June 6, 2023 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by June 25, 2023 to:

Shannon Roy, Environment Officer
Mailing Address:  22 Wing North Bay, General Delivery Station Main, Hornell Heights
Ontario, Canada, P0H 1P0
E-mail:  Shannon.Roy@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project. The bridge on Mooz Miikan roadway requires upgrades to meet Canadian Highway Bridge Design Code. Eleven culverts along Mooz Miikan roadway are being replaced. The road crown in select locations is being re-established and select ditches will be excavated including limited rock removal where required.