Document Notice of Impact Assessment Decision with Reasons

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 32
  • Document Date: 2025-01-16
  • Document: 160493E.html
  • Relevance: 353.11
  • Notice of Impact Assessment Decision with Reasons Ottawa — January 16, 2025 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Marguerite Lake Compressed Air Energy Storage Project (the project) proposed by Federation Group Inc. (the proponent), located in Alberta. In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), IAAC considered each of the following factors: the Initial Project Description and response to ...
1 alternate format found
French HTML
  • Relevance: 302.11
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — le 16 janvier 2025 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas requise pour le projet de stockage d'énergie à air comprimé de Marguerite Lake (le projet) proposé par Federation Group Inc. (le promoteur), situé en Alberta. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (la LEI), l'AEIC a pris en considération chacun des éléments suivants: la ...

Document Notice of Time Limit Resumption

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 28
  • Document Date: 2025-01-10
  • Document: 160416E.html
  • Relevance: 352.54
  • Notice of Time Limit Resumption Ottawa — January 10, 2025 — On January 6, 2025, Federation Group Inc. (the proponent) provided its response to the Summary of Issues for the Marguerite Lake Compressed Air Energy Storage Project to the Impact Assessment Agency of Canada (IAAC). On January 10, 2025, IAAC determined that this document contains sufficient information to inform its section 16 decision regarding whether an impact assessment is required. The proponent thereby completed the activity ...
1 alternate format found
French HTML
  • Relevance: 301.54
  • Avis de reprise du délai Ottawa — 10 janvier 2025 — Le 6 janvier 2025, Federation Group Inc. (le promoteur) a fourni sa réponse au sommaire des questions (en anglais seulement) pour le projet de stockage d'énergie à air comprimé de Marguerite Lake à l'Agence d'évaluation d'impact du Canada (l'AEIC). Le 10 janvier 2025, l'AEIC a déterminé que ce document contenait suffisamment de renseignements pour éclairer sa décision en vertu de l'article 16 quant à savoir si une évaluation d'impact est ...

Document Plain English Summary of the Summary of Issues Response

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 30
  • Document Date: 2025-01-10
  • Document: 160418E.pdf
  • Relevance: 352.54
  • 21R-04370 Plain English Summary of the Summary of Issues Response Marguerite Lake Compressed Air Energy Storage Project Prepared for: Federation Group Inc. Prepared by: Vertex Professional Services Ltd. Date: January 2025 Federation Group Inc. Marguerite Lake CAES Project (NW-35-064-06 W4M) Summary of Issues January 2025 ii Plain English Summary Marguerite Lake Compressed Air Energy Storage Project ...
1 alternate format found
French PDF
  • Relevance: 301.54
  • 21R-04370 Réponse au sommaire des questions résumé en langage clair Projet de stockage d'énergie par air comprimé de Marguerite Lake NW-35-064-06 W4M Préparé pour: Federation Group Inc. Préparé par: Vertex Professional Services Ltd. Date: Janvier 2025 Federation Group Inc. Projet de stockage d'énergie par air comprimé de Marguerite Lake (NW-35-064-06 W4M) Réponse au sommaire ...

Document Supporting Geospatial Data - Initial Project Description

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Geospatial data files
  • Reference Number: 31
  • Document Date: 2025-01-10
  • Document: 160609E.html
  • Relevance: 352.54
  • Supporting Geospatial Data - Initial Project Description Federation Group Inc. has provided electronic geospatial data files on January 6, 2025, related to the Marguerite Lake Compressed Air Energy Storage Project. The dataset contains the following four layers for maps provided in the Initial Project Description. These data files are available to the public under the terms Open Government License –Canada Layer Name Projection (name) Page number Access Road UTM Zone 12 NAD ...
1 alternate format found
French HTML
  • Relevance: 301.54
  • Données géospatiales connexes — Description initiale du projet (anglais seulement) Federation Group Inc. a fourni des fichiers électroniques de données géospatiales le 6 janvier 2025 liées au projet de stockage d'énergie à air comprimé de Marguerite Lake. L'ensemble de données contient quatre couches pour les cartes fournies dans la description initiale du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Nom ...

Document Notice of time limit suspension with reasons

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Document Date: 2024-11-15
  • Document: 159610E.html
  • Relevance: 347.24
  • Notice of Time Limit Suspension with Reasons   Ottawa — November 15, 2024 — On November 1, 2024, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Marguerite Lake Compressed Air Energy Storage Project proposed by Federation Group Inc. (the proponent). IAAC has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have ...
1 alternate format found
French HTML
  • Relevance: 296.24
  • Avis de suspension du délai avec motifs   Ottawa — 15 novembre 2024 — Le 1 novembre 2024, l'Agence d'évaluation d'impact du Canada (l'AEIC) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de stockage d'énergie à air comprimé de Marguerite Lake, proposé par Federation Group Inc. (le promoteur). L'AEIC a pris cette mesure à la suite d'une demande écrite du promoteur (disponible seulement en anglais) de suspendre le délai ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 27
  • Document Date: 2024-11-15
  • Document: 159611E.html
  • Relevance: 347.24
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — November 15, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a ...
1 alternate format found
French HTML
  • Relevance: 296.24
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — 15 novembre 2024 — Le 20 juin 2024, la Loi no1 d'exécution du budget (2024) a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement ou l'Agence d'évaluation d'impact du ...

Document Summary of issues

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: Additional Information
  • Reference Number: 23
  • Document Date: 2024-02-07
  • Document: 155500E.pdf
  • Relevance: 322.01
  • February 7, 2024 — MARGUERITE LAKE COMPRESSED AIR ENERGY STORAGE PROJECT — SUMMARY OF ISSUES – PAGE 1 OF 4 SUMMARY OF ISSUES – Marguerite Lake Compressed Air Energy Storage Project This document provides a high-level summary of issues that were submitted to the Impact Assessment Agency of Canada (the Agency) about the Marguerite Lake Compressed Air Energy Storage Project (the Project) during the public comment period on the Summary of the Initial Project Description (IPD), submitted ...
1 alternate format found
French PDF
  • Relevance: 271.01
  • 7 février 2024 – PROJET DE STOCKAGE D’ÉNERGIE À AIR COMPRIMÉ DE MARGUERITE LAKE – RÉSUMÉ DES ENJEUX – PAGE 1 DE 5 UNCLASSIFIED - NON CLASSIFIÉ SOMMAIRE DES QUESTIONS – Projet de stockage d’énergie à air comprimé de Marguerite Lake Le présent document fournit un résumé général des questions qui ont été soumises à l’Agence d’évaluation d’impact du Canada (l’Agence) au sujet du Projet de stockage d'énergie à air comprimé de Marguerite Lake (le projet) pendant la période de ...

Document Public notice - Participant funding available

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Document Date: 2024-01-10
  • Document: 154863E.html
  • Relevance: 319.64
  • Public Notice Marguerite Lake Compressed Air Energy Storage Project Participant Funding Available   January 10, 2024 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Marguerite Lake Compressed Air Energy Storage Project, a new power plant located near La Corey, Alberta. Funding is available for eligible individuals and groups to support ...
1 alternate format found
French HTML
  • Relevance: 268.64
  • Avis public Projet de stockage d'énergie à air comprimé de Marguerite Lake Disponibilité d'une aide financière aux participants   10 janvier 2024 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet de stockage d'énergie à air comprimé de Marguerite Lake, une nouvelle centrale électrique située près de La Corey, en Alberta. Cette ...

Document Public Notice - Comments Invited on the Summary of the Initial Project Description

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2024-01-08
  • Document: 154890E.html
  • Relevance: 319.47
  • Public Notice Marguerite Lake Compressed Air Energy Storage Project Comments Invited on the Summary of the Initial Project Description What is happening? January 8, 2024 — Federation Group Inc. is proposing the Marguerite Lake Compressed Air Energy Storage Project, a new power plant located near La Corey, Alberta. The Impact Assessment Agency of Canada (the Agency) invites the public and Indigenous Peoples to review the summary of the Initial Project Description and provide comments on ...
1 alternate format found
French HTML
  • Relevance: 268.47
  • Avis public Projet de stockage d'énergie à air comprimé de Marguerite Lake Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 8 janvier 2024 — Federation Group Inc. propose le projet de stockage d'énergie à air comprimé de Marguerite Lake, une nouvelle centrale électrique située près de La Corey, en Alberta. L'Agence d'évaluation d'impact du Canada (l'Agence) invite les peuples autochtones et le public à examiner le résumé de la ...

Document Summary of the initial project description of a designated project

  • Project Marguerite Lake Compressed Air Energy Storage Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2023-11-23
  • Document: 154764E.pdf
  • Relevance: 315.62
  • 21R-04370 Initial Project Description – Plain Language Summary Marguerite Lake Compressed Air Energy Storage NW-35-064-06 W4M Prepared for: Federation Group Inc. Prepared by: Vertex Professional Services Ltd. Date: November 23, 2023 Federation Group Inc. Marguerite Lake Compressed Air Energy Storage NW-35-064-06 W4M Initial Project Description – Plain Language Summary November ...
1 alternate format found
French PDF
  • Relevance: 264.62
  • 21R-04370 Description initiale du Projet - Résumé en langage clair Lac Marguerite Stockage d'énergie par air comprimé NW-35-064-06 W4M Préparé pour: Federation Group Inc. Préparé par: Vertex Professional Services Ltd. Date: 23 novembre 2023 Federation Group Inc. Lac Marguerite SEAC NW-35-064-06 W4M Description initiale du Projet - Résumé en langage clair Novembre 2023 Polyvalence. Compétence. ii 23 novembre, 2023 ...