Rail Spur Line

Numéro de référence
63
Texte

The Project Plan first stage of mining operations and milling process will require to run a rail spur line to connect with the Glencore existing rail from its Kidd metsite to the Metallurgical site at Hoyle. Will the proponent evalute the remaining tailings capacity at the Hoyle Metsite and possibly increase long term capacity of the existing infrastructure and treatment? Eliminating the need for a Process Plant and associated Tailings Management Facility at the Crawford Site would reduce the sensitive environmental impact on the existing landscape and surrounding watershed. The existing Process Plant at the Glencore Metallurgical site could be fully converted to run Crawford Ore for a much longer period than the initial plan design.   

Présenté par
Laurent Robichaud
Phase
Planification
Avis public
Avis public : Période de consultation publique sur les versions provisoires des lignes directrices individualisées relative à l'étude d'impact et du plan de participation du public
Pièce(s) jointe(s)
S.O.
Date et heure de soumission
2023-03-06 19 h 56
Date de modification :