Kitasoo Lake Dam Access Road

This project will construct an access road from the community of Klemtu (Kitasoo IR1) to the community water supply dam at Kitasoo Lake. Currently no vehicle access roads extend to the dam site and historical construction activities required access on foot, or equipment and material transport via heavy lift helicopter. The existing dam is in poor structural condition and is leaking, representing a substantial risk to the community's water supply. The new access road is necessary to facilitate emergency dam stabilization work (planned for late-summer 2025), dam replacement (planned for summer 2026), and long-term dam safety operations. In summary, this will be a single-lane resource type road suitable for use by pickup trucks and standard civil construction equipment. The finished road will be gravel surfaced. Clearing widths and total project footprint are currently being finalized through detailed design.


Latest update

August 26, 2025 - The assessment process has been terminated.

Participate

Contacts

BC Environment Team
Indigenous Services Canada
600-1138 Melville Street
Vancouver, British Columbia V6E 4S3
Email: bcciarpubliccomments@sac-isc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Kitasoo IR 1 and R/W plan no. 108692 (British Columbia)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Terminated
  • Start Date

    2025-04-09
  • Proponent

    Kitasoo First NAtion
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    89440