Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

126235 results

Project New Fibre Installation - Gulf Islands

  • Location (Project Site 1:TSA XANA 18, British Columbia) (Project Site 2: Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90453
  • Last Modified: 2026-06-07
  • Relevance: 414.89
  • City West Cable & Telephone Corp. plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Mowachaht/Muchalaht and Sidney Island community. The project involves the installation of approximately 3 km of underground fiber optic cable. The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.

Project Parks Canada Agency Sulphur Mountain Boardwalk Repairs

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90456
  • Last Modified: 2026-06-07
  • Relevance: 414.89
  • Parks Canada plans to complete various repairs along the Sulphur Mountain Boardwalk. The work will involve repairing concrete and sonotube foundations, as well as worn steel railing posts and vertical support frames. The repairs will take place in two phases over two summers. The first phase will occur in summer 2026 and will focus on steel repairs. This work is expected to last eight weeks. The second phase will take place in summer 2027 and will involve foundation repairs over a four-week ...

Project Mortier Bay Marine Terminal Project

  • Location (Mortier Bay Marine Terminal, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90452
  • Last Modified: 2026-06-07
  • Relevance: 414.89
  • Project Description Mortier Bay Marine Terminal Ltd. is planning to construct and operate the Mortier Bay Marine Terminal (MBMT; the "Project"), a multi-purpose marine terminal that will support regional marine transportation and economic development. The Project will be located on the northern shore of Mortier Bay, near Marystown, NL. MBMT's proposed marine infrastructure will consist of a marginal wharf complex that can be built through a basic sheet pile and infill ...

Project Infield Concourse Hardstands & Taxiway Connections

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90445
  • Last Modified: 2026-06-06
  • Relevance: 414.78
  • The Proposed Project: Infield Concourse Hardstands & Taxiway Connections  This project involves the following: As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, Infield Concourse Hardstands and associated infrastructure are proposed to be constructed on the Airfield. The new Infield Concourse Hardstands are to be located just northwest of the existing Infield ...

Project Spring Creek Triple Box Culvert Relief Pipe

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90444
  • Last Modified: 2026-06-06
  • Relevance: 414.78
  • Proposed Project: Spring Creek Triple Box Culvert Relief Pipe As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, a relief pipe is proposed at the Spring Creek Triple Box Culvert to ensure the continuous operation of Airport Operation and aircraft movement. Spring Creek is a watercourse that enters the airport from the north under Derry Road and crosses under the runway and taxiways ...

Project Pasqua First Nation Solid Waste Transfer Station

  • Location (Treaty Four Reserve Grounds 77, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90454
  • Last Modified: 2026-06-06
  • Relevance: 414.78
  • Pasqua First Nation is proposing to construct a new solid waste transfer station. The solid waste transfer station facility will include construction of an access road, a small building, roadways, collection bins and retaining walls at drop off/unloading locations. The project will be designed for a 25-year design horizon and will support a projected population of 3,473 people by the year 2049. The new transfer station will be located approximately 300 metres southwest of the existing Pasqua ...

Project Mount Helmcken telecommunications tower replacement

  • Location (Mount Helmcken, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90189
  • Last Modified: 2026-06-05
  • Relevance: 414.76
  • The Canadian Coast Guard (CCG)Has altered its planned Tower build at the Mt. Helmcken Communications site. The initial work plan will be the same as before, however instead of a free standing tower, a guyed tower will be installed. Below is the updated plan. This project is planned for August 2026 and will be conducted in four phases. In Phase 1, CCG crews will arrive on site and remove the antennas and salvageable equipment from the small tower located sixteen meters southwest of the ...

Project Gatineau Promenade Culvert Rehabilitation (P8)

  • Location (Gatineau Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90522
  • Last Modified: 2026-06-05
  • Relevance: 414.75
  • The National Capital Commission (NCC) is proposing the rehabilitation and replacement of an existing culvert under the Gatineau Promenade in Gatineau Park, located approximately 280 metres south of Chemin du Lac Meech (the Project). The culvert conveys water from a pond on the west side of the roadway to a wetland on the east side and has historically experienced repeated blockages, likely due to sediment accumulation and beaver activity. Following a significant rainfall event in August 2024, ...

Project Saddle Lake Cree Nation Pathway to Learning

  • Location (Saddle Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90300
  • Last Modified: 2026-06-05
  • Relevance: 414.74
  • Saddle Lake Cree Nation is proposing the development of a new pedestrian walkway, called "Pathway to Learning", a 2850 meter long 3 meter wide paved pathway that will connect the nearby 40 Acre Housing Development to the Saddle Lake Townsite. The pathway will start at the western boundary of 40 Acre moving east following the south side of Highway 652,  and continuing south along the west side of 50th St up to the SW 1 Road. Amenities along the pathway will include way-finding and ...

Project The Greenbank Municipal Transformer Station Project - Hydro Ottawa

  • Location (CFIA Campus, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90521
  • Last Modified: 2026-06-05
  • Relevance: 414.74
  • To ensure Ottawa's south west region has the power to grow, Hydro Ottawa Limited (Hydro Ottawa) will construct a new 27.6 kV municipal transformer station on Greenbank Road, approximately 450 metres south of the Hunt Club Road intersection. The station, to be constructed within the National Capital Region Greenbelt, will serve existing customers and support projected growth in electricity demand for new residential and commercial developments in south Nepean for many years to come. The ...

Project Development of artificial nesting sites for turtles

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80269
  • Last Modified: 2026-06-05
  • Relevance: 414.74
  • A 7.0 x 9.0-metre turtle nesting  site will be created in La Mauricie National Park. The organic soil present on this surface will be removed using motorized equipment. A geotextile will be put in place once the organic soil is removed to prevent vegetation regrowth. A minimum thickness of 30 cm of sand and gravel with a diameter of less than 20 mm will be added above the geotextile over the entire area to provide a suitable substrate for turtle nesting. The top and bottom of the bank will ...

Project Bell AI Fabric Data Centre Project

  • Location (Rural Municipality of Sherwood, Saskatchewan)
  • Assessment Type: Request for designation not applicable
  • Status: Completed
  • Reference Number: 90514
  • Last Modified: 2026-06-05
  • Relevance: 414.74
  • Bell Canada is proposing to construct a new data centre in the Rural Municipality of Sherwood, Saskatchewan. As proposed, the Bell AI Fabric Data Centre Project would involve the development of a 300-megawatt industrial artificial intelligence data centre on a 65-hectare agricultural site. Electricity for the project would be supplied through the provincial electrical grid. Additionally, project activities include pre-construction geotechnical and piling depth testing, site preparation and ...

Project Fire Hall 27 Demolition

  • Location (Calgary International Airport, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90520
  • Last Modified: 2026-06-05
  • Relevance: 414.73
  • Lot MK.13 at the Calgary International Airport currently houses a 1960's two-storey 7200 sqft. Building T042 (old Fire Hall 27) that is slated for demolition. The project will disconnect, decommission, cap, mark, and where necessary, remove all utilities including electricity, gas, sanitary, and water lines at the closest t-junction / manhole / junction box adjacent to the building within the property line and remove and dispose of the existing building, including any hazardous materials, ...

Project Rideau Canal Wall Repairs

  • Location (Rideau Canal National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90504
  • Last Modified: 2026-06-05
  • Relevance: 414.72
  • This project involves rehabilitation of a section of vertical concrete retaining wall that is part of the Rideau Canal National Historic Site. The site is owned and operated by the Ontario Waterways Unit of the Parks Canada Agency. The project includes the rehabilitation of approximately 100 meters of the east canal wall section located along Colonel By Drive near Clegg Street, in Ottawa, Ontario. The proposed repairs would return the wall section to a "good condition" and includes ...

Project Petit-Gaspé Bridge embankment riprap rehabilitation

  • Location (Forillon National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90447
  • Last Modified: 2026-06-05
  • Relevance: 414.67
  • Parks Canada is planning to carry out corrective work on the Petit-Gaspé Bridge embankments to ensure the stability and long-term durability of the infrastructure. The riprap installed during previous work completed in 2017 has undergone progressive erosion, particularly as a result of hydrological flooding and winter storms, causing some of the material to be displaced into the watercourse bed. Following a technical inspection carried out in 2025, recommendations were made to restore ...

Project Piapot First Nation Commercial Office Building

  • Location (Piapot Urban Reserve, Regina, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90439
  • Last Modified: 2026-06-05
  • Relevance: 414.67
  • Young Dog Developments Limited Partnership (wholey owned entity of Piapot First Nation) is proposing to construct a new commercial office development on the Piapot Urban Reserve located at 1101 Angus Street in Regina, SK. The development project consists of a 24,392 sq. ft. two story retail and commercial office building and associated parking and landscaping. The development has been designed to be a multi-tenant facility with spaces available for individual retail and office spaces. The ...

Project O'Chiese First Nation Road Landslide Remediation Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90446
  • Last Modified: 2026-06-05
  • Relevance: 414.67
  • O'Chiese First Nation is proposing the construction of permanent stabilization works along O'Chiese I Road, located on reserve. The site has experienced progressive slope movement and roadway distress since 2021, resulting in the closure of the eastbound lane and installation of a temporary gravel detour. Project activities include the construction of a cast-in-place pile wall, culvert replacement, roadworks and grading. May 14 2026 - Proponent confirms cuvlert replacement no ...

Project Installation of a Permeable Adsorptive Barrier (PAB) at 22 Wing North Bay

  • Location (22 Wing North Bay, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90412
  • Last Modified: 2026-06-05
  • Relevance: 414.67
  • The Department of National Defence (DND) is proposing a project. DND is proposing to install a 250 m long in-situ permeable adsorptive barrier (PAB) to remediate groundwater impacted by per- and polyfluoroalkyl substances (PFAS) within the bedrock valley at 22 Wing North Bay. Pilot-scale testing will be conducted to evaluate the performance of colloidal activated carbon (CAC) products followed by full-scale implementation and long-term monitoring. Project activities will ...

Project River Cree Golf and Games Recreational Facility

  • Location (Enoch Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90448
  • Last Modified: 2026-06-05
  • Relevance: 414.67
  • Enoch Cree Nation is proposing the construction of a two-storey recreational facility with a footprint of 2,951 square meters. The main level of the building with a gross floor area of 2,462 sq m will contain a reception area, pro shop, office spaces, kitchen, restaurant, bar and lounge, arcade, pool, two party rooms, bathrooms, two (2) suites, mechanical rooms, golf equipment area, and golf 15 driving range launch pads (i.e. double decker driving range). The second level of the building, with ...

Project False Creek Small Craft Harbour Limited Sediment Remediation and Tidal Boat Grid Removal

  • Location (False Creek Harbour, Vancouver, 1505 West 1st Avenue, Vancouver, V6J 1E8, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90518
  • Last Modified: 2026-06-04
  • Relevance: 414.64
  • The Project is located in False Creek Inlet in Vancouver, British Columbia. Work to decommission the southern active boat grid and remediate the sediment in the northern grid of the False Creek Small Craft Harbour falls within the mandate of the Federal Contaminated Sites Action Plan to reduce environmental and human health risks from known federal contaminated sites. Tidal grids were typically used for vessel maintenance during low tide periods and these maintenance activities have the ...

Project OS-6891 Authorization to Construct and Operate a Surface Lease

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90393
  • Last Modified: 2026-06-04
  • Relevance: 414.64
  • A surface lease consisting of 2.3 ha. area for drilling and operating a multiwell oil padsite will be constructed and maintained for the operating life of the eight (8) proposed wells, then decommissioned and reclaimed before the lease agreement is surrendered. The project padsite will utilize a previously surveyed and recently reclaimed padsite. The padsite has been located to minimize impacts to adjacent wetlands and maintain a > 45 m setback. No fish bearing waterbodies or large, open ...

Project OS-6908 Authorization to Construct and Operate a Surface Lease

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90385
  • Last Modified: 2026-06-04
  • Relevance: 414.64
  • A surface lease consisting of 4.1 ha. area for drilling and operating a multiwell oil padsite will be constructed and maintained for the operating life of 20 proposed wells, then decommissioned and reclaimed before the lease agreement is surrendered. The project padsite will utilize a previously surveyed and recently reclaimed padsite, with an extension area to the west. The padsite has been located to utilize an existing access road and to avoid wetland areas. No fish bearing waterbodies or ...

Project Expansion of shed 43, Laurier terminal - Port of Montreal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 82987
  • Last Modified: 2026-06-04
  • Relevance: 414.63
  • The proposed project consists of expanding shed 43 located at the Laurier terminal of the Port of Montreal (section 43). The expansion will be carried out on the east side of the existing shed over an area of 3,700 m2. The architecture and color of the extension will be similar to the existing shed, but approximately 6.6m lower, or about 24 m high. The expansion of shed 43 will make it possible to compensate for the areas of sheds 39-40 that will eventually be demolished. It will also optimize ...

Project Fording River Extension Project

  • Location (Elkford, British Columbia)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80702
  • Last Modified: 2026-06-04
  • Relevance: 414.63
  • EVR Operations Limited is proposing to extend the life of its existing Fording River Operations, a metallurgical coal mine located approximately 15 kilometres northeast of Elkford, British Columbia. As proposed, the Fording River Extension Project would include project-specific components such as an open pit, waste-rock storage areas, warehouses, maintenance and fueling facilities, access roads, and linkages to Fording River Operations' power and utilities. The Fording River Extension ...

Project Raising the seabed at Quay 01 at the Contrecoeur Marine Terminal, Port of Montreal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88991
  • Last Modified: 2026-06-04
  • Relevance: 414.63
  • Wharf 01 at the Contrecoeur Terminal is a steel sheet pile wharf built in 1955 on the south shore of the St. Lawrence River. The original sea level at the wharf was -10.80 m (chart datum or ZDC). Over the years, the seabed in front of the wharf has gradually deepened as a result of the propellers and bow thrusters of ships docking and leaving the wharf, to the point where the seabed level is now -11.0 m to -13.5 m ZDC (according to a 2022 bathymetric survey), threatening the stability and ...

Project Twinning of the Trans-Canada Highway in Manitoba

  • Location (Whiteshell Provincial Park, Manitoba) (Whiteshell Provincial Park, Manitoba)
  • Assessment Type: Request for designation not applicable
  • Status: Completed
  • Reference Number: 90348
  • Last Modified: 2026-06-04
  • Relevance: 414.63
  • Manitoba Transportation and Infrastructure is proposing to construct two new lanes along a 16-kilometre stretch of the Trans-Canada Highway, about five kilometres west of Provincial Road 301 and near the Manitoba/Ontario border in Whiteshell Provincial Park, Manitoba. As proposed, the Twinning of the Trans-Canada Highway Project in Manitoba would involve expanding the existing two-lane highway into four lanes, rebuilding or replacing two interchanges, upgrading access at Hunt Lake and ...

Project Port of Quebec International Container Terminal Project

  • Location (Port of Quebec, Quebec)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 90511
  • Last Modified: 2026-06-04
  • Relevance: 414.61
  • QSL International Ltd. is proposing the development of an international container terminal at the Port of Québec, in the Beauport sector of Québec City. The project involves redeveloping land already operated by the proponent. This space would be used to store containers, with a maximum capacity of 200,000 twenty-foot equivalent units (TEUs) per year. The project would use existing wharves, would not encroach on the river and would not include any work in the water.

Project Sidney Operations Centre Fuel System and Dock Replacement

  • Location (Gulf Islands National Park Reserve of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90384
  • Last Modified: 2026-06-04
  • Relevance: 414.61
  • The proposed project involves the replacement of the existing marine fuel storage and dispensing system and marine docks at the Sidney Operations Centre within Gulf Islands National Park Reserve. These facilities have reached the end of their service life and require replacement to ensure marine operations can continue to function safely and efficiently. The dock layout will remain largely unchanged, with the replacement of existing piles and the potential installation of one additional pile. ...

Project Kwikwasut'inuxw Haxwa'mis First Nation - Seawall and Bioengineered Slope Construction

  • Location (Kwikwasut'inuxw Haxwa'mis First Nation - Seawall and Bioengineered Slope Construction, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85781
  • Last Modified: 2026-06-04
  • Relevance: 414.6
  • The Kwikwasut'inuxw Haxwa'mis First Nation (KHFN) aims to construct a new seawall and bioengineered slope to address natural threats to KHFN's Village of Gwa'yas'dums on Gilford Island. Construction of these assets would protect critical infrastructure and services within the community, and reduce risk of population displacement due to natural hazards. Project activites would occur on the KHFN's Gwayasdums No. 1 Indian Reserve lands.   The project would ...

Project Cascade Creek Restoration Large Woody Debris Installation

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90435
  • Last Modified: 2026-06-04
  • Relevance: 414.56
  • This project is part of the broader Cascade Creek Restoration Project, for which a Basic Impact Assessment (BIA) was approved by the Field Unit Superintendent in September 2018 (BNP 1008). The goal of this phase is to improve habitat suitability and instream cover for westslope cutthroat trout by adding large woody debris to the stream channel using post assisted log structures (PALS) and by felling select trees into the channel using a grip hoist. Instream cover is an essential habitat ...

Project Town of Banff 25DP108 Banff Trail Riders Visitor Interpretation Centre and Riding Arena

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90442
  • Last Modified: 2026-06-04
  • Relevance: 414.56
  • The Banff Trail Riders have proposed building a visitor interpretive centre and riding arena at 100 Sundance Road. The project will include removing several existing buildings across the site and combining their functions into a single, centrally located facility. It will also involve changes to the property's landscaping and underground utilities. Overall, the project aims to modernize the site, meet current health and safety requirements, and improve experiences for visitors and staff.

Project Parks Canada Agency Brazeau Lake Bridge Replacement

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85886
  • Last Modified: 2026-06-03
  • Relevance: 414.53
  • The Brazeau bridge is a stream-crossing on the Brazeau Loop hiking trail in Jasper National Park. The trail has been divided since the washout of this bridge in spring 2022. Parks Canada Agency proposes to replace the existing damaged wooden bridge with a sturdy pre-fabricated bridge made from fiberglass reinforced polymer (FRP). The bridge will be placed on two concrete piers and two wooden abutments. The piers will be constructed within the stream bed by pouring concrete into two 2m x 1 m x ...

Project Flowerpot Marl Bed Trail Restoration

  • Location (Fathom Five National Marine Park of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90516
  • Last Modified: 2026-06-03
  • Relevance: 414.53
  • This project involves the removal of 90 metres of boardwalk, three trail signs, and all mile marker signs along the Marl Bed Trail on Flowerpot Island, as well as the placement of natural deadfall and debris to camouflage the trail entrance. Due to the unique habitats and species found along the trail, and the impacts of visitor use (e.g., the creation of social trails), it was determined that the trail should be permanently closed and allowed to passively restore to a natural state. To support ...

Project Telus Communications Tower - Skeetchestn First Nation

  • Location (Skeetchestn First Nation reserve land, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90515
  • Last Modified: 2026-06-03
  • Relevance: 414.52
  • Telus Communications Inc. is proposing the installation of a new guyed radiocommunication antenna tower, 102 meters in height as a new telecommunications facility, located on Skeetchestn Reserve, B.C. The tower will include six (6) initial (8 ft.) antennas that will provide cellular, and data services in the area.  An Impact Assessment Act federal lands review was previously conducted by ISED for this project in 2025.  The project page for that review can be found ...

Project Bonaventure Expressway, Section 10: Box girder replacement, paving and repair of structural elements

  • Location (Peel Basin, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90513
  • Last Modified: 2026-06-03
  • Relevance: 414.51
  • Commissioned in 1967, the Bonaventure Expressway runs along the St. Lawrence River. It passes over industrial and port lands between the Samuel -De Champlain Bridge and downtown Montreal. It was built to provide direct access to downtown from southern areas of the city. The Bonaventure Expressway is 4.6 km long and encompasses roadway structures including overhead structures, non-elevated lanes, viaducts and the Clément Bridge. The Jacques Cartier and Champlain Bridges Incorporated ...

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road, Ontario)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2026-06-03
  • Relevance: 414.5
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 190 to 230 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could ...

Project Stillwater Creek Floodplain Wetland Restoration – Moodie Drive, Ottawa

  • Location (Stillwater Creek Floodplain Wetland Restoration - Moodie Drive, Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90416
  • Last Modified: 2026-06-03
  • Relevance: 414.45
  • The National Capital Commission (NCC), Real Estate and Development Branch, is proposing the construction of a wetland feature on NCC-owned federal lands at Field Trip Farm on Moodie Drive in Ottawa.   The project would be located within a low-lying area of previously cultivated agricultural land in the floodplain of a tributary to Stillwater Creek. The area periodically floods during high water events and has naturally evolved into a clearing within an existing hedgerow, providing ...

Project Maintenance dredging - 10619 Timberland Road

  • Location (Maintenance dredging - 10619 Timberland Road, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90437
  • Last Modified: 2026-06-03
  • Relevance: 414.45
  • Mainland Construction Materials proposes to remove accumulated sediments from the water lot area adjacent to 10619 Timberland Road, Surrey, to restore design depths for the safe moorage of barges and associated vessels during all tidal conditions. The applicant is seeking a multi-year permit to dredge periodically within the fish least risk window for the Fraser River. Total dredge area is approximately 2,250 square metres. Total dredge and disposal volume would be approximately 4,000 cubic ...

Project Geotechnical investigation – BC Hydro Second Narrows tower

  • Location (Geotechnical investigation - BC Hydro Second Narrows tower, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90436
  • Last Modified: 2026-06-03
  • Relevance: 414.45
  • The British Columbia Hydro and Power Authority (the Applicant), proposes to undertake geotechnical drilling around Tower 689 in the Burrard Inlet, east of the Iron Worker's Memorial Bridge. Up to six boreholes are proposed to be advanced in the intertidal zone and will be accessed through a combination of land-based and water-based methods. Land access will be provided from Railway Street, where drilling equipment will be mobilized from the upland area and tracked through the intertidal ...

Project GCT Deltaport Expansion - Berth Four Project

  • Location (Delta, British Columbia)
  • Assessment Type: Impact assessment by Review Panel
  • Status: In progress
  • Reference Number: 81010
  • Last Modified: 2026-06-02
  • Relevance: 414.42
  • GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. ...

Project Suncor Base Mine Extension Project

  • Location (3 kilometres north of Fort McMurray, Alberta)
  • Assessment Type: Impact assessment by Review Panel
  • Status: In progress
  • Reference Number: 80521
  • Last Modified: 2026-06-02
  • Relevance: 414.42
  • Suncor Energy Inc. is proposing to develop the Base Mine Extension Project to sustain the supply of bitumen to the existing upgraders at Suncor's Oil Sands Base Plant operation (Base Plant). The project includes an open-pit mining operation and associated infrastructure to supply bitumen to new froth production facilities and various other production facilities at the existing Base Plant. The project is located adjacent to existing Base Plant operations approximately three kilometres north ...

Project Construction of Accommodation Buildings - Canadian Forces Base Valcartier

  • Location (Canadian Forces Base Valcartier, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88901
  • Last Modified: 2026-06-02
  • Relevance: 414.41
  • The Department of National Defence (DND) is proposing a project. The project consists of building a series of residential buildings with 23 rooms on two levels and an area of approximately 1055 m² to meet the accommodation needs at Valcartier Military Base.

Project Lynn Lake Gold Project

  • Location (Lynn Lake, Manitoba)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80140
  • Last Modified: 2026-06-02
  • Relevance: 414.41
  • Alamos Gold Inc. is proposing the construction, operation, decommissioning, and reclamation of an open pit gold mine and new metal mill located approximately 1000 kilometres north of Winnipeg, near the Town of Lynn Lake, Manitoba. The Lynn Lake Gold Project would involve the redevelopment of two historical gold mines (the Gordon site and MacLellan site) and have an ore input capacity of 8,250 tonnes per day over approximately 17 years. Components of the project would include new ...

Project Fredericton Farm Services Building Replacement Project

  • Location (Fredericton, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90480
  • Last Modified: 2026-06-02
  • Relevance: 414.4
  • Project Description: Agriculture and Agri-Food Canada intends to build a new 1,326 m2 farm services building and demolish an old 2,060 m2 building at the Fredericton Research and Development Center. The development work will also include: 1. road and parking lot improvements, 2. utility hookups, and 3. building landscaping.

Project Recapitalize Parking Lot Fort Frontenac North – CFB Kingston

  • Location (Fort Frontenac North, CFB Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90512
  • Last Modified: 2026-06-02
  • Relevance: 414.4
  • The Department of National Defence (DND) is proposing a project. This Project will be completed at Building FF10 (Normandy Hall, 346 Ontario Street). The project area will include the existing parking lot and adjacent drainage swales. Project work will include, but is not limited to: Removal of existing asphalt; Raising and adjusting the grade (elevation) throughout the lot and perimeter to eliminate ponding water, including adjusting a minor surface collection swale, which will ...

Project Dredging and Riprap Installation - Victoria Harbour

  • Location (Victoria, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 89937
  • Last Modified: 2026-06-01
  • Relevance: 414.33
  • Ralmax Properties Limited is proposing to install a new barge ramp facility adjacent to 343 Bay Street in Victoria, B.C. Activities associated with the project include dredging and the installation of piles, riprap, winches, and a steel barge ramp.    Transport Canada (TC) is reviewing the project for approval under the Public Ports and Public Port Facilities Regulations (PPPPFR), as the proposed project falls within lands administered by Transport Canada. TC will ...

Project Upper Similkameen Indian Band - Water System Upgrades

  • Location (Chuchuwayha I.R. No. 2, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90181
  • Last Modified: 2026-06-01
  • Relevance: 414.32
  •   The Upper Similkameen Indian Band (USIB) is completing the detailed design for the domestic water system (DWS) improvements on Chuchuwayha I.R. No. 2 near Hedley, BC. The purpose of this project is to provide safe and reliable domestic water to the community of Chuchuwayha.   The Project will include the following major infrastructure: Two (2) water supply wells; Pump installation into wells; Water treatment plant ...

Project Enoch Cree Nation Thermal Spa Recreational Facility

  • Location (Enoch Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90510
  • Last Modified: 2026-06-01
  • Relevance: 414.31
  • Enoch Cree Nation is proposing the construction of a two storey thermal spa building with a footprint of 2,896 square meters. Project components will also include installation of utility lines including water, power, sanitary sewer and storm sewer lines, and communication cables, construction of a parking lot with 187 parking stalls, and construction of the outdoor spa area containing pools, saunas, steam rooms, huts, and amenities.

Project STZ'UMINUS FIRST NATION COASTAL EROSION MITIGATION

  • Location (Kulleet Bay, Chemainus 13 reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89321
  • Last Modified: 2026-06-01
  • Relevance: 414.31
  • The Stz'uminus First Nation (SFN) is proposing the Coastal Erosion Mitigation Project (Project), which involves the design and implementation of a beach nourishment and headland system. This initiative is intended for two shoreline areas situated within Kulleet Bay, on their Chemainus 13 reserve, referred to as the Village Shoreline and the Cemetery Shoreline. The objective of the Project is to provide protection from erosion, and is not a flood protection project. The project aims to ...

Last ModifiedDisplay Filters

Filters

Authorities Display Filters

Date modified: