Trois-Rivières Port Facilities Expansion Project (Terminal 21)

Registry Search Mobile

Registry Search

Skip to Filters

91 results

Document Notice of Time Limit Extension

  • Project Trois-Rivières Port Facilities Expansion Project
  • Document Category: Additional Information
  • Reference Number: 53
  • Updated: 2022-08-18
  • Document: 144836E.html
  • Relevance: 339.97
  • Notice of Time Limit Extension Ottawa – August 18, 2022 – The Impact Assessment Agency of Canada (the Agency) granted an extension to the three-year time limit for the Trois-Rivières Port Authority (the proponent) to provide the required information or studies described in the Final Environmental Impact Statement Guidelines for the environmental assessment of the Trois-Rivières Port Facilities Expansion Project (Terminal 21). The Agency has taken this action further to a written request ...
1 alternate format found
French HTML
  • Relevance: 288.97
  • Avis de prolongation du délai Ottawa, le 18 août 2022 – L'Agence d'évaluation d'impact du Canada (l'Agence) a accordé une prolongation du délai de trois ans pour que l'Administration portuaire de Trois-Rivières (le promoteur) fournisse les études ou renseignements requis dans la version définitive des lignes directrices relatives à l'étude d'impact environnemental du projet d'agrandissement des installations portuaires de Trois-Rivières (Terminal 21). L'Agence a pris cette mesure après ...

Document Agency's Guide to Virtual Sessions

  • Project Trois-Rivières Port Facilities Expansion Project
  • Document Category: Additional Information
  • Reference Number: 27
  • Updated: 2021-09-17
  • Document: 141356E.pdf
  • Relevance: 311.05
  • www.canada.ca/iaac www.canada.ca/aeic ZOOM USER GUIDE Virtual information sessions on the summary of the Environmental Impact Statement for the Trois-Rivières Port Facilities Expansion Project (the project) will be done using Zoom. How to connect to the Zoom Virtual Sessions? September 23, 2021 September 27, 2021 September 29, 2021 The Agency is inviting you to a scheduled Zoom meeting. Topic: ...
1 alternate format found
French PDF
  • Relevance: 260.05
  • www.canada.ca/iaac www.canada.ca/aeic Guide de l’application Zoom Les séances de consultation virtuelles portant sur le résumé de l’étude d’impact environnemental du Projet d'agrandissement des installations portuaires de Trois-Rivières (le projet) se feront en utilisant l’outil Zoom. 23 septembre, 2021 27 septembre, 2021 29 septembre, 2021 L’Agence vous invite à une réunion Zoom planifiée. Sujet : Résumé ...

Document Summary of the Environmental Impact Statement

  • Project Trois-Rivières Port Facilities Expansion Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Updated: 2021-09-09
  • Document: 141217E.pdf
  • Relevance: 310.4
  • TROIS-RIVIÈRES PORT AUTHORITY TERMINAL 21 CONSTRUCTION PROJECT SUMMARY OF THE ENVIRONMENTAL IMPACT ASSESSMENT STUDY Submitted to the Impact Assessment Agency of Canada Fi le Number: 5534 AUGUST 2021 WSP Canada Inc. TERMINAL 21 CONSTRUCTION PROJECT SUMMARY OF THE ENVIRONMENTAL IMPACT ASSESSMENT STUDY TROIS-RIVIÈRES PORT AUTHORITY FINAL VERSION PROJECT NO.: 201-04975-00 DATE: AUGUST 2021 Abstract filed with the Impact ...
1 alternate format found
French PDF
  • Relevance: 259.4
  • ADMINISTRATION PORTUAIRE DE TROIS-RIVIÈRES PROJET DE CONSTRUCTION DU TERMINAL 21 RÉSUMÉ DE L’ÉTUDE D’IMPACT ENVIRONNEMENTAL Déposé à l’Agence d’évaluation d’impact du Canada Numéro de doss ier : 5534 AOÛT 2021 WSP Canada Inc. PROJET DE CONSTRUCTION DU TERMINAL 21 RÉSUMÉ DE L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ADMINISTRATION PORTUAIRE DE TROIS-RIVIÈRES VERSION FINALE PROJET NO : 201-04975-00 DATE : AOÛT 2021 Résumé ...

Document Public Notice - Public Comments Invited on a Summary of the Environmental Impact Statement

  • Project Trois-Rivières Port Facilities Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 24
  • Updated: 2021-09-09
  • Document: 141355E.html
  • Relevance: 310.4
  • Public Notice Trois-Rivières Port Facilities Expansion Project — Public Comments Invited on the summary of the Environmental Impact Statement Update: Click here to access the virtual information session on September 23, 2021 (French only), from 7 p.m. to 8:30 p.m. EDT, Meeting ID: 873 8963 4042, Passcode : 489025 Click here to access the virtual information session on September 27, 2021 (French only), from 7 p.m. to 8:30 p.m. EDT, Meeting ID: 847 0295 8112, Passcode : 753566 Click ...
1 alternate format found
French HTML
  • Relevance: 259.4
  • Avis Public Projet d'agrandissement des installations portuaires de Trois-Rivières — Période de consultation publique sur le résumé de l'étude d'impact environnemental Mise à jour : Cliquez ici pour participer à la séance d'information virtuelle du 23 septembre 2021, de 19 h à 20 h 30 HAE, ID de réunion : 873 8963 4042, Code d'accès : 489025 Cliquez ici pour participer à la séance d'information virtuelle du 27 septembre 2021, de 19 h à 20 h 30 HAE, ID de réunion : 847 0295 8112, Code ...