Attachment TC Energy Ontario Pumped Storage Project

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Administrateur de la part de Township of Tiny
  • Numéro de référence : 313
  • Présenté : 2026-04-07 14 h 38
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • See the attached submission / Veuillez consulter la pièce jointe
  • Inclus pièce jointe
  • 130 Balm Beach Road West Tiny, Ontario L0L 2J0 (705) 526-4204 | 1-866-939-8469 www.tiny.ca April 2, 2026 Terence Hubbard, President, Impact Assessment Agency IAAC (Impact Assessment Agency of Canada) 55 York Street, Suite 600 Toronto, ON M5J 1R7 ontarioregion-regiondontario@iaac-aeic.gc.ca Re: TC Energy Ontario Pumped Storage Project At its April 1, 2026 Council Meeting, the Township of Tiny Council ratified the following resolution regarding TC Energy Ontario Pumped Storage Project: Moved by Councillor Sean Mskimins Seconded by Councillor Dave Brunelle WHEREAS the Township of Tiny recognizes the importance of developing reliable and sustainable energy infrastructure for the Province of Ontario and acknowledges that energy projects of this scale may have significant environmental, economic, and social implications for our region, particularly for Georgian Bay and surrounding ecosystems; AND WHEREAS the proposed TC Energy Ontario Pumped Storage ...
  • Inclus pièce jointe
  • Severn Sound Environmental Association 489 Finlayson St, PO Box 460, Port McNicoll ON L0K 1R0 Phone (705) 534-7283 | Website: www.severnsound.ca September 9, 2025 Township of Tiny 130 Balm Beach Road W Tiny, Ontario L0L 2J0 Dear Mayor and Council, RE: SSEA Comment – Requested by Township of Tiny Council RE: The TC Energy Pumped Storage Proposal The SSEA has conducted an initial assessment of the TC Energy pumped storage proposal. The proposed project falls outside of the Severn Sound watershed and the jurisdiction of the SSEA. The local watershed planning authority and organization with local expertise on this site and this project would be the Grey Sauble Conservation Authority. While SSEA staff can’t provide specific comment on localized effects of the pumped storage facility near Meaford, we offer some thoughts on potential widespread effects on Georgian Bay, specifically considering the western coast of Tiny Township, which of all the shorelines ...

Attachment ORA Comments on the Ontario Pumped Storage Hydroelectric Project. Reference No. 89803

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Ontario Rivers Alliance
  • Numéro de référence : 305
  • Présenté : 2026-04-06 22 h 29
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • The Ontario Rivers Alliance (ORA) is a not-for-profit grassroots organization with a mission to protect, conserve, and restore Ontario rivers. ORA advocates for effective policy and legislation to ensure that development affecting Ontario rivers is environmentally and socially sustainable.  See full submission in PDF below.
  • Inclus pièce jointe
  • 379 Ronka Road Worthington, ON P0M3H0 LindaH@OntarioRiversAlliance.ca OntarioRiversAlliance.ca “A World of Healthy River Ecosystems” 6 April 2026 Impact Assessment Agency of Canada 600-55 York Street Toronto, Ontario M5J 1R7 Email: Nottawasaga@iaac-aeic.gc.ca Re: Ontario Pumped Storage Hydropower Project – Project Reference: 89803 Dear Sirs: The Ontario Rivers Alliance (ORA) is a not-for-profit grassroots organization with a mission to protect, conserve, and restore Ontario rivers. ORA advocates for effective policy and legislation to ensure that development affecting Ontario rivers is environmentally and socially sustainable. 1. Introduction and ORA Position ORA respectfully submits the following critique of the Initial Project Description – Plain Language Summary (IPD Summary) for the Ontario Pumped Storage Project (the Project), proposed by TransCanada Energy Ltd. (TC Energy) near Meaford, Ontario. ORA notes that the IPD Summary was prepared by a ...

Signaler

Attachment Objections to the Ontario Pumped Storage Hydropower Project #89803

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : June Porter
  • Numéro de référence : 304
  • Présenté : 2026-04-06 22 h 21
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • Resubmitting as attached document didn't upload. Impact Assessment Agency of Canada 55 York Street – Suite 600 Toronto, ON M5J 1R7 April 6, 2026 RE: Objections to the Ontario Pumped Storage Hydropower Project #89803 Dear Assessment Project Leader, As a Councillor and resident of The Town of The Blue Mountains, Ontario, an adjacent community which relies on water from  Georgian Bay. As a Town Councillor, I am legally bound to protect the drinking water of the residents I serve. I cannot accept the risk this project poses to our drinking water supply. Water sustains human life and is vital for human health (https://www.un.org/en/global-issues/water ). Water travels to this muncipality from Meaford quickly as within a day of the Johnny O fire dated May  25, 2023 where there was a significant volume of vehicle tires destroyed. The importance of this statement is that within one day rubber tire pieces appeared ...
  • Inclus pièce jointe
  • Impact Assessment Agency of Canada 55 York Street – Suite 600 Toronto, ON M5J 1R7 April 6, 2026 RE: Objections to the Ontario Pumped Storage Hydropower Project #89803 Dear Assessment Project Leader, As a Councillor and resident of The Town of The Blue Mountains, Ontario, an adjacent community which relies on water from Georgian Bay. As a Town Councillor, I am legally bound to protect the drinking water of the residents I serve. I cannot accept the risk this project poses to our drinking water supply. Water sustains human life and is vital for human health (https://www.un.org/en/global-issues/water ). I have experienced that water travels to this area from Meaford quickly as within a day of the Johnny O fire dated May 25, 2023 where there was a significant volume of vehicle tires destroyed. The importance of this statement is that within one day rubber tire pieces appeared along the shoreline of town owned water access at the north end of Lansdowne Street ...

Signaler

Attachment The solution to pollution is not dilution

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Andy Metelka
  • Numéro de référence : 294
  • Présenté : 2026-04-06 21 h 14
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  •  After a limited time to review the proponent's proposal (30 days), we provide our submission for your review. Given more time, we would certainly provide further information and a more detailed review if necessary. We are disappointed that a longer review period has not been granted, since the proponent has had years to prepare for this project. From the information provided by the proponent, we have determined that this project is a financial incentive for the proponent and a significant risk and setback for the taxpayers of Ontario, who are funding it.  It has become difficult to overturn despite extreme opposition over the last few years, but it now raises serious questions for all Georgian Bay residents and wildlife.  The threat to health and safety for financial gains or losses is an extreme risk. If any of the following situations occur during the project or at its completion, they can be difficult to reverse, both environmentally and ...
  • Inclus pièce jointe
  • Mr. Stefan Skocylas, Regulatory Lead Ontario Pumped Storage Project Impact Assessment Agency of Canada 600-55 York Street Toronto, Ontario M5J 1R7 April 5, 2026 Review of: Project No. 89803, TC Energy Ontario Pumped Storage Hydropower Project After a limited time to review the proponent's proposal (30 days), we provide our submission for your review. Given more time, we would certainly provide further information and a more detailed review if necessary. We are disappointed that a longer review period has not been granted, since the proponent has had years to prepare for this project. From the information provided by the proponent, we have determined that this project is a financial incentive for the proponent and a significant risk and setback for the taxpayers of Ontario, who are funding it. It has become difficult to overturn despite extreme opposition over the last few ...

Signaler

Attachment Comments to the IAAC regarding TC Energy's pumped storage proposal --IAAC registry number 89803

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Administrateur de la part de Clair Balfour
  • Numéro de référence : 324
  • Présenté : 2026-04-06 20 h 17
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • Dear Ms. McLeod Norberg:   In accordance with a March 6 email from you, I am sending my comments plus three supporting documents regarding TC Energy's proposed pumped storage (hydropower) project in Meaford, Ont.   The first document is a copy of an email received Feb. 2 from HUB International insurance which is simply copied on this email. It concerns the non-availability of flood insurance coverage.   The second is an attachment to this email from Hunter and Associates and is being included for images H.3.1 and H.3.2, which outline the Torrential Flood Zone below TC Energy's proposed reservoir and the properties and homes that would be at risk.   The third is a single image which highlights many of the residential properties below the proposed reservoir and can be read with the larger Hunter and Associates document.   These ...
  • Inclus pièce jointe
  • Veuillez consulter la pièce jointe pour afficher le contenu.
  • Inclus pièce jointe
  • COMMENTS TO THE IMPACT ASSESSMENT AGENCY OF CANADA From: Clair Balfour, a Meaford property owner whose land borders TC Energy’s proposed pumped storage project site Re IAAC Registry Number 89803 April 6, 2026 I am writing as a homeowner on the 7th Line in Meaford, Ontario, one of approximately 300 property owners—an estimated 800 to 1,000 residents—living directly below the planned 135-hectare reservoir that is central to TC Energy’s proposed Pumped Storage Project on the 4th Canadian Division Training Centre (Project No 89803 for which the Initial Project Description was registered with the Impact Assessment Agency of Canada on February 24, 2026). The IPD and its executive summary total 289 pages. Despite that length, the documents are noteworthy for one thing: their lack of concrete factual information. There are frequent references to studies initiated or undertaken by TC Energy, many as far back as 2020, but almost no actual data or findings ...
  • Inclus pièce jointe
  • Ms. Eve McLeod Norberg E-MAIL A/Project Manager, Ontario Region Eve.McleodNorberg@iaac-aeic.gc.ca Impact Assessment Agency of Canada ottawasaga@iaac-aeic.gc.ca VISUALS Under the Reservoir Impact Group Georgian Bay Pumped Storage IAAC Ref No. 69-803 Comments on the Initial Project Description Released on March 6, 2026 by the IACC TC Energy Proposed Ontario Pumped Storage Hydropower Project Near Meaford, Ontario, on Nottawasaga Bay (Georgian Bay) Prepared by: Garry T. Hunter, M.A.Sc., P.Eng. Environmental Systems Planner, Hydrogeologist and Civil Engineer Hunter and Associates April 6, 2026 Our File No.: 22-402 mailto:Eve.McleodNorberg@iaac-aeic.gc.ca Ms. Eve McLeod Norberg A/Project Manager, Ontario Region Impact Assessment Agency of Canada April 6, 2026 FIGURE INDEX 1.0 Proponent's Conceptual Key Project Components Fig H.1.1 Preliminary Project ...

Signaler

Attachment Serious concerns and suggestions

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : SVS Canada Inc.
  • Numéro de référence : 287
  • Présenté : 2026-04-06 19 h 40
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • After a limited time to review the proponent's proposal (30 days), we provide our submission for your review. Given more time, we would certainly provide further information and a more detailed review if necessary. We are disappointed that a longer review period has not been granted, since the proponent has had years to prepare for this project. From the information provided by the proponent, we have determined that this project is a financial incentive for the proponent and a significant risk and setback for the taxpayers of Ontario, who are funding it.  It has become difficult to overturn despite extreme opposition over the last few years, but it now raises serious questions for all Georgian Bay residents and wildlife.  The threat to health and safety for financial gains or losses is an extreme risk. If any of the following situations occur during the project or at its completion, they can be difficult to reverse, both environmentally and ...
  • Inclus pièce jointe
  • Mr. Stefan Skocylas, Regulatory Lead Ontario Pumped Storage Project Impact Assessment Agency of Canada 600-55 York Street Toronto, Ontario M5J 1R7 April 5, 2026 Review of: Project No. 89803, TC Energy Ontario Pumped Storage Hydropower Project After a limited time to review the proponent's proposal (30 days), we provide our submission for your review. Given more time, we would certainly provide further information and a more detailed review if necessary. We are disappointed that a longer review period has not been granted, since the proponent has had years to prepare for this project. From the information provided by the proponent, we have determined that this project is a financial incentive for the proponent and a significant risk and setback for the taxpayers of Ontario, who are funding it. It has become difficult to overturn despite extreme opposition over the last few ...

Signaler

Attachment Comments for the Initial Project Description — Ontario Pumped Storage Project 89803

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Save Georgian Bay Association
  • Numéro de référence : 282
  • Présenté : 2026-04-06 17 h 56
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • Save Georgian Bay Association (SGB) submits that TC Energy’s Initial Project Description (IPD) for the proposed 1,000-MW open-loop pumped storage project at 4 CDTC Meaford is materially incomplete and does not provide sufficient information for IAAC or the public to assess potential adverse effects under section 22 of the Impact Assessment Act. Key project components, baseline environmental and geotechnical conditions, associated infrastructure, and cumulative effects are inadequately defined or deferred. The submission identifies threshold failures related to site suitability on karst escarpment terrain, legacy contamination risks on an active military base, impacts on fish and species at risk, groundwater and dam safety concerns, and exclusion of transmission and ancillary works from scope. Procedural concerns include constrained ...
  • Inclus pièce jointe
  • 4/ 4/ 20 26 1 Appendix A – Municipal and Council Resolutions Opposing the TC Energy Pumped Storage Project (Submitted as contextual information only; not relied upon as technical evidence) Purpose of this Appendix This appendix provides supporting contextual information regarding municipal and stakeholder concerns related to the proposed Ontario Pumped Storage Project. The materials included here demonstrate the geographic breadth and consistency of concerns expressed across the Georgian Bay region, particularly with respect to environmental risk, water quality, Species at Risk, and information sufficiency. Save Georgian Bay submits these materials as context only. The primary basis of this submission remains the deficiencies identified in the Initial Project Description (IPD) and the absence of information required for assessment under the Impact Assessment Act. Appendix A-1: Township of The Archipelago – Resolution No. 23-189 (November 17, 2023) ...
  • Inclus pièce jointe
  • 4/ 4/ 20 26 1 The Save Georgian Bay Association 102 Ross Street Meaford, Ontario N4L 1W7 March 19, 2026 By email to: Nottawasaga@iaac-aeic.gc.ca CC: MinisterEnergy@ontario.ca mikeschreiner@gpo.ca alex.ruff@parl.gc.ca Terence Hubbard, President Impact Assessment Agency of Canada Place Bell Canada 160 Elgin Street, 22nd Floor Ottawa, Ontario K1A 0H3 Re: Public Comments on the Initial Project Description — Ontario Pumped Storage Project Canadian Impact Assessment Registry No. 89803 Proponent: TransCanada Energy Ltd. (TC Energy or TCE) IPD Prepared by: Stantec Consulting Ltd., Project No. 123515349 IPD Date: February 24, 2026 Comment Period Deadline: April 6, 2026 Dear President Hubbard, The Save Georgian Bay Association (SGB) submits these comments on TC Energy’s (TCE) Initial Project Description (IPD) 89803, for the proposed 1,000 MW open-loop pumped storage hydropower project on the shore of Georgian Bay at the Department of ...
  • Inclus pièce jointe
  • 4/ 4/ 20 26 5 Appendix B – Select Contextual Correspondence and Reference Material (Included selectively; not relied upon as technical evidence) Appendix B-1: Technical Correspondence on Subsurface Conditions and Contaminant Pathways Document Included • Correspondence from Andy Metelka, Sound and Vibration Solutions Canada Inc. Contextual Summary This correspondence discusses geophysical methods relevant to characterizing complex subsurface conditions at the Meaford site, including the identification of clay layers, shale, bedrock, and potential contaminant pathways using techniques such as ground-penetrating radar (GPR), electrical resistivity tomography (ERT), seismic methods, and targeted borehole sampling. The correspondence is provided for context regarding possible approaches to site characterization in complex geology and does not constitute a formal study or analysis. Figure 5.2 - Conditionality Table (60 Examples) 1–20 21–40 ...
  • Inclus pièce jointe
  • 4/ 4/ 20 26 1 Appendix D – Environmental Reference Materials Appendix D-1: Acoustic Survey for Endangered Bats – Meaford, Ontario (2023) Document included: Survey for Endangered Bats: Meaford, Ontario – An acoustic survey of the local bat community, prepared by Susan L. Holroyd, M.Sc., for Save Georgian Bay Association, October 2023. Contextual summary: This acoustic bat survey was conducted in August 2023 in the Niagara Escarpment and Georgian Bay shoreline area northwest of Meaford, within a few kilometres of the proposed Ontario Pumped Storage Project site. Using stationary acoustic monitoring and a driving transect in accordance with North American Bat Monitoring Program (NABat) protocols, the study documented relatively high bat diversity and activity levels across the survey area. Endangered bat species detected include Little Brown Myotis (Myotis lucifugus) and Tricolored Bat (Perimyotis subflavus), both listed as Endangered under provincial and ...
  • Inclus pièce jointe
  • Veuillez consulter la pièce jointe pour afficher le contenu.

Signaler

Attachment IAAC submission TC energy

  • Projet de centrale hydroélectrique à réserve pompée de l'Ontario
  • Auteur : Robyn Wheeldon
  • Numéro de référence : 279
  • Présenté : 2026-04-06 17 h 39
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
  • I am concerned that the Dam built by TC energy on the 4CDTC in Meaford will affect the tributaries that flow from the top of the escarpment creating streams that flow into wet lands and Georgian bay. The size of the proposed dam will cut off water flow to these vital streams and wetland areas. The streams are vital for sustaining life of the many Frog species ( including endangered and at risk frogs and salamanders) in the area. There will also be a large impact to Rodents, Birds, Buttery flies and the Deer population (some at risk) that rely on these streams for water and vegetation. Georgian Bay and the escarpment is on a migratory bird pathway and the water and wetlands are vital to these birds. I am worried about the effect of the dam, not only on wildlife at the Military Base but also on all the areas downstream, which will be impacted by changes in water flow from the top of the escarpment. The banks of these streams that flow down from the top of the ...
  • Inclus pièce jointe
  • I am concerned that the Dam built by TC energy on the 4CDTC in Meaford will affect the tributaries that flow from the top of the escarpment creating streams that flow into wet lands and Georgian bay. The size of the proposed dam will cut off water flow to these vital streams and wetland areas. The streams are vital for sustaining life of the many Frog species ( including endangered and at risk frogs and salamanders) in the area. There will also be a large impact to Rodents, Birds, Buttery flies and the Deer population (some at risk) that rely on these streams for water and vegetation. Georgian Bay and the escarpment is on a migratory bird pathway and the water and wetlands are vital to these birds. I am worried about the effect of the dam, not only on wildlife at the Military Base but also on all the areas downstream, which will be impacted by changes in water flow from the top of the escarpment. The banks of these streams that flow down from the top of the ...

Signaler

Date de soumission Afficher les filtres

Filters

Types de consultationAfficher les filtres

Phase du projetAfficher les filtres

Avis de participationAfficher les filtres

Date de modification :