Public Comment Period on Intent to Make a Determination
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw.

May 3, 2024 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by May 12, 2024 to:
Cheryl-Ann Beckles, Environment Officer, 17 Wing Detachment Dundurn
Mailing Address: GD STN MAIN
Dundurn, SK, Canada, S0K 1K0
E-mail:  cheryl-ann.beckles@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project. The project objective is to replace the sanitary and storm sewer lines that have exceeded 50% or more of their serviceable life and replace the potable water distribution network across 15 Wing Moose Jaw in a series of six (6) phases.

The scope of work includes:

  • Pipe excavation,
  • Pipe replacement,
  • Pipe repair,
  • Pipe lining,
  • Manhole and catch basin replacement (complete or partial),
  • Manhole and catch basin repair,
  • General maintenance, and
  • Reclamation of excavations

Document reference number: 1

Date modified: