Projet de nouvelle centrale nucléaire à Wesleyville
Concerns Today
- Numéro de référence
- 778
- Texte
Concerns I have are as follows:
1/ Air and Water quality during and after the construction of the project. The environmental impact on both of these items.
2/ Impacts to the ecostructure of the area with such a large and and continuous construction project.
3/ Health concerns regarding Nuclear and the chance of an accident or just the overall health of the immediate population. Is there a specific plan for New Medical Services to be added to the Town to accommodate this additional population increase and the added risk for the area.
- Présenté par
- Norm ORVISS
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique et séances d'information sur les versions provisoires des lignes directrices individualisées intégrées relatives à l'étude d'impact intégrées et du plan de participation du public
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2026-04-19 11 h 08