Re-Establishing Our Healing Journeys

Project Description:

The project purpose is to rebuild the administration area that was heavily destroyed by fire and to renovate the residential area damaged by smoke. This portion of the building has been gutted to the studs. This land is currently developed, cleared, with access to local services - water, sewer, natural gas, hydro and telephone.

The design will include a new layout and restoration of the existing building which was damaged by the fire. The proposed expansion area is estimated to be 10,688.9sq.ft and will include the following: Multi-Purpose Room, Weight Room, 3 Teddy Bear Therapy Rooms, 3 Counsellor Offices, additional Administration Offices, Learning/Classroom, Arts & Crafts Room and a Ceremonial Circle Room. The existing building restoration is approximately 10,383.8sq.ft and includes the kitchen, reception, dining area, residential suites and some programming. The total new building area will be approximately 21,072.7sq.ft. reflecting our culturally appropriate trauma informed programs.

Scope of work:

  • Re-building the main structure in its original footprint
  • Constructing 3 new expanded additions to the main structure
  • Construct additional parking lot with its own separate entrance from New Credit Road (with granular)
  • The existing pond will have the addition of downspouts connected and will run underneath any roadways or walkways so that storm water can be directed via overland drainage to the pond after outlet.

The current property is approximately 10 acres. In addition to the main structure, property currently houses 3 decommissioned septic beds, 1 parking lot, 2 small storage maintenance garages, and a pavilion behind the main building.

This land is currently developed, cleared, with access to local services - water, sewer, natural gas, hydro and telephone. The project may require excavation activities but will not require any vegetation clearing or works in water.

More


Latest update

Notice of Determination

2021-05-19 –  Infrastructure Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination: Re-Establishing Our Healing Journeys - May 19, 2021
1 Notice of Intent to Make a Determination - Start of Public Comment Period - April 9, 2021

Contacts

Aboriginal Consultation and Environmental Services
1100 - 180 Kent St
Ottawa, Ontario K1P 0B6
Email: infc.aboriginalconsultenv-consultautochtonesenv.infc@canada.ca

Infrastructure Canada
Meng Koh, Senior Environmental Review and Approvals Officer
180 Kent Street
Ottawa, Ontario K1P 0B6
Telephone: 343-551-0418
Email: meng.koh@infc.gc.ca


  • Location

    • Mississaugas of the Credit First Nation Reserve (Ontario)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2021-04-09
  • Proponent

    Native Horizons Treatment Centre
  • Authorities

    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81509