Projet aurifère Great Bear
Great Bear Gold Project - Comments - Draft Tailored Impact Guidelines & Draft Public Participation Plan
- Numéro de référence
- 56
- Texte
Please see the attached files which provide the comments.
Great Bear Gold Project - Comments - Draft Tailored Impact Guidelines - Catherine Doucet
Great Bear Gold Project - Comments - Draft Public Participation Plan - Catherine Doucet
Borehole, drilling muds, and surface water contamination risks at the Great Bear Gold Project
Thank you.
Catherine Doucet
- Présenté par
- Catherine Doucet
- Phase
- Planification
- Avis public
- Avis public - Période de consultation public sur la version provisoire des lignes directrices individualisées relatives à l'étude d'impact et le plan de participation du public
- Pièce(s) jointe(s)
-
- Borehole, drilling muds, and surface water contamination risks at the Great Bear Gold Project.pdf (2,9 Mo)
- Great Bear Gold Project - Comments - Draft Public Participation Plan - Catherine Doucet.pdf (65,4 Ko)
- Great Bear Gold Project - Comments - Draft Tailored Impact Guidelines - Catherine Doucet.pdf (73,6 Ko)
- Date et heure de soumission
- 2024-06-07 23 h 36