Projet d'agrandissement de l'installation de GNL Tilbury - phase 2
Full support of the Tilbury LNG expansion project
- Numéro de référence
- 27
- Texte
Hello:
I am writing to support the Tilbury LNG expansion project for the following reasons:
- The project will produce clean-burning LNG that will replace Bunker C and MGO as ship fuels, thereby greatly reducing NOx, SOx and particulate emissions.
- The project will be fully electrified (E-LNG), so it will be a very clean LNG facility.
- The project supports the BC natural gas industry, which from a GHG emission perspective is 5 to 8 times cleaner than the US industry on a life-cycle carbon analysis.
- The project will create hundreds of jobs during construction.
- During operation, it will create ~100 direct jobs and 300 indirect opportunities for people in the lower mainland.
- LNG jobs are well-paying, full-time family wage positions, which is needed to rebuild the economy.
- The project will create spin off opportunities for businesses across BC
- The project will support fuel switching from coal to LNG, which represents a 50% decrease in GHG emissions.
Let's not delay this project, it needs to be started as soon as possible.
Thank you
- Présenté par
- Philip Scott
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique et portes ouvertes virtuelles
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2020-07-14 14 h 29