Projet de centres d'IA de Beacon à Indus
Disappointed
- Numéro de référence
- 49
- Texte
I am very disappointed that this project is being considered. Albertans have been so vocal against the coal mining in the rockies, why would we want something else that will have long lasting and permanent environmental repercussions? 25 years is not a long time but the damage this centre will bring is not worth any length of time the benefit would bring.
- Présenté par
- Heather Galarneau
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2026-01-13 20 h 51