No to Tilbury project

Numéro de référence
34
Texte

The Tilbury Project should be cancelled on two grounds:

1. SIGTTO, Society of Gas Tanker and Terminal Operators, an industry association, advises against tanker traffic and facility siting within 3500m of busy waterways and populated areas, for safety concerns. The Tilbury project and shipping routes don't meet that standard and are directly across the river from a large jet fuel tank farm.

2. COVID-19 has been terrible of course but the cessation of much of human activities has been positive for the earth. As Canada plans for a new normal, that should include making the environment a priority. We need a green and clean economy.

 

Présenté par
Judith Doyle
Phase
Planification
Avis public
Avis public - Période de consultation publique et portes ouvertes virtuelles
Pièce(s) jointe(s)
S.O.
Date et heure de soumission
2020-07-16 12 h 07