Document Notice of Impact Assessment Decision with Reasons

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Document Date: 2024-08-02
  • Document: 158337E.html
  • Relevance: 337.55
  • Notice of Impact Assessment Decision with Reasons August 2, 2024: The Impact Assessment Agency of Canada is posting this Notice of Decision in accordance with the Notice of Transition. Ottawa — August 2, 2024 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Cando Sturgeon Rail Terminal West Expansion Project (the project) located in Alberta, proposed by Cando Rail and Terminals Ltd. (the proponent). On June 14, 2024, during the ...
1 alternate format found
French HTML
  • Relevance: 286.55
  • Avis de décision relative à une évaluation d'impact avec motifs Le 2 août 2024 : L'Agence d'évaluation d'impact du Canada affiche cet avis de décision conformément à l'avis de transition. Ottawa — Le 2 août 2024 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas requise pour le projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon (le projet) situé en Alberta, proposé par Cando Rail and Terminals Ltd. (le promoteur). Le ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Additional Information
  • Reference Number: 27
  • Document Date: 2024-08-02
  • Document: 158338E.html
  • Relevance: 337.55
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — August 2, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a step ...
1 alternate format found
French HTML
  • Relevance: 286.55
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — Le 2 août 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou ...

Document Notice of Agency's Opinion on Whether an Impact Assessment is Required

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Additional Information
  • Reference Number: 22
  • Document Date: 2024-06-14
  • Document: 157658E.html
  • Relevance: 333.15
  • Notice of Agency's Opinion on Whether an Impact Assessment is Required June 14, 2024 — The Impact Assessment Agency of Canada (the Agency) is of the opinion that an impact assessment is not required for the Cando Sturgeon Rail Terminal West Expansion Project (the project) proposed by Cando Rail and Terminals Ltd. (the proponent), located in Alberta. In applying the measures outlined in the Statement on the Interim Administration of the Impact Assessment Act Pending Legislative Amendments, ...
1 alternate format found
French HTML
  • Relevance: 282.15
  • Avis d'opinion sur la nécessité d'une évaluation d'impact 14 juin 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) est d'avis qu'une évaluation d'impact n'est pas requise pour le projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon (le projet) proposé par Cando Rail and Terminals Ltd. (le promoteur), situé en Alberta. En application des mesures décrites dans la Déclaration sur les dispositions provisoires relatives à l'administration de la Loi sur l'évaluation ...

Document Supporting geospatial data - Detailed Project Description

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Geospatial data files
  • Reference Number: 25
  • Document Date: 2024-06-04
  • Document: 157678E.html
  • Relevance: 332.26
  • Supporting geospatial data - Detailed Project Description Cando Rail and Terminals has provided electronic geospatial data files on June 4, 2024, related to the Cando Sturgeon Rail Terminal West Expansion Project. The dataset contains the following 1 layer for maps provided in the Detailed Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer Name Projection (name) Page number Project Footprint NAD83 UTM Zone ...
1 alternate format found
French HTML
  • Relevance: 281.26
  • Données géospatiales connexes - Description détaillée du projet (anglais seulement) Cando Rail and Terminals a fourni des fichiers électroniques de données géospatiales le 4 juin 2024 liées au projet Projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon. L'ensemble de données contient 1 de couche pour les cartes fournies dans la description détaillée du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Additional Information
  • Reference Number: 23
  • Document Date: 2024-05-24
  • Document: 157659E.pdf
  • Relevance: 331.28
  • File CG3821 Cando Rail & Terminals Cando Sturgeon Rail Terminal West Expansion Summary of the Detailed Project Description Under the Impact Assessment Act N ½ 34-55-22-W4M Sturgeon County, Alberta Clifton Engineering Group Inc. www.clifton.ca 10509 - 46 Street SE, Calgary, AB T2C 5C2 T (403) 263-2556 Document Cover Sheet – Form 01075-D01 24 May 2024 File CG3821 Cando Rail & Terminals Cando Sturgeon Rail Terminal West Expansion Summary of the Detailed ...
1 alternate format found
French PDF
  • Relevance: 280.28
  • Dossier CG3821 Cando Rail & Terminals Résumé de la description detailée du projet d’agrandissement à l’ouest du terminal ferroviaire de Cando Sturgeon en vertu de la Loi sur l’évaluation d’impact N ½ 34-55-22-W4M Comté de Sturgeon, Alberta Clifton Engineering Group Inc. www.clifton.ca 10509 - 46 Street SE, Calgary, AB T2C 5C2 Tél. : 403 263-2556 Page de couverture du document – Formulaire 01075-D01 24 mai 2024 Dossier CG3821 Cando Rail & Terminals ...

Document Summary of Issues

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: Additional Information
  • Reference Number: 21
  • Document Date: 2024-04-12
  • Document: 157221E.pdf
  • Relevance: 327.59
  • April 12, 2024 — CANDO STURGEON RAIL TERMINAL WEST EXPANSION PROJECT — SUMMARY OF ISSUES – PAGE 1 OF 3 SUMMARY OF ISSUES – Cando Sturgeon Rail Terminal West Expansion This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Cando Sturgeon Rail Terminal West Expansion (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted by Cando Rail and ...
1 alternate format found
French PDF
  • Relevance: 276.59
  • 12 avril 2024 — PROJET D’AGRANDISSEMENT OUEST DU TERMINAL FERROVIAIRE DE CANDO STURGEON — SOMMAIRE DES QUESTIONSS – PAGE 1 DE 4 SOMMAIRE DES QUESTIONS – Agrandissement ouest du terminal ferroviaire de Cando Sturgeon Le présent document fournit un résumé général des questions qui ont été présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) au sujet du projet d’agrandissement ouest du terminal ferroviaire de Cando Sturgeon (le projet) pendant la période de consultation ...

Document Public Notice - Participant Funding Available

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Document Date: 2024-03-07
  • Document: 155857E.html
  • Relevance: 324.47
  • Public Notice Cando Sturgeon Rail Terminal West Expansion Project Participant Funding Available   March 7, 2024 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Cando Sturgeon Rail Terminal West Expansion Project, an expansion to an existing rail terminal facility located in Sturgeon County, Alberta. Funding is available for eligible ...
1 alternate format found
French HTML
  • Relevance: 273.47
  • Avis public Projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon Disponibilité d'une aide financière aux participants   7 mars 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon, l'agrandissement d'un terminal ferroviaire existante située ...

Document Public notice - Public comments invited on the Summary of the Initial Project Description

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-03-05
  • Document: 155803E.html
  • Relevance: 324.3
  • Public Notice Cando Sturgeon Rail Terminal West Expansion Project Public Comments Invited on the Summary of the Initial Project Description What is happening? March 5, 2024 — Cando Rail & Terminals is proposing the Cando Sturgeon Rail Terminal West Expansion Project, an expansion to an existing rail terminal facility located in Sturgeon County, Alberta. The Impact Assessment Agency of Canada (the Agency) invites Indigenous Peoples and the public to review the summary of the Initial ...
1 alternate format found
French HTML
  • Relevance: 273.3
  • Avis public Projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 5 mars 2024 — Cando Rail & Terminals propose le projet d'agrandissement ouest du terminal ferroviaire de Cando Sturgeon, l'agrandissement d'un terminal ferroviaire existante située dans le comté de Sturgeon, en Alberta. L'Agence d'évaluation d'impact du Canada (l'Agence) invite le public et les ...

Document Summary of the Initial Project Description of a designated project

  • Project Cando Sturgeon Rail Terminal West Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2024-03-04
  • Document: 155805E.pdf
  • Relevance: 324.22
  • File CG3821 Cando Rail & Terminals Cando Sturgeon Rail Terminal West Expansion Summary Project Description Under the Impact Assessment Act N ½ 34-55-22-W4M Sturgeon County, Alberta Clifton Engineering Group Inc. www.clifton.ca 10509 - 46 Street SE, Calgary, AB T2C 5C2 T (403) 263-2556 Document Cover Sheet – Form 01075-D01 12 February 2024 File CG3821 Cando Rail & Terminals Cando Sturgeon Rail Terminal West Expansion Summary Initial Project Description ...
1 alternate format found
French PDF
  • Relevance: 273.22
  • Cando Rail & Terminals Description initiale du projet d’agrandissement àl’ouest du terminal ferroviaire de Cando Sturgeon en vertu de la Loi sur l’évaluation d’impact N ½ 34-55-22-W4M Comté de Sturgeon, Alberta Dossier CG3821 Clifton Engineering Group Inc. www.clifton.ca 10509 - 46 Street SE, Calgary, AB T2C 5C2 Tél. : 403 263-2556 Page de couverture du document – Formulaire 01075-D01 23 Février 2024 Dossier CG3821 Cando Rail & Terminals ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: