomass cogeneration plant in Opitciwan
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Project summary: The project involves modifying Hydro-Québec (HQ) facilities in Opitciwan's stand-alone power system to optimize and integrate energy produced by a new 4.8 MW forest biomass cogeneration plant owned by a third party. To enable this integration, HQ must modify and modernize its facilities to increase its capacity to manage more renewable energy. The project includes:
- Clearing 41,600 square meters of forest for the new sectioning post, its access road, and connection lines;
- Construction of a new sectioning post including a building (control/garage), a transit house with septic system, and installation of a 4 MW energy storage system (ESS);
- Modification of an existing road and addition of a new section of road to access the new sectioning post;
- Construction of a new 1.5 m culvert in the new section of road;
- Installation of distribution lines connecting the new sectioning post and the forest biomass cogeneration plant to the existing HQ network;
- Adaptation of existing automation systems to integrate energy produced from biomass;
- Replacement of equipment at the existing thermal power plant to ensure compatibility with the use of an ESS;
- Addition of three oil recovery basins and a prefabricated oil separator well to the existing plant;
- Addition of telecommunications architecture to each facility.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination- Housing, Infrastructure and Communities Canada and Indigenous Services Canada | - | September 15, 2025 |
Contacts
Environmental Advisor (Qc)320 St. Joseph St E Q
Québec, Quebec G1K 9J2
Email: qcevalenvenvassessqc@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Opitciwan (Quebec)
-
Nature of Activity
- Building and Property Development
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2025-07-18 -
Proponent
Hydro Québec -
Authorities
- Indigenous Services Canada
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
89742
Nearby assessments
...within 200 kilometres-
Improving the reliability of Obedjiwan's stand-alone power grid by adding the equipment and infrastructure needed to integrate renewable energy from the future forest biomass power plant.
Obedjiwan -
Opitciwan Cogeneration Plant project
Atikamekw d'Opitciwan Obedjiwan 28 Reserve -
Construction of a cogeneration plant
The Atikamekw of Opitciwan -
New (Single) Tower Construction - Atikamekw d'Opitciwan
Obedjiwan Indian Reserve No.28 Project site 1: -
New (Single) Tower Construction - Atikamekw d'Opitciwan
Obedjiwan Indian Reserve No.28 Project site 2: -
Environmental rehabilitation at the Opitciwan Power Station
Opitciwan -
Construction of a new pediatric center "Mamonitokiwan center"
Council of the Atikamekw Nation -
Extension of Amisk Street in Opitciwan
Opitciwan -
Air medic heliport at Obedjiwan
Obedjiwan -
Lac Windfall Mine Project
Eeyou Istchee-James Bay Territory -
Refurbishment of Waratinack Street and relocation of the pumping station
Wemotaci Atikamekw Council -
Wemotaci Residential Development
Wemotaci -
Construction of an Atikamekw training centre in Wemotaci
Wemotaci -
Conversion of the heating system at the arena of Wemotaci
Wemotaci -
Tciman (PAPAR) Center in Wemotaci
Wemotaci -
New (Single) Tower Construction - Communauté de Wemotaci
Wemotaci Project site 1: -
Residential Development Phase 2 East in Wemotaci
Wemotaci -
Construction of new fire station
Wemotaci Atikamekw Council -
Site redevelopment of the ecocenter in Wemotaci
Wemotaci -
Construction of a municipal garage in Wemotaci
Wemotaci -
Wemhab: Prefabricated house factory
Wemotaci -
BlackRock Mining Project
Chibougamau, Lemoine Township -
Mont Sorcier Mining Project
Eeyou Istchee James Bay Territory -
Increase of the drinking water reserve - Manawan
Manawan -
Extension of Asati, Pirew and Wapistan streets (Manawan)
Manawan -
Construction of a new primary school in Manawan
Manawan -
Pirew Sector Development (A, B and I) in Manawan
Manawan -
Construction of a new baseball field for Anicinabe community of Lac Simon
Anicinabe community of Lac Simon -
Normandin Heating System Project
Normandin -
Development of new subdivisions along Lac Simon
Nation Anishnabe du Lac Simon -
Upgrading and refurbishing a wastewater treatment plant on the Lac Simon reserve
Lac Simon Reserve -
Bell Mobility - Telecommunications Tower - Lac Simon, Quebec, (QC)
Near rue Lac Simon, in the Anishnabe First Nation Community of Lac Simon, J0Y 3M0. -
Maisons-Embio Lac Simon Inc.
Lac Simon -
Construction of a new fire station for Anicinabe community of Lac Simon
Lac Simon Reserve -
Renard Diamond Mine Project
Mistissini -
Construction of a fire station
Mashteuiatsh -
Construction of an administrative office with annexed mechanical workshop
Mashteuiatsh -
Development of 6 lots on Mahikan Street in Mashteuiatsh
Mashteuiatsh -
Infrastructure extension and resurfacing of Ouiatchouan Street North
Mashteuiatsh -
Implementation project of a wood processing plant- Sciage GP
Mashteuiatsh -
Mahikan Street Extension - Industrial Park Area
Mashteuiatsh -
Sécurité Mahikan- wharehouse and garage
Mashteuiatsh -
Revitalization and redevelpment of the Uashassihtsh site in Mashteuiatsh
Mashteuiatsh -
Novador Gold Mine Project
Val d'Or