Projet de centres d'IA de Beacon à Indus
Strongly opposed to this project
- Numéro de référence
- 56
- Texte
Albertans do NOT need an AI data center built here. We have other pressing issues right now that need more attention, such as in Calgary, where we need to fix and improve our main water pipe systems as they're old and may break again. Not to mention, the water and electricity usage concerns this data center will use. It will heavily increase the use of both resources and create future problems that could be avoided if this is not built. Its not worth lowering our quality of life to build and keep such a building operational, at all.
- Présenté par
- Melissa Ta
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2026-01-14 22 h 03