Airport Surface Infrastructure Improvements, St. Anthony, NL

Transport Canada is proposing necessary surface infrastructure upgrades at the St. Anthony Airport, NL. Work will consist of milling the runway, taxiway, apron, parking lot and airport access road to a depth of 40 mm and resurfacing with new Hot Mix Asphaltic Concrete (HMAC). Regrading the shoulders of the paved aircraft movement areas, as well as rehabilitating concrete curb, gutter, and catch basins to enhance drainage will also be undertaken. Lighting, marking, and signage upgrades will also be done to ensure adherence to TP312 Aerodrome Standards and Recommended Practices 5th edition. At the same time, existing water and sewer lines located underneath the paved surface adjacent to the Airport Terminal Building (ATB) and Maintenance Garage will be replaced and these areas repaved


Latest update

November 29, 2023 – Transport Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Transport Canada
Melissa Ginn, Regional Environmental Advisor
10 Barter's Hill
St. John's, Newfoundland and Labrador A1C 6M1
Telephone: 709-351-3200 or 1-888-675-6863
Email: melissa.ginn@tc.gc.ca


  • Location

    • St. Anthony (Newfoundland and Labrador)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2023-10-19
  • Proponent

    Transport Canada
  • Authorities

    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    86027