Projet de GNL Cedar
Cedar LNG consideration
- Numéro de référence
- 18
- Texte
I am satisfied that this project can be done in a safe manner with a small footprint.
I have read through the project description and cannot see anywhere that there is menton of Condensate. I am fairly certain that Condensate will be a byproduct and that it is fairly volatile. The access road leading to the Marine facility is a very poor road that has areas that are single lane as it is susceptible to rock falls etc. there would be no possibility of a railway system installation, between the road and the hillside there is no right of way. I have not seen any maps that show the pipeline right of way and if there was a pipeline built to deal with the condensate what would be the end location of that pipeline. With three other projects in a very small area producing Condensate as a byproduct I do have concerns on hw this will be dealt with cumulatively. I look forward to seeing more information as the process moves along.
Lucy McRae
- Présenté par
- Lucy McRae
- Phase
- Planification
- Avis public
- S.O.
- Pièce(s) jointe(s)
- S.O.
- Date et heure de soumission
- 2019-10-20 4 h 32