Document Notice of early decision with reasons

  • Project Riverside Generating Station Project
  • Document Category: Additional Information
  • Reference Number: 38
  • Document Date: 2025-11-17
  • Document: 163769E.html
  • Relevance: 383.57
  • Notice of early decision with reasons Ottawa — November 17, 2025 — The Impact Assessment Agency of Canada (IAAC) has conducted an assessment of the Riverside Generating Station Project (the project) and on November 13, 2025, decided at an early stage that no further assessment is required for the project proposed by Atura Power (the proponent), located in Ontario. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), IAAC considered each of the following factors: the ...
1 alternate format found
French HTML
  • Relevance: 332.57
  • Avis de décision avec motifs tôt dans le processus Ottawa — 17 novembre 2025 — L'Agence d'évaluation d'impact du Canada (AEIC) a réalisé une évaluation d'impact du projet de centrale Riverside (le projet) et le 13 novembre 2025 a décidé, tôt dans le processus, qu'aucune évaluation supplémentaire n'est requise pour le projet proposé par Atura Power (le promoteur) situé en Ontario. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'AEIC a pris en compte les éléments ...

Document Summary of Issues

  • Project Riverside Generating Station Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2025-10-15
  • Document: 163492E.pdf
  • Relevance: 380.13
  • PAGE 1 OF 1 Summary of Issues Riverside Generating Station Project The Summary of Issues outlines the key issues that the Impact Assessment Agency of Canada (IAAC) considers relevant for the federal impact assessment process for the Riverside Generating Station Project (the project). The proponent’s response to the Summary of Issues will support decision-making by IAAC on whether an impact assessment is required under section 16 of the Impact Assessment Act. If an impact ...
3 alternate formats found
English HTML
  • Relevance: 380.13
  • Summary of Issues Riverside Generating Station Project The Summary of Issues outlines the key issues that the Impact Assessment Agency of Canada (IAAC) considers relevant for the federal impact assessment process for the Riverside Generating Station Project (the project). The proponent's response to the Summary of Issues will support decision-making by IAAC on whether an impact assessment is required under section 16 of the Impact Assessment Act. If an impact assessment is required, the key ...
French PDF
  • Relevance: 329.13
  • PAGE 1 DE 1 Sommaire des questions Projet de centrale Riverside Le sommaire des questions décrit les enjeux clés que l’Agence d’évaluation d’impact du Canada (AEIC) considère comme pertinents pour le processus fédéral d’évaluation d’impact visant le projet de centrale Riverside (le projet). La réponse du promoteur au sommaire des questions soutiendra la prise de décision par l’AEIC quant à savoir si une évaluation d’impact est nécessaire en vertu de l’article 16 de la Loi sur ...
French HTML
  • Relevance: 329.13
  • Sommaire des questions Projet de centrale Riverside Le sommaire des questions décrit les enjeux clés que l'Agence d'évaluation d'impact du Canada (AEIC) considère comme pertinents pour le processus fédéral d'évaluation d'impact visant le projet de centrale Riverside (le projet). La réponse du promoteur au sommaire des questions soutiendra la prise de décision par l'AEIC quant à savoir si une évaluation d'impact est nécessaire en vertu de l'article 16 de la Loi sur l'évaluation d'impact. Si ...

Document Public Notice - Participant Funding Available

  • Project Riverside Generating Station Project
  • Document Category: For Public Participation
  • Reference Number: 5
  • Document Date: 2025-09-17
  • Document: 163219E.html
  • Relevance: 377.24
  • Public Notice Participant Funding Available   September 17, 2025 — Funding provided by the Impact Assessment Agency of Canada (IAAC) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Riverside Generating Station Project, a new power generating facility fueled by natural gas located about 16 kilometres south of Sarnia, Ontario. Funding is available for eligible individuals and groups to support their participation ...
1 alternate format found
French HTML
  • Relevance: 326.24
  • Avis public Disponibilité d'une aide financière aux participants   17 septembre 2025 — L'Agence d'évaluation d'impact du Canada (AEIC) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet de centrale Riverside, une nouvelle installation de production d'énergie alimentée au gaz naturel, située à environ 16 kilomètres au sud de Sarnia, en Ontario. Cette aide financière est mise à la ...

Document Summary of the Initial Project Description of a Designated Project

  • Project Riverside Generating Station Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2025-09-02
  • Document: 163194E.pdf
  • Relevance: 375.7
  • Plain Language Summary – Initial Project Description Riverside Generating Station Project SEPTEMBER 2025 Plain Language Summary – Initial Project Description Riverside Generating Station Project PREPARED FOR: Atura Power 1415 Joshuas Creek Drive, Unit 200 Oakville, Ontario L6H 7G4 PREPARED BY: SLR Consulting (Canada) Ltd. 100 Stone Road West, Suite 201 Guelph, ON N1G 5L3 Riverside Generating Station Project Atura Power. • ...
1 alternate format found
French PDF
  • Relevance: 324.7
  • Résumé en langage clair - Description initiale du projet Projet de centrale Riverside SEPTEMBRE 2025 Résumé en langage clair - Description initiale du projet Projet de centrale Riverside PRÉPARÉ POUR : Atura Power 1415, promenade Joshuas Creek, unité 200 Oakville (Ontario) L6H 7G4 PRÉPARÉ PAR : SLR Consulting (Canada) ltée 100, chemin Stone Ouest, bureau 201 Guelph (Ontario) N1G 5L3 Projet de centrale Riverside Atura ...

Document Supporting Geospatial Data - Initial Project Description

  • Project Riverside Generating Station Project
  • Document Category: Geospatial data files
  • Reference Number: 4
  • Document Date: 2025-09-02
  • Document: 163229E.html
  • Relevance: 375.7
  • Supporting Geospatial Data — Initial Project Description Atura Power has provided electronic geospatial data files on September 2, 2025, related to the Riverside Generating Station Project. The dataset contains the following seven layers for maps provided in the Initial Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer name Page number Site Boundary 2 Proposed Project Location 2 Hydro One Lambton Transmission ...
1 alternate format found
French HTML
  • Relevance: 324.7
  • Données géospatiales connexes – Description initiale du projet Atura Power a fourni des fichiers électroniques de données géospatiales le 2 septembre 2025 liées au Projet de centrale Riverside. L'ensemble de données contient sept couches pour les cartes fournies dans description détaillée du projet (anglais seulement). Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Nom de la couche (anglais seulement) Numéro de ...