Projet de centre de données Mihta Askiy
The start of a whole new era
- Numéro de référence
- 16
- Texte
As a woodland Cree First Nation #474 member I'd like to welcome it with open arms
Just to think It would be the start of something for our reservation just like The Canadian Pacific Railway was the start of Canada .
We just need one big or medium project to get the ball rolling in our community.
I always go back to we voted for a land back deal we need to make life better for the next generation even if it means stepping out of our comfort zone and doing what is right for the future generations to come.
we just need one major project on our land to get the ball rolling and this could be a great opportunity to the start of something.
ps. I gotta mention so people know we are talking about a 650 MW power plant and people need to think On average, a 500 MW power plant can supply about 355,000 homes with electricity.
⚡️- Présenté par
- Ben Whitehead
- Phase
- Planification
- Avis public
- Avis public -Période de consultation publique sur le résumé de la description initiale du projet et possibilité d'aide financière
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2026-01-05 12 h 20