Site C Clean Energy Project

Registry Search Mobile

Registry Search

Skip to Filters

4528 results

Document Notice of Updated Decision Statement

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2879
  • Document Date: 2025-12-18
  • Document: 164235E.html
  • Relevance: 387.68
  • Notice of Updated Decision Statement Ottawa — December 19, 2025 — The Impact Assessment Agency of Canada (IAAC) has published an updated Decision Statement for Site C Clean Energy Project (the project), following a notice of change submitted by BC Hydro and Power Authority (BC Hydro) on May 7, 2025.  BC Hydro proposed a change to the installed capacity of the generating station from 1,100 MW to a maximum of 1,230 MW. IAAC reviewed the proposed change and determined that it would result in ...
1 alternate format found
French HTML
  • Relevance: 336.68
  • Avis de mise à jour de la déclaration de décision Ottawa – le 19 décembre 2025 – L'Agence d'évaluation d'impact du Canada (AEIC) a publié une version mise à jour de la déclaration de décision  pour le projet d'énergie propre du Site C (le projet) à la suite d'un avis de modification soumis par BC Hydro and Power Authority (BC Hydro) le 7 mai 2025. BC Hydro a proposé de modifier la capacité installée de la centrale de 1 100 MW à un maximum de 1 230 MW. L'AEIC a examiné la modification ...

Document Updated Decision Statement

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2880
  • Document Date: 2025-11-25
  • Document: 164236E.pdf
  • Relevance: 385.25
  • Page 1 of 23 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to British Columbia Hydro and Power Authority c/o Brian Knoke Executive Vice President 333 Dunsmuir Vancouver, British Columbia V6B 5R3 for the Site C Clean Energy Project Description of the Designated Project BC Hydro and Power Authority (the Proponent) proposes to construct and operate a dam and 1,150 to 1,230-megawatt hydroelectric generating ...
1 alternate format found
French PDF
  • Relevance: 334.25
  • Page 1 of 24 Déclaration de décision émise en vertu de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à British Columbia Hydro and Power Authority a/s Brian Knoke Vice-président exécutif 333, rue Dunsmir Vancouver (Colombie-Britannique) V6B 5R3 pour le projet d’énergie propre du Site C Description du projet désigné BC Hydro and Power Authority (le promoteur) propose de construire et d’exploiter un barrage et une centrale ...

Document Annual Reports - 2024

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2875
  • Document Date: 2025-03-24
  • Document: 163620E.html
  • Relevance: 360.29
  • Annual Reports - 2024 2024 Annual Report – Air Quality Management Plan (PDF – 3.7 MB) Aboriginal Group Communication Plan 2024-2025 Annual Report (PDF – 267 KB) Accidents and Malfunctions Plan Annual Update: 2024 (PDF – 267 KB) Acid Rock Drainage and Metal Leachate Management Plan – Water Quality Annual Report January 1 to December 31, 2024 (PDF – 361 KB) Appendix A – Site C Clean Energy Project Acid Rock Drainage and Metal Leachate Management Plan 2024 Annual Montoring Report (Lorax ...
1 alternate format found
French HTML
  • Relevance: 309.29
  • Rapport annuel - 2024 (anglais seulement 2024 Annual Report – Air Quality Management Plan (PDF – 3.7 MB) Aboriginal Group Communication Plan 2024-2025 Annual Report (PDF – 267 KB) Accidents and Malfunctions Plan Annual Update: 2024 (PDF – 267 KB) Acid Rock Drainage and Metal Leachate Management Plan – Water Quality Annual Report January 1 to December 31, 2024 (PDF – 361 KB) Appendix A – Site C Clean Energy Project Acid Rock Drainage and Metal Leachate Management Plan 2024 Annual ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2871
  • Document Date: 2024-07-18
  • Document: 158126E.html
  • Relevance: 336.86
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 285.86
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Document Annual Reports - 2023

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2874
  • Document Date: 2024-03-19
  • Document: 163599E.html
  • Relevance: 326.15
  • Annual Reports - 2023 2023 Annual Report – Air Quality Management Plan (PDF – 8.7 MB) Aboriginal Group Communication Plan 2023-2024 Annual Report (PDF – 289 KB) Aboriginal Plant Use Mitigation Plan 2023-2024 Annual Report (PDF – 265 KB) Aboriginal Training and Inclusion Plan 2023-2024 Annual Report (PDF – 286 KB) Accidents and Malfunctions Plan Annual Update: 2023 (PDF – 965 KB) Acid Rock Drainage and Metal Leachate Management Plan – Water Quality Annual Report: January 1 to December ...
1 alternate format found
French HTML
  • Relevance: 275.15
  • Rapport annuel - 2023 (anglais seulement) 2023 Annual Report – Air Quality Management Plan (PDF – 8.7 MB) Aboriginal Group Communication Plan 2023-2024 Annual Report (PDF – 289 KB) Aboriginal Plant Use Mitigation Plan 2023-2024 Annual Report (PDF – 265 KB) Aboriginal Training and Inclusion Plan 2023-2024 Annual Report (PDF – 286 KB) Accidents and Malfunctions Plan Annual Update: 2023 (PDF – 965 KB) Acid Rock Drainage and Metal Leachate Management Plan – Water Quality Annual Report: ...

Document Implementation schedule - 2023

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2877
  • Document Date: 2023-10-17
  • Document: 164242E.html
  • Relevance: 313.16
  • Implementation Schedule Annual Update of the Implementation Schedule for Federal Decision Statement Conditions - October 17, 2023 (PDF – 590 KB) Construction Schedule – March 2023 (PDF – 96 KB)
1 alternate format found
French HTML
  • Relevance: 262.16
  • Le calendrier de mise en œuvre (anglais seulement) Annual Update of the Implementation Schedule for Federal Decision Statement Conditions - October 17, 2023 (PDF – 590 KB) Construction Schedule – March 2023 (PDF – 96 KB)

Document Inspection summary

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2873
  • Document Date: 2023-07-18
  • Document: 158936E.html
  • Relevance: 305.82
  • Inspection Summary Project Name: Site C Clean Energy Project Proponent Name: British Columbia Hydro and Power Authority Inspection Date: July 18-19, 2023 Project Description: The proposed project consists of constructing and operating a dam and 1,100-megawatt hydroelectric generating station on the Peace River in north-eastern British Columbia. The Project would be the third in a series of dams on the Peace River in British Columbia. The Project components are an earthfill dam 1,050 ...
1 alternate format found
English PDF
  • Relevance: 305.82
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Site C Clean Energy Project Proponent Name: British Columbia Hydro and Power Authority Inspection Date: July 18-19, 2023 Project Description: The proposed project consists of constructing and operating a dam and 1,100-megawatt hydroelectric ...

Document Analysis of BD Hydro's proposed New Borrow Source for Construction of Reservoir Cleaning Access Roads (Halfway River East Borrow Source)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2867
  • Document Date: 2022-12-08
  • Document: 145723E.pdf
  • Relevance: 288.94
  • Impact Assessment Agency of Canada ANALYSIS OF BC HYDRO ’S PROPOSED NEW BORROW SOURCE FOR CONSTRUCTION OF RESERVOIR CLEARING ACCESS ROADS (HALFWAY RIVER EAST BORROW SOURCE) DECEMBER 2022 2 Table of Contents Impact Assessment Agency of Canada ................................................................................. 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 237.94
  • Agence d’évaluation d’impact du Canada ANALYSE DE LA NOUVELLE SOURCE D’EMPRUNT PROPOSÉE PAR BC HYDRO POUR LA CONSTRUCTION DES ROUTES D’ACCÈS AU DÉBLAIEMENT DU RÉSERVOIR (SOURCE D’EMPRUNT À L’EST DE LA RIVIÈRE HALFWAY) DÉCEMBRE 2022 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 1. Introduction ...

Document Amendment Analysis Report (see Reference #2865)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2866
  • Document Date: 2022-10-14
  • Document: 145281E.pdf
  • Relevance: 284.99
  • Impact Assessment Agency of Canada ANALYSIS OF BC HYDRO ’S PROPOSED CHANGES TO THE HIGHWAY 29 CROSSING DESIGNS AT FARRELL CREEK, DRY CREEK AND LYNX CREEK FOR THE SITE C CLEAN ENERGY PROJECT OCTOBER 2022 2 Table of Contents Impact Assessment Agency of Canada ................................................................................. 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 233.99
  • Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS PAR BC HYDRO AUX CONCEPTIONS DES TRAVERSES DE LA ROUTE 29 AUX RUISSEAUX FARRELL, DRY ET LYNX POUR LE PROJET D ’ÉNERGIE PROPRE DU SITE C OCTOBRE 2022 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 Table des matières ...