Power Plant and Distribution System, Op IMPACT, Ali Al-Salem Air Base, Kuwait

The Canadian Task Force on Op IMPACT in Kuwait will construct a new centralized power plant. This will include the construction of a new reinforced concrete pad with a berm, installation of two one mega-watt generators, the construct of two sun shades and a new Power Distribution Unit (PDU) concrete pad with a cable pit. This project will also include the purchase and installation of four (4) main conductor runs required to interconnect the Camp's main Power Distribution Unit (PDU) to the Camp's Secondary Distribution Units (SDUs).


Latest update

April 01, 2021 - The assessment process has been terminated.

Participate

Contacts

Environmental Engineer, Canadian Joint Operations Command
Department of National Defence
Shawn Burdett, Environmental Engineer, Canadian Joint Operations Command
Canadian Joint Operations Command
101 Colonel By Drive
Ottawa, Ontario K1A 0K2
Email: Shawn.Burdett@forces.gc.ca


  • Location

    • Ali Al-Salem Air Base, Kuwait (Outside Canada)
  • Nature of Activity

    • Building and Property Development
    • Defense and Security
  • Assessment Status

    Terminated
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project outside of Canada
  • Reference Number

    81157
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 
Date modified: