Attachment Hydrogen ready power plant will likely increase emissions

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Seniors for Climate Action Now!
  • Numéro de référence : 46
  • Présenté : 2022-08-21 10 h 37
  • Phase du projet : Planification
  • Avis de participation : S.O.
  • The St Clair power plant will burn hydrogen made by Steam Methane Reforming using natural gas. This produces so-called 'blue hydrogen' and the process to make the hydrogen always produces greenhouse gases. Always. The carbon capture and storage process being developed has never fully eliminated these emissions and is not expected to do so despite the industry's fervent claims of success.  Please contact me for the links to the peer reviewed papers on this subject. So, the hydrogen substituting for natural gas at this power plant will NOT reduce emissions. Moreover, combusting hydrogen can produce emissions of N2O which is also a greenhouse gas even though it does not contain carbon. Only green electrolytic hydrogen will reduce emissions from a natural gas power plant and this is not the hydrogen being produced for this plant. Furthermore, there is no  justification for a new fossil fuel power plant in Ontario. The IESO should consider transmission links with ...
  • Inclus pièce jointe
  • Blue hydrogen is far from clean 02/03/2022 Martin Bush 1 Comment Canada, Energy policy, hydrogenEdit Canada doesn’t need a hydrogen policy crafted by the oil and gas industry in Alberta. Eastern Canada has the potential to be a global player in the production of green hydrogen. In many respects, hydrogen is the perfect fuel: it burns with absolutely no emissions of carbon—producing only water. The gas has been used as a feedstock in the petrochemical industries for decades, but as energy-intensive industries move towards decarbonization, it is now being touted as the fuel of the future: an essential element of the roadmap that brings the world to net zero emissions by 2050. The International Energy Agency foresees the demand for hydrogen growing sixfold from today’s level of about 90 million tonnes (Mt) a year, rising to 10% of total final energy consumption by 2050. Bloomberg is even more enthusiastic: estimating that hydrogen could provide almost a ...

Signaler

Attachment Various Individuals to IAAC - Hydrogen Ready Power Plant Project - New polluting gas plant requires a FULL assessment - Compilation

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Administrateur de la part de Various Individuals
  • Numéro de référence : 43
  • Présenté : 2022-07-27 10 h 04
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Please see the attached submission.
  • Inclus pièce jointe
  • [Note: The following text was submitted by 2,611 individuals (identified in the tables on pages 2 and 18) to the Impact Assessment Agency of Canada] Subject: New polluting gas plant requires a FULL assessment Dear Impact Assessment Agency, I’m writing to communicate my concerns regarding the proposed new gas plant in Ontario, the so-called “Hydrogen Ready Power Plant” south of Sarnia, and ask you to conduct a full assessment (with a Review Panel) on the project. This is necessary because: 1. Ontario is not on track to meet its own weak greenhouse gas emissions targets. Adding gas plants to the electricity grid will make it even more difficult for Ontario to do its fair share to bring down Canada’s emissions in line with the Paris Agreement. 2. Burning fossil gas accounts for one-third of all carbon emissions in Ontario and gas plant pollution is rapidly increasing. With Ontario’s plan to continue to increase the use of gas-powered electricity, greenhouse gas ...

Signaler

Attachment MECP re HRPP - Enclosure 1 - Provincial Advice Record - Summary of Issues and Potential Cooperation Plan

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Ontario Ministry of the Environment, Conservation and Parks présenté par Mark Badali
  • Numéro de référence : 32
  • Présenté : 2022-07-18 15 h 02
  • Phase du projet : Planification
  • Avis de participation : S.O.
  • Please find the attached comments provided on the "Enclosure: Provincial Advice Record: Summary of Issues and Potential Cooperation Plan" template. Thank you for the opportunity to participate in this stage of the federal impact assessment process.
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 8 CIAR reference number: 83696 Enclosure: Provincial Advice Record: Summary of Issues and Potential Cooperation Plan Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 Response invited by: July 18, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (reference 83696)1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Hydrogen-Hydrogene@iaac-aeic.gc.ca. 1. Confirm whether your ministry would participate in the federal impact assessment process for this Project. Yes No If yes, please provide contact details for the person(s) who will be working with the Agency. Department/Agency: Ontario Ministry of the Environment, Conservation and Parks Date of Advice: July 18, 2022 Primary Contact Name, Title, ...

Signaler

Attachment Chippewas of Kettle and Stony Point First Nation - Comment of the IPD for the Hydrogen Ready Power Plant Project

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Administrateur de la part de Chippewas of Kettle and Stony Point First Nation
  • Numéro de référence : 38
  • Présenté : 2022-07-13 22 h 41
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Please see the attached submission. 
  • Inclus pièce jointe
  • Enclosure 1 Hydrogen Ready Power Plant Project Page 1 of 7 CIAR reference number: 83696 Comment Form – Information to Inform the Summary of Issues Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 End of comment period: July 13, 2022 Indigenous Group Name: Chippewas of Kettle and Stony Point First Nation Contact Name: Consultation Department Telephone: 519-786-6753 Address: 9119 W Ipperwash Rd, Lambton Shores, ON N0N 1J2 Fax: Email: consultation@kettlepoint.org The Impact Assessment Agency of Canada invites your community to provide information it has available at this time on the Project and its potential effects or impacts (both positive and negative) to the environment and to your community and your Aboriginal and/or Treaty Rights. We also welcome your input on how you would like to be engaged throughout the potential assessment process. Your comments will inform the Summary of Issues1 with respect to the Project ...

Signaler

Attachment Federal Authority Advice Record - Employment And Social Development Canada

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Administrateur de la part de Employment And Social Development Canada
  • Numéro de référence : 40
  • Présenté : 2022-07-13 17 h 55
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Please see the attached submission. 
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 4 CIAR reference number: 83696 Table 1: Key Issues and Solutions that are Material and Relevant to Decision-making Comment ID Document Reference Valued Component Description of Key Issue (Context and Rationale) Solutions for the Proponent Summary of Issues Please identify comments by organization and comment number. e.g.: IAAC-01 If the comment is related to a specific section of the Initial Project Description, please provide a reference. You may also choose to copy the relevant text here. Identify the valued component(s)—within the mandate of your department or agency— to which the effect or issue applies. This may include components of the environment, health, social or economic conditions. Provide context for the effect or issue. Describe, to the extent possible:  The positive or negative pathway of effect or nature of the issue  Any powers, duties or functions that ...
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 6 CIAR reference number: 83696 UNCLASSIFIED - NON CLASSIFIÉ Enclosure 2: Federal Authority Advice Record: Summary of Issues, and Potential Tailored Impact Statement Guidelines and Plans Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 Response due by: July 6, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83696)1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Hydrogen-Hydrogene@iaac-aeic.gc.ca for assistance. Department/Agency: Employment And Social Development Canada Date of Advice: July 8th, 2022 Primary Contact Name, Title, Work Unit: Cathy Grimes; a/Dir– Skills and Employment Branch, PISP Email: Cathy.Grimes@servicecanada.gc.ca Phone: Alternate Contact Name, Title, Work ...

Signaler

Attachment MNRF Comments on Initial Project Description

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Ministry of Natural Resources and Forestry présenté par Jeffrey Dennis
  • Numéro de référence : 29
  • Présenté : 2022-07-13 17 h 39
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Please find attached the Provincial Advice Record comments provided by the Ministry of Natural Resources and Forestry for the Hydrogen Ready Power Plant project.
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 5 CIAR reference number: 83696 The Duty to Enclosure: Provincial Advice Record: Summary of Issues and Potential Cooperation Plan Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 Response invited by: July 13, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (reference 83696)1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Hydrogen-Hydrogene@iaac-aeic.gc.ca. 1. Confirm whether your ministry would participate in the federal impact assessment process for this Project. Yes No If yes, please provide contact details for the person(s) who will be working with the Agency. Department/Agency: Ministry of Natural Resources and Forestry (MNRF) Date of Advice: July 13, 2022 Primary Contact Name, ...

Signaler

Attachment MNRF Comments on Initial Project Description

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Ministry of Natural Resources and Forestry présenté par Jeffrey Dennis
  • Numéro de référence : 28
  • Présenté : 2022-07-13 17 h 37
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Please find attached the Ministry of Natural Resources and Forestry's comments on the Hydrogen Ready Power Plant Project.
  • Inclus pièce jointe
  • Petroleum Resources in Ontario 1 Municipal Planning: Petroleum and Salt Resources Operations   Introduction    Since 1858, when the first commercial oil well began operating in Southwestern Ontario, tens of  thousands of wells have been drilled in this region. Numerous wells were drilled without record or  regulation. Many may pose a hazard to people or the environment if undetected or disturbed by  development.    Today, these operations are governed by the Oil, Gas and Salt Resources Act (OGSRA) framework,  which provides oversight for the exploration, development and decommissioning of oil, gas and  solution‐mined salt resource‐related activities.      This document provides guidance to Southwestern Ontario municipalities on legacy and currently  active petroleum operations to support municipal planning decisions and development of official  plans.     The information provided supports the Provincial Policy Statement (PPS), which requires that:   ...

Signaler

Attachment St. Clair Region Conservation Authority

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : St. Clair Region Conservation Authority présenté par Sarah Hodgkiss
  • Numéro de référence : 27
  • Présenté : 2022-07-13 17 h 27
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Describe the mandate of the St. Clair Region Conservation Authority? The core mandate of Conservation Authorities is to undertake watershed-based programs to protect people and property from flooding and other natural hazards, and to conserve natural resources for economic, social and environmental benefits. St. Clair Region Conservation Authority has reviewed the project information under the context of Ontario Regulation 171/06, "Development, Interference with Wetlands and Alterations to Shorelines and Watercourses”, as it pertains to flooding and erosion hazards, and impacts to wetlands. Has the Proponent adequately articulated potential effects (both positive and negative) of the Project?  If not, itemize, with appropriate rationale, specific potential effects that require attention by the Proponent? The Proponent has recognized that the project is proposed ...
  • Inclus pièce jointe
  • GOVERNMENT DRAIN NO 10 SECOND LINE DRAIN GOVERNMENT DRAIN NO 10 WH EL LE R DR AIN MILLIKEN DRAIN GOVERNMENT DRAIN NO 10 MUNDY DRAIN NO 2 LUMLEY DRAIN Hig hw ay 40 Oil Springs Line Proposed Hydrogen Ready Power Plant Lot 26, Con 2 Moore Produced by the SCRCA under license with the Ontario Ministry of Natural Resources. Copyright Queen's Printer Friday, March 11, 2022. May not be reproduced without permission. THIS IS NOT A PLAN OF SURVEY | Aerial Photography Date: Spring 2020 K:\Maps\Screening Maps\Planning Screening Map 2021.mxd Ü0 210 420105 Meters Legend Areas Affected by Regulations SCRCA Estimated Floodplain Wetlands (MNRF, March, 2021) Wetland Adjacent Lands (30 m) Wetland Adjacent Lands (120 m) Watercourses Subject Property (approx.) Map EA#2022-0003

Signaler

Attachment Comment Form - Information to Inform the Summary of Issues Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc.

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Caldwell First Nation présenté par Zack Hamm
  • Numéro de référence : 25
  • Présenté : 2022-07-13 15 h 59
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Enclosure 1   Comment Form – Information to Inform the Summary of Issues Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 End of comment period: July 13, 2022 Indigenous Group Name: Caldwell First Nation (CFN) Contact Name: Michelle McCormack and Zack Hamm Telephone: 519 322 1766 Address: 14 Orange St. Leamington, ON Fax: 519 322-1533 Email: ecc@caldwellfirstnation.ca (mailto:ecc@caldwellfirstnation.ca) and ecc2@caldwellfirstnation.ca (mailto:ecc2@caldwellfirstnation.ca) The Impact Assessment Agency of ...
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 6 CIAR reference number: 83696 Enclosure 1 Comment Form – Information to Inform the Summary of Issues Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 End of comment period: July 13, 2022 Indigenous Group Name: Caldwell First Nation (CFN) Contact Name: Michelle McCormack and Zack Hamm Telephone: 519 322 1766 Address: 14 Orange St. Leamington, ON Fax: 519 322-1533 Email: ecc@caldwellfirstnation.ca and ecc2@caldwellfirstnation.ca The Impact Assessment Agency of Canada invites your community to provide information it has available at this time on the Project and its potential effects or impacts (both positive and negative) to the environment and to your community and your Aboriginal Rights. We also welcome your input on how you would like to be engaged throughout the potential assessment process. Your comments will inform the Summary of Issues1 with respect to the ...

Signaler

Attachment BCSE comments on Hydrogen Ready Power Plant Project

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Bowman Centre for Sustainable Energy présenté par Marshall Kern
  • Numéro de référence : 24
  • Présenté : 2022-07-13 15 h 31
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • The proponent offers the use of hydrogen as a fuel as an expectation for the future.  If the project is moved ahead for further review, a schedule for the use of hydrogen should become a commitment and requirement for approval. If the project is moved froward for further review there must be consideration and analysis of the carbon intensity of the use of hydrogen as a fuel in a blend with natural gas.  This will determine the extent to which the project will impair the carbon-intensity of the Ontario electricity grid.  We recommend that the carbon intensity of the Ontario electricity grid not be impaired. If the project is moved forward, we recommend that further review must include an analysis of LCOE.  This will permit an objective comparison to other technologies for generating electricity.  It will also allow the final review to assess the economic impact on user ...
  • Inclus pièce jointe
  • The Bowman Centre (www.bowmancentre.com) Western Research Park, Sarnia-Lambton 1086 Modeland Road Sarnia, ON, Canada N7S 6L2 Bowman Centre for Sustainable Energy Comments on Hydrogen Ready Power Plant July 13, 2022 REGARDING: Impact Assessment Agency of Canada – registry reference number 83696 (details below): • Location: Courtright (Ontario) • Nature of Activity: Other, not otherwise specified • Assessment Status: In progress • Start Date: 2022-06-13 • Proponent: Eastern Power Inc. • Authorities: Impact Assessment Agency of Canada • Assessment Type: Planning Phase for Impact Assessment • Reference Number: 83696 The Bowman Centre for Sustainable Energy offers these comments on the cited project. Commitment to use hydrogen: Eastern Power Inc. is proposing a natural-gas electricity generating facility that will also be able to use a combination of natural gas and hydrogen. The Initial Project Description provides no ...

Signaler

Attachment Hydrogen Ready Power Plant Project - Request to Review Initial Project Description by July 13, 2022 - MTCS Comments (Reference 83696)

  • Projet de centrale électrique prête pour l'hydrogène
  • Auteur : Ministry of Tourism, Culture and Sport (MTCS) présenté par Joseph Harvey
  • Numéro de référence : 16
  • Présenté : 2022-07-12 13 h 24
  • Phase du projet : Planification
  • Avis de participation : Avis public - Période de consultation publique sur le résumé de la description de projet
  • Jeff Balsdon,  Please find attached comments from the Ministry of Tourism, Culture and Sport on the Initial Project Description for the Hydrogen Ready Power Plant Project (Reference 83696). Please do not hesitate to contact us with any questions or concerns.  Regards,  Joseph Harvey, Heritage Planner, Ministry of Tourism, Culture and Sport
  • Inclus pièce jointe
  • Hydrogen Ready Power Plant Project Page 1 of 6 CIAR reference number: 83696 Enclosure: Provincial Advice Record: Summary of Issues and Potential Cooperation Plan Project: Hydrogen Ready Power Plant Project Proponent: Eastern Power Inc. CIAR No.: 83696 Response invited by: July 13, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (reference 83696)1. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Hydrogen-Hydrogene@iaac-aeic.gc.ca. 1. Confirm whether your ministry would participate in the federal impact assessment process for this Project. Yes No If yes, please provide contact details for the person(s) who will be working with the Agency. Department/Agency: Ministry of Tourism, Culture and Sport Date of Advice: July 6, 2022 Primary Contact Name, Title, Work Unit: Joseph ...

Signaler

Date de soumission Afficher les filtres

Filters

Types de consultationAfficher les filtres

Phase du projetAfficher les filtres

Avis de participationAfficher les filtres

Date de modification :