Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector

Registry Search Mobile

Registry Search

Skip to Filters

1438 results

Document Environmental Assessment Decision Statement

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 948
  • Document Date: 2021-06-29
  • Document: 140599E.html
  • Relevance: 254.53
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Québec Port Authority c/o Mario Girard, Chief Executive Officer 150 Dalhousie Street, P.O. Box 80, Station Haute-Ville Québec (Québec) G1R 4M8 for the Laurentia Project: Port of Quebec Deep-Water Wharf – Beauport Sector Description of the Designated Project The Québec Port Authority is proposing to extend the line of the existing wharf eastward by 610 metres in order to operate a ...
3 alternate formats found
English PDF
  • Relevance: 254.53
  • 1 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Québec Port Authority c/o Mario Girard, Chief Executive Office 150 Dalhousie Street, P.O. Box 80, Station Haute-Ville Québec (Québec) G1R 4M8 for the Laurentia Project: Port of Quebec Deep-Water Wharf – Beauport Sector Description of the Designated Project The Québec Port Authority is proposing to extend the line of the existing wharf eastward by 610 metres in ...
French PDF
  • Relevance: 203.53
  • 1 Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Administration portuaire de Québec a/s Mario Girard, Président-directeur général 150, rue Dalhousie, C.P. 80, succ. Haute-Ville Québec (Québec) G1R 4M8 pour le Projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur Beauport Description du projet désigné L'Administration portuaire de Québec propose de prolonger la ligne du quai ...
French HTML
  • Relevance: 203.53
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Administration portuaire de Québec a/s Mario Girard, Président-directeur général 150, rue Dalhousie, C.P. 80, succ. Haute-Ville Québec (Québec) G1R 4M8 pour le Projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur Beauport Description du projet désigné L'Administration portuaire de Québec propose de prolonger la ligne du quai actuel vers ...

Document News Release - Environmental Assessment Decision Statement

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: News Releases
  • Reference Number: 947
  • Document Date: 2021-06-29
  • Document: 139514E.html
  • Relevance: 254.53
  • News Release The Government of Canada releases its final decision on the Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector June 29, 2021 — Ottawa — Impact Assessment Agency of Canada The Government of Canada is committed to developing Canada's marine transportation sector and creating good middle-class jobs, while recognizing that a strong economy and a clean environment must go hand in hand. Following a thorough and rigorous environmental assessment, the Impact ...
1 alternate format found
French HTML
  • Relevance: 203.53
  • Communiqué de presse Le gouvernement du Canada publie sa décision finale au sujet du projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur Beauport Le 29 juin 2021 — Ottawa — Agence d'évaluation d'impact du Canada Le gouvernement du Canada est déterminé à développer le secteur du transport maritime du Canada et à créer de bons emplois pour la classe moyenne, et il reconnaît qu'une économie prospère et un environnement sain doivent aller de pair. Suite à une évaluation ...

Document Environmental Assessment Report

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 945
  • Document Date: 2021-06-10
  • Document: 139308E.pdf
  • Relevance: 253.46
  • Laurentia Project: Port of Québec Deep-Water Wharf – Beauport Sector ENVIRONMENTAL ASSESSMENT REPORT June 2021 IMPACT ASSESSMENT AGENCY OF CANADA LAURENT IA: PORT OF QUÉBEC DEEP-WATER WHARF – BEAUPORT SECT OR i © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2021. Catalogue No: En106-238/2021E-PDF ISBN : 978-0-660-38704-8 This ...
1 alternate format found
French PDF
  • Relevance: 202.46
  • Projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur de Beauport RAPPORT D’ÉVALUATION ENVIRONNEMENTALE Juin 2021 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PROJET LAURENTIA : QUAI EN EAU PROFONDE DANS LE PORT DE QUÉBEC – SECTEUR BEAUPORT i © Sa Majesté la Reine du chef du Canada, représentée par le ministre de l’Environnement et du Changement climatique, 2021. Numéro de ...

Document Notice of Referral with Reasons

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 946
  • Document Date: 2021-06-10
  • Document: 139328E.html
  • Relevance: 253.46
  • Laurentia Project : Port of Quebec Deep-Water Wharf — Beauport Sector Minister of Environment and Climate Change's section 52 decision under the Canadian Environmental Assessment Act, 2012 June 10, 2021 — As part of its assessment of the Laurentia Project: Deepwater Wharf in the Port of Quebec - Beauport Sector, the Impact Assessment Agency of Canada concluded that the project is likely to cause significant adverse direct and cumulative environmental effects on fish and fish habitat, air ...
1 alternate format found
French HTML
  • Relevance: 202.46
  • Projet Laurentia : Quai en eau profonde dans le port de Québec - Secteur Beauport Décision du ministre de l'Environnement et du Changement climatique au titre de l'article 52 de la Loi canadienne sur l'évaluation environnementale (2012) Le 10 juin 2021 — Dans le cadre de son évaluation du projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur Beauport, l'Agence d'évaluation d'impact du Canada a conclu que le projet était susceptible d'entraîner des effets environnementaux ...

Document Laurentia Public Consultation Presentation

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 477
  • Document Date: 2020-12-06
  • Document: 137123E.pdf
  • Relevance: 243.54
  • Laurentia Project: Deep-water wharf in the Port of Québec - Beauport Sector CONSULTATION ON THE DRAFT ENVIRONMENTAL ASSESSMENT REPORT IMPACT ASSESSMENT AGENCY OF CANADA 2 • Objectives of the consultation sessions • Federal Environmental Assessment Process under the Canadian Environmental Assessment Act (CEAA 2012) • Themes - Key Findings and mitigation Measures • Next Steps Presentation outline IMPACT ASSESSMENT AGENCY OF CANADA 3 • Inform the public of : • ...
1 alternate format found
French PDF
  • Relevance: 192.54
  • Projet Laurentia : Quai en eau profonde dans le port de Québec - Secteur Beauport CONSULTATION SUR LA VERSION PROVISOIRE DU RAPPORT D’ÉVALUATION ENVIRONNEMENTALE AGENCE D’ÉVALUATION D’IMPACT DU CANADA 2 • Objectifs des séances de consultation • Processus d’évaluation environnementale fédéral en vertu de la Loi canadienne sur l’évaluation environnementale (LCÉE 2012) • Thématiques – Principales conclusions et mesures d’atténuation • Prochaines étapes Plan de la ...

Document Virtual Information Sessions - Zoom links and Instructions

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 358
  • Document Date: 2020-11-18
  • Document: 136760E.pdf
  • Relevance: 242.63
  • ZOOM USER GUIDE Virtual information sessions for Laurentia will be done using Zoom. How to connect to the Zoom Virtual Sessions? December 8, 2020 : December 10, 2020 The Agency invites you to the following virtual information session: Topic : Laurentia Project – First Session Date and Time : December 8 at 4:30 p.m. EST (USA and Canada) Join the meeting: https://us02web.zoom.us/j/81285698664?pw d=UGJjKzYzRjlCMjZiOGY2ZWhqMDhJQT09 Meeting ID : 812 8569 8664 Secret code : 612746 One tap ...
1 alternate format found
French PDF
  • Relevance: 191.63
  • GUIDE D’UTILISATION ZOOM Les séances d’information virtuelles pour le projet Laurentia se feront en utilisant l’outil Zoom. Comment se connecter aux séances virtuelles sur Zoom? Le 8 décembre 2020 : Le 10 décembre 2020 L'Agence vous invite à la séance d'information virtuelle suivante: Sujet : Projet Laurentia: Première séance Heure : 8 déc. 2020 à 16 h 30 Heure normale de l’Est (États-Unis et Canada) Participer à la réunion Zoom https://us02web.zoom.us/j/81285698664?pw ...

Document Draft Environmental Assessment Report

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: For Public Participation
  • Reference Number: 356
  • Document Date: 2020-11-16
  • Document: 136694E.pdf
  • Relevance: 242.53
  • Laurentia Project: Port of Quebec Deep-Water Wharf – Beauport Sector DRAFT ENVIRONMENTAL ASSESSMENT REPORT November 2020 IMPACT ASSESSMENT AG ENCY OF CANADA D R A F T E N V IR O N ME N T AL E A SS E S S M E NT R E P O R T – L A U REN T IA P R O JE C T : P O R T O F Q U E B E C D E E P - W A T E R W H A RF – B E A U P O RT S E C T O R i © Her Majesty the Queen in Right of Canada, ...
1 alternate format found
French PDF
  • Relevance: 191.53
  • Projet Laurentia : Quai en eau profonde dans le port de Québec – Secteur de Beauport RAPPORT PROVISOIRE D’ÉVALUATION ENVIRONNEMENTALE Novembre 2020 AGENCE D’ÉVALUATION D’ IMPAC T DU CANADA R A P P O R T P R O V I S O I R E D ’ É V A L U A T I O N E N V I R O N N E M E N T A L E – P R O J E T L A U R E N T I A : Q U A I E N E A U P R O F O N D E D A N S L E P O R T D E Q U É B E C – S E C T E U R D E B E A U P O R T i ...

Document Roles and expertise of Government of Canada and Government of Quebec departments participating in the working group

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 57
  • Document Date: 2017-01-04
  • Document: 116704E.pdf
  • Relevance: 201.95
  • 1 Port of Quebec Deep-Water Multipurpose Wharf Project - Beauport 2020 Roles and expertise of Government of Canada and Government of Quebec departments participating in the working group For the Port of Quebec Deep-Water ...
1 alternate format found
English HTML
  • Relevance: 201.95
  • Roles and expertise of Government of Canada and Government of Quebec departments participating in the working group For the Port of Quebec Deep-Water Multipurpose Wharf Project - Beauport 2020, the Canadian Environmental Assessment Agency (the Agency) set up a federal environmental assessment committee made up of representatives from federal departments and Quebec's Department of Sustainable Development, Environment and the Fight Against Climate Change (MDDELCC), which will be responsible for ...

Document Procedure and Participation Rules for Public Sessions

  • Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector
  • Document Category: Additional Information
  • Reference Number: 56
  • Document Date: 2017-01-04
  • Document: 116703E.pdf
  • Relevance: 201.95
  • 1 Procedure and participation rules Public session - Analysis of the Quebec Port Authority’s Environmental Impact Statement Port of Quebec Deep-Water Multipurpose Wharf Project - Beauport 2020 Federal Environmental Assessment 1. Introduction 1.1. This document sets out the procedures to be followed by participants in the public sessions scheduled for February 1st and 2nd, 2017 between 6:15 p.m. and 10:00 p.m. on the review of the Environmental Impact Statement for the Port ...
1 alternate format found
English HTML
  • Relevance: 201.95
  • Port of Quebec Deep-Water Multipurpose Wharf Project - Beauport 2020 Federal Environmental Assessment 1. Introduction 1.1 This document sets out the procedures to be followed by participants in the public sessions scheduled for February 1st and 2nd, 2017 between 6:15 p.m. and 10:00 p.m. on the review of the Environmental Impact Statement for the Port of Quebec Deep-Water Multipurpose Wharf project. The Agency is responsible for conducting the environmental assessment of this project ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: