Wharf Construction, Pinsent's Arm, Labrador
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
DFO, Small Craft Harbour intends to construct a new finger pier wharf at the Pinsent's Arm SCH site. The proposed project will involve the construction of a new finger pier wharf at the southeast corner of the existing marginal wharf. The structure will be constructed in a new footprint using treated timber cribwork and will have a reinforced concrete deck. The project will also include the installation of a four electrical pedestals and three light poles which will be tied into a new electrical shed.
Latest update
February 18, 2025 – The Federal Authorities have issued their Notice of Determination after evaluation of the wharf construction at Pinsent’s Arm SCH and have determined that the project is not likely to cause significant adverse environmental effects and can therefore proceed.
This determination was based on a consideration of the following factors:
- Impacts on rights of Indigenous peoples;
- Community and Indigenous knowledge;
- Comments received from the public; and
- Technically and economically feasible mitigation measures.
Mitigation measures taken into account for this determination are:
- All work to be conducted in accordance with the Species at Risk Act, which outlines that no protected species, their residence and critical habitat be moved or obstructed during the construction or operation phase of the project.
- Species listed under the Species at Risk Act shall not be approached throughout the construction or operation phase of the project.
- All work to be conducted in accordance with the Migratory Birds Convention Act, which outlines that no migratory bird nests or eggs will be moved or obstructed during the construction or operation phase of the project.
- Concentrations of seabirds, waterfowl, or shorebirds shall not be approached when anchoring equipment, accessing wharves, or ferrying supplies.
- To minimize the possibility of fish habitat contamination and the spread of aquatic invasive (alien) species, all construction equipment which will be immersed into the water or has the possibility of coming into contact with such water during the course of the work, must be cleaned and washed to ensure that they are free of marine growth and alien species.
- Weather conditions are to be assessed on a daily basis to determine the risk of extreme weather in the project areas. Avoid work during periods which Environment and Climate Change Canada has issued rainfall, wind or wave warning for the work area.
- An Erosion and Sediment Control Plan will be developed for the site that minimizes risk of sedimentation to the marine environment.
- Ensure that all in-water activities, or associated in-water structures, do not interfere with fish passage.
- Wash, refuel and service machinery and store fuel and other materials for the machinery in such a way as to prevent any deleterious substances from entering the water.
- Construction material and debris are not to become waterborne. Do not dispose of any materials or waste into marine environment.
- All equipment to be used in or over the marine environment is to be free from leaks or coating of hydrocarbon-based fluids and/or lubricants harmful to the environment. Hoses and tanks are to be inspected on a regular basis to prevent fractures and breaks.
- On site, crews must have emergency spill clean-up equipment adequate for the activity involved, and it must be on site. Spill equipment will include, as a minimum, at least one 250 L (i.e., 55 gallon) overpack spill kit containing items to prevent a spill from spreading; absorbent booms, pillows, and mats; rubber gloves; and plastic disposal bags. All spills or leaks must be contained, cleaned up, and reported to the 24-Hour Environmental Emergencies Report System (1-800-565-1633).
- Ensure that waste is not left at the work site. All construction waste material will be disposed of in a provincially approved manner.
- Workers in contact with hazardous materials must be provided with and use appropriate personal protective equipment.
- Proper safety procedures must be followed throughout the duration of the project as per applicable municipal, provincial, and federal regulations.
- Dispose of and stabilize all excavated material above the ordinary high water mark or top of bank of nearby waterbodies and ensure sediment re-entry is prevented.
- Replace/restore any temporarily disturbed habitat features and remediate any areas impacted by the works, undertakings or activity.
- Sediment controls will be visually monitored throughout the life of the project, and repaired immediately if necessary.
- Any debris or waste material will be disposed of in a provincially approved manner.
- Dust control should be provided for construction activities and open soil areas, primarily by using fresh water.
- Work is to be carried out during hours agreed upon with the Departmental Representative to mitigate any disturbance to harbour users and residents.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 3 | Notice of Determination | - | February 18, 2025 |
| 2 | End of Public Comment Period | - | November 2, 2024 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | October 2, 2024 |
Contacts
Fisheries and Oceans CanadaPaul Curran, Regional Engineer
John Cabot Building
St John's
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: Paul.Curran@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- The Pinsent's Arm SCH is located on the south side of St. Michael's Bay, on the east coast of Labrador. (Newfoundland and Labrador)
-
Nature of Activity
- Pulp and paper
-
Assessment Status
Completed -
Start Date
2024-10-02 -
Proponent
Fisheries and Oceans Canada - Small Craft Harbours (DFO-SCH) -
Authorities
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
88953
Nearby assessments
...within 200 kilometres-
DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL
DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL -
Launchway Construction, Charlottetown, Labrador
Charlottetown, Newfoundland -
Foxtrot Rare Earth Element Mine Project
10 kilometres west of St. Lewis -
Building Upgrades - St. Lewis, NL
St. Lewis -
DFO-SCH Harbour Development, Lodge Bay, NL
Lodge Bay, Newfoundland Labrador -
Saddle Island Interpretive Circuit
Red Bay National Historic Site of Canada -
Off-grid conversion of lighthouse buildings on Saddle Island
Red Bay National Historic Site of Canada -
Saddle Island Boardwalk Renewal
Red Bay National Historic Site of Canada -
Cape Norman Radar Communication site
Cape Norman -
L'Anse aux Meadows National Historic Site Viking Silhouette Trail Work
L'Anse aux Meadows National Historic Site of Canada -
Highway 436 and Parking Lot Rehabilitation at L'Anse aux Meadows NHS
L'Anse aux Meadows National Historic Site of Canada -
Harbour Redevelopment, Raleigh, Newfoundland
Raleigh -
Small Boat Basin Construction, Cartwright, Newfoundland Labrador
Cartwright -
Red Bay Underwater Archaeology Reburial Mound Repairs
Red Bay National Historic Site -
Escape Island Installation on Saddle Island
Red Bay National Historic Site -
Airport Surface Infrastructure Improvements, St. Anthony, NL
St. Anthony -
St. Anthony - Floating Dock Storage
St. Anthony, Newfoundland -
Mealy Mountain Radio Repeater Construction
Akami-UapishkU-KakKasuak-Mealy Mountains National Park Reserve -
Easement Request at L'Anse aux Meadows National Historic Site
L'Anse aux Meadows National Historic Site -
Labrador-Island Transmission Link Project
Mistaken Cove -
Labrador-Island Transmission Link Project
Forteau -
Construction of a new breakwater and service area at the Grand quai des pêcheurs - Blanc-Sablon, Côte-Nord
Blanc-Sablon fishing harbour -
Lourdes-de-Blanc-Sablon Airport - Demolition and reconstruction of a hangar
Lourdes-de-Blanc-Sablon Airport -
Removal of Above Ground Storage Tanks at Lourdes-de-Blanc-Sablon Airport
Lourdes-de-Blanc-Sablon Airport -
Installation of a 50,000 L reservoir at the Lourdes-de-Blanc-Sablon airport
Lourdes-de-Blanc-Sablon Airport -
Lourdes-de-Blanc-Sablon Airport, Québec - new sensors installation
Lourdes-de-Blanc-Sablon -
Consolidation of the small fishermen's wharf - Blanc-Sablon, Côte-Nord
Blanc-Sablon Small fishers's wharf -
Fence deviation at Lourdes-de-Blanc-Sablon Airport, Blanc-Sablon, Quebec
Lourdes-de-Blanc-Sablon Airport -
St. Barbe Ranges Replacement
St. Barbe -
Application for a special event permit to allow a snowmobile event to pass through Akami-Uapishku - KakKasuak - Mealy Mountains National Park Reserve
Akami-Uapishk?-KakKasuak-Mealy Mountains National Park Reserve