Notice of Determination

Surrey, BC – March 11, 2020 -  The Vancouver Fraser Port Authority has determined that the proposed Georgia Pacific Gypsum Plant demolition is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

  • impacts on rights of Indigenous peoples
  • Indigenous knowledge
  • community knowledge
  • comments received from the public
  • technically and economically feasible mitigation measures

Mitigation measures taken into account for this determination are:

  • All works will be carried out in accordance with the construction environmental management plan.
  • No in-water works or activities below the top of bank will be conducted.

The Vancouver Fraser Port Authority [add additional authorities if applicable] is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, the Vancouver Fraser Port Authority [add additional authorities if applicable] may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Document reference number: 2