Public Comment Period on Intent to Make a Determination
Concrete structures installation for CFB Shearwater Building SH5

April 6, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by April 15, 2021 to:

WO Mark Ridgeley, Operations Warrant Officer
36 Combat Engineer Regiment, Post Office Box 99000 Station Forces Halifax NS B3K 5X5
E-mail Address:mark.ridgeley@forces.gc.ca

The Proposed Project

The project is to consist of constructing concrete walkways leading into the proposed main entrances of building SH5 within CFB Shearwater and a monument adjacent to one of the walkways. The project consists of two (2) walkways on the northeast facing side of SH5 leading into the main door and office doors of the building. The monument will consist of placing two (2) sono tubes adjacent to the main entrance walkway. The walkways will require excavation of soil to allow gravel substrate to be placed under the proposed concrete, where the sono tubes will require digging of boreholes for their placement. When excavation and placement of gravel substrate is complete, the concrete walkways will be poured and sono tubes placed.

Document reference number: 1