Public Notice

Mission Institution - Hydro Service Connection  – Public Comments Invited

June 27 2023  The Correctional Service Canada and City of Mission must determine whether the proposed project Mission Institution hydro service connection, located in Mission, Brithish Columbia is likely to cause significant adverse environmental effects.

To help inform this determination, the Correctional Service Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by July 27 2023 to:

IAALEI.GEN-NHQ@CSC-SCC.GC.CA

 

The Proposed Project

Hydro switch needs immediate replacement and to access equipment, a culvert and fill is required to bridge the drainage ditch to allow access.

Document reference number: 1