I am very concerned about the short term life of this project versus the potential benefits. I do not see the need for an AI data centre. Most importantly, I have grave concerns about the environmental impacts in a province that has been shown to not enforce safety standards or clean up standards of projects already. What is the impact going to be on local water usage, and area water quality? What will the impact be on air quality, which is already a struggle in this province? In my opinion this is not needed, and is in a poor location. This project needs more transparent studies and plans in regards to safety, regluatory enforcement, and environmental impacts over the intended lifetime of the project.
- Présenté par
- Donna Bartsch
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2026-01-12 20 h 37