Projet d'agrandissement de l'installation de GNL Tilbury - phase 2
The Tilbury LNG Expansion is good for the community and good for BC
- Numéro de référence
- 15
- Texte
Dear Sir/Madames:
I am writing to support the Tilbury LNG expansion project for the following reasons:
1. the project will produce clean-burning LNG that will replace Bunker C and MGO as ship fuels, thereby greatly reducing NOx, SOx and particulate emissions in my community and across BC
2. the project will be fully electrified (E-LNG), so it will be the cleanest LNG facility on the planet
3. The project supports the BC natural gas industry, which from a GHG emission perspective is 5 to 8 times cleaner than the US industry on a life-cycle carbon analysis
4. The project will create hundreds of jobs during construction. During operation, it will create ~100 direct jobs and 300 indirect opportunities for people in the lower mainland.
5. LNG jobs tend to be high-paying, full time family wage positions, which we so desperately need as we rebuild our economy post Covid-19
6. the project will create spin off opportunities for businesses across BC
7. the project will support fuel switching from coal to LNG, which represents a 50% decrease in GHG emissions.
I see absolutely no negative effects from advancing this project, please do it expediently and efficiently.
Thank you for reviewing my comments.
Yours truly, Fred Scott P.Eng.
- Présenté par
- Frederick Scott
- Phase
- Planification
- Avis public
- Avis public - Période de consultation publique et portes ouvertes virtuelles
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2020-06-25 20 h 47