New Decentralized Gas Heating - Naval Armament Depot, Canadian Forces Base Halifax

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project New Decentralized Gas Heating - Naval Armament Depot, Canadian Forces Base Halifax
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-05-25
  • Document: 143918E.html
  • Relevance: 324.35
  • Notice of Determination May 25, 2022 – Naval Armament Depot, Canadian Forces Base Halifax The Department of National Defence has determined that the proposed ‘New Decentralized Gas Heating' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures The Department of National Defence is satisfied that that the carrying out of the project ...
1 alternate format found
French HTML
  • Relevance: 273.35
  • Avis de détermination Le 25 mai 2022 – Dépôt naval d'armement, Base des Forces canadiennes Halifax Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Nouveaux systèmes de chauffage décentralisés au gaz naturel' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense ...

Document Public Comment Period on Intent to Make a Determination

  • Project New Decentralized Gas Heating - Naval Armament Depot, Canadian Forces Base Halifax
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-11-15
  • Document: 142038E.html
  • Relevance: 308.46
  • Public Comment Period on Intent to Make a Determination New Decentralized Gas Heating – Naval Armament Depot, Canadian Forces Base Halifax November 15, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be ...
1 alternate format found
French HTML
  • Relevance: 257.46
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Nouveaux systèmes de chauffage décentralisés au gaz naturel – dépôt naval d'armement, Base des Forces canadiennes Halifax Le 15 novembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: