Projet de production d'énergie éolienne et d'hydrogène de Port au Port-Stephenville
Project information clarification - water supply
- Numéro de référence
- 18
- Texte
Here is the response to your question.
The water comes from all three ponds. It is pumped from Muddy Pond which is connected to Noels Pond to Gull/Mine Pond. Noels Pond water comes from the Warm Creek drainage basin. The plant will then draw its water from Gull_Mine Pond by a separate pipeline.
Please advise if you have any further questions.
Cathy
- Présenté par
- Administrateur de la part de Cathy Dornan
- Phase
- S.O.
- Avis public
- S.O.
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2023-08-18 14 h 00