Document Notice of Determination

  • Project Energy Performance Contract: Specific Measure TA1 and TA2 - S1 Conversion to Hydronic Heating - Canadian Forces Base Halifax
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-11-19
  • Document: 153516E.html
  • Relevance: 375.51
  • Notice of Determination November 19, 2023 The Department of National Defence has determined that the proposed ‘Energy Performance Contract: Specific Measure TA1 and TA2 - S1 Conversion to Hydronic Heating' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; ...
1 alternate format found
French HTML
  • Relevance: 324.51
  • Avis de détermination Le 19 novembre 2023 Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Marché de services écoénergétiques : Mesures S1 propres aux bâtiments TA1 et TA2 - conversion au chauffage hydronique' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances ...

Document Public Comment Period on Intent to Make a Determination

  • Project Energy Performance Contract: Specific Measure TA1 and TA2 - S1 Conversion to Hydronic Heating - Canadian Forces Base Halifax
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-08-23
  • Document: 152843E.html
  • Relevance: 366.62
  • Public Comment Period on Intent to Make a Determination Energy Performance Contract: Specific Measure TA1 and TA2 – S1 Conversion to Hydronic Heating – Canadian Forces Base Halifax August 23, 2023 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the ...
1 alternate format found
French HTML
  • Relevance: 315.62
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Marché de services écoénergétiques : Mesures S1 propres aux bâtiments TA1 et TA2 – conversion au chauffage hydronique – Base des Forces canadiennes de Halifax Le 23 août 2023 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: