Kitchenuhmaykoosib Inninuwug Wastewater System Upgrades & Expansion Project - Public Comments Invited

July 12, 2024 – Indigenous Services Canada must determine whether the proposed Kitchenuhmaykoosib Inninuwug Wastewater System Upgrades & Expansion Project, located in the community of the Kitchenuhmaykoosib Inninuwug First Nation is likely to cause significant adverse environmental effects.

To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by August 12, 2024 to:

Robyn Bolton
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
(807) 358-1698
robyn.bolton@sac-isc.gc.ca

 

The Proposed Project

Kitchenuhmaykoosib Inninuwug First Nation proposes to construct and operate a new sewage lagoon on the mainland; expand and upgrade the existing lagoon on Post Island; upgrade the existing lift stations on Post Island; and, construct a wastewater collection system for the mainland, including new lift stations, forcemain, gravity sewer, outflow pipe, sanitary manholes and service connections to the existing housing.

Document reference number: 1

Date modified: