Projet de centrale nucléaire Bruce C
I think it is premature and irresponsible to apply for a permit before establishing if there is a demonstrated need for more reactors, without specifying what design you wish to build and without a viable solution for the disposal of the radioactive waste that will be produced. This all seems bizar
- Numéro de référence
- 224
- Texte
I think it is premature and irresponsible to be requesting a permit when the need for more reactors has not been demonstrated, when the design has not been specified, and a plan for the disposal of the radioactive waste has not been decided. This is bizarre.
- Présenté par
- Sheila Burr
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique et séances d'information sur la version provisoire des lignes directrices individualisées intégrées relatives à l'étude d'impact et du plan de participation du public
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2025-07-11 22 h 20