I think it is premature and irresponsible to apply for a permit before establishing if there is a demonstrated need for more reactors, without specifying what design you wish to build and without a viable solution for the disposal of the radioactive waste that will be produced. This all seems bizar

Numéro de référence
224
Texte

I think it is premature and irresponsible to be requesting a permit when the need for more reactors has not been demonstrated, when the design has not been specified, and a plan for the disposal of the radioactive waste has not been decided. This is bizarre.

Présenté par
Sheila Burr
Phase
Planification
Avis public
Avis public - Période de consultation publique et séances d'information sur la version provisoire des lignes directrices individualisées intégrées relatives à l'étude d'impact et du plan de participation du public
Pièce(s) jointe(s)
S.O.
Date et heure de soumission
2025-07-11 22 h 20
Date de modification :