YMX International Aerocity of Mirabel - Replacement of four petroleum product tanks at Pratt & Withney's Plant 15 site

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project YMX International Aerocity of Mirabel - Replacement of four petroleum product tanks at Pratt & Withney's Plant 15 site
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2024-09-20
  • Document: 159125E.html
  • Relevance: 342.15
  • Notice of Determination September 20, 2024 – ADM Aéroports de Montréal has determined that the proposed replacement of four petroleum product tanks at Pratt & Withney's Plant 15 site at YMX International Aerocity of Mirabel not likely to cause significant adverse environmental effects by applying the mitigation measures planned for the project. This decision is based on the following factors: Mitigation measures that are technically and environmentally feasible below; Community ...
1 alternate format found
French HTML
  • Relevance: 291.15
  • Avis de décision Le 20 septembre 2024 - Aéroports de Montréal a déterminé que le projet de remplacement de quatre réservoirs de produits pétroliers sur le site de l'usine 15 de Pratt & Whitney Canada (P&WC) à YMX Aérocité internationale de Mirabel n'est pas susceptible d'entraîner des effets négatifs importants sur l'environnement en appliquant les mesures d'atténuation prévues au projet. Cette détermination est fondée sur les facteurs suivants : Mesures d'atténuation réalisables sur les ...

Document Notice of Intent to Make a Determination - Start of Public Comment Period

  • Project YMX International Aerocity of Mirabel - Replacement of four petroleum product tanks at Pratt & Withney's Plant 15 site
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-08-20
  • Document: 158612E.html
  • Relevance: 339.31
  • Public Notice YMX International Aerocity of Mirabel – Replacement of four petroleum product tanks at Pratt & Withney's Plant 15 site – Public Comment Period August 20, 2024 - ADM Aéroports de Montréal must determine whether the proposed project is likely to cause significant adverse environmental effects. To help inform this determination, ADM Aéroports de Montréal is inviting comments from the public respecting that determination. All comments received will be considered public and may ...
1 alternate format found
French HTML
  • Relevance: 288.31
  • Avis public YMX Aérocité internationale de Mirabel - Remplacement de quatre réservoirs de produits pétroliers sur le site de l'usine 15 de Pratt & Withney – Période de consultation publique Le 20 août 2024 - ADM Aéroports de Montréal doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, ADM Aéroports de Montréal invite le public à formuler des commentaires sur cette ...