Comments on the Draft Integrated Tailored Impact Statement Guidelines and Related Consultation Documents for the Nuclear Waste Management Organization’s Proposed Deep Geological Repository

Numéro de référence
837
Texte

ParadigmForge AI Inc. respectfully submits the attached comment brief on the scoping-stage consultation documents published for the Nuclear Waste Management Organization’s proposed Deep Geological Repository (DGR) for Canada’s Used Nuclear Fuel. The comment period closes on May 10, 2026.
The attached brief covers six analytical dimensions:
1.
Scoping adequacy of the Draft TISG — whether the guidelines compel NWMO to assess every subject required under IAA s.22(1), the CNSC REGDOC framework, and the dual-regulator integrated process.
2.
Adequacy of the Crown consultation structure — whether the Draft Public Participation Plan and the Draft Indigenous Engagement and Partnership Plan together meet the Crown’s duty to consult and accommodate Indigenous Peoples whose rights may be adversely impacted, including rights-bearing communities under Treaty 3 and UNDRIP-aligned frameworks.
3.
Integrated assessment structure — whether the Protocol among IAAC, CNSC and NWMO, together with the Draft Cooperation Plan, delivers a genuinely integrated assessment that satisfies both the Impact Assessment Act and the Nuclear Safety and Control Act without creating duplicative, contradictory, or sequentially dependent obligations.
4.
Long-duration scope — whether the documents adequately address post-closure monitoring, institutional control, and passive-safety phases over the full containment timeframe.
5.
Regional context and cumulative effects — whether the TISG and NWMO Initial Project Description Summary adequately scope regional cumulative effects and environmental baseline characterization for the Revell Site near Ignace, Ontario.
6.
Permitting plan completeness — whether the Draft Permitting Plan captures the full stack of federal authorizations the project will require across all phases and regulatory regimes.

Présenté par
ParadigmForge AI Inc.
Phase
Planification
Avis public
Avis public - Période de consultation publique et séances d'information sur les versions provisoires des lignes directrices individualisées intégrées relatives à l'étude d'impact intégrées et du plan de participation du public
Pièce(s) jointe(s)
  • ParadigmForge_NWMO_DGR_Comment_Brief.pdf (2,6 Mo)
  • Étiquettes de commentaires
    Accidents / défauts de fonctionnement Faune / habitat de la faune Géologie / Géomorphologie Qualité de l'eau souterraine Santé humaine et bien-être
    Date et heure de soumission
    2026-05-08 8 h 04
    Date de modification :