Projet du carrefour de l'énergie propre de Marmora
Quinte Conservation Staff Comments
- Numéro de référence
- 15
- Texte
Quinte Conservation staff have reviewed the project proposal. The following items should be addressed:
- The potential for water temperature changes for the receiving waterbody during initial pumping of the mine. The effect of potential water temperature changes on existing biota.
- The water quality of the mine in comparison to the water quality of the receiving waterbody.
- The timing of the initial pumping both from a water quantity and quality perspective.
- Potential Erosion/geomorphology effects on receiving waterbody.
- The potential for disturbance to watercourses and wetlands (temporary and permanent) for the installation of roads, transmission lines and pumping infrastructure.
- Présenté par
- Quinte Conservation
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique sur le résumé de la description initiale du projet
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2023-06-12 10 h 40