Concerned Residents

Numéro de référence
97
Texte

I am writing to express my formal opposition to the Beacon AI Centers Indus Project based on the following concerns:

  1. Regulatory Conflict: The project directly contradicts the SSRP’s mandate for sustainable water management and agricultural preservation.
  2. Public Health: The proximity (2 km) to the Indus School and Community Centre necessitates a federal review of cumulative air and noise emissions.
  3. Water Security: The daily draw of 1.5 million liters of potable water during a period of extreme regional drought is an unsustainable use of shared resources.
  4. Land Use: Redesignating Agricultural Heartland to a Special Industrial District sets a dangerous precedent for the loss of Alberta's food-producing land.

Request: I request that the IAAC require a full Environmental Impact Statement (EIS) that includes a Groundwater Impact Study and a Human Health Risk Assessment for the Hamlet of Indus.

Sincerely,

Elizabeth Barrett

Présenté par
Indus and Area Residents Group
Phase
Planification
Avis public
S.O.
Pièce(s) jointe(s)
S.O.
Étiquettes de commentaires
Opposition générale au projet
Date et heure de soumission
2026-03-06 1 h 09