Projet de forage exploratoire Tilt Cove

Comment Search Mobile

Comment Search

Passer aux filtres

41 résultats

Attachment Tilt Cove Technical Review Submission

  • Projet de forage exploratoire Tilt Cove
  • Auteur : Administrateur de la part de Mi'gmawe'l Tplu'tagnn Inc.
  • Numéro de référence : 34
  • Présenté : 2023-07-05 19 h 17
  • Phase du projet : S.O.
  • Avis de participation : Avis public - Période de consultation publique sur un résumé de l'étude d'impact environnemental
  • Please see the attached submission. 
  • Inclus pièce jointe
  • July 5, 2023 VIAEMAIL: tiltcove@iaac-aeic.gc.ca Impact Agency of Canada 200 – 1801 Hollis Street Halifax NS B3J 3N4 Dear Sir/Madam, Re: Technical Review & Assessment of the Summary of the Environmental Impact Statement for Tilt Cove Exploration Drilling Project On behalf of Mi’gmawe’l Tplu’tagnn Inc., please accept our technical review of the Environmental Impact Statement Summary for the Suncor Tilt Cove Exploration Drilling Project. As a L’nuey leadership body with the inherent responsibilities to protect our member First Nations— Amlamgog (Fort Folly) First Nation, Natoaganeg (Eel Ground) First Nation, Elsipogtog First Nation (Big Cove), Oinpegitjoig (Pabineau) First Nation, Esgenoôpetitj (Burnt Church) First Nation, Tjipõgtõtjg (Buctouche) First Nation, L’nui Menikuk (Indian Island) First Nation, Ugpi’ganjig (Eel River Bar) First Nation and Metepenagiag Mi’kmaq Nation— by asserting and implementing our inherent Aboriginal and Treaty ...
  • Inclus pièce jointe
  • Mark MacDougall 226 706 8888 ext. 802 mark.macdougall@sharedvaluesolutions.com sharedvaluesolutions.com 62 Baker Street Guelph Ontario Canada N1H 4G1 Prepared for: Mi’gmawe’l Tplu’taqnn Incorporated July 5, 2023 TECHNICAL REVIEW FOR THE TILT COVE EXPLORATION DRILLING PROJECT MI’GMAWE’L TPLU’TAQNN INCORPORATED Tilt Cove Offshore Exploration Project – Environmental Impact Statement (EIS) Review 1 Mi’gmawe’l Tplu’taqnn Incorporated c/o Erica Ward 40 MicMac Road Eel Ground, New Brunswick E1V 4B1 July 5, 2023 Dear Erica, It is our pleasure to provide you with our technical review of the Suncor Tilt Cove Environmental Impact Statement. This review was completed by Marnie Benson, Morgan Edwards, Robin Heavens, Emily Stairs, Mike VanEgmond, and Alley Amos of Shared Value Solutions, covering the breadth of the Environmental Impact Statement chapters and focusing on potential interactions of project activities with your rights, ...

Signaler

Attachment FFAW-Unifor Comments on the EIS Summary for the Tilt Cove Exploration Drilling Project

  • Projet de forage exploratoire Tilt Cove
  • Auteur : FFAW-Unifor
  • Numéro de référence : 23
  • Présenté : 2023-06-14 19 h 58
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Please accept the attached comments in connection with the Environmental Impact Statement (EIS) Summary for the Tilt Cove Exploration Drilling Project on behalf of the Fish, Food and Allied Workers’ Union (FFAW-Unifor) and prepared for Suncor Energy (Suncor).
  • Inclus pièce jointe
  • PO Box 10, Station C 368 Hamilton Ave, Second Floor St. John’s, NL A1C 5H5 Phone: 709.576.7276 Fax: 709.576.1962 Web: ffaw.ca June 14, 2023 Re: Impact Assessment Agency of Canada Public Comment Period on the Environmental Impact Statement Summary for the Tilt Cove Exploration Drilling Project To Whom It May Concern, Please accept the following comments in connection with the Environmental Impact Statement (EIS) Summary for the Tilt Cove Exploration Drilling Project on behalf of the Fish, Food and Allied Workers’ Union (FFAW-Unifor) and prepared for Suncor Energy (Suncor). The sheer magnitude of the project scope covered by this EIS warrants significant concern for fish harvesters. The proposed temporal scope initiates drilling in Q2 2024 and extends to the end of 2029, potentially drilling 12 to 16 wells, with exact design and locations of these wells not yet determined. The estimated 7 km² that will be inaccessible to fishing ...

Signaler

Attachment FW: Request for Technical Review -Tilt Cove Exploration Drilling Project

  • Projet de forage exploratoire Tilt Cove
  • Auteur : Administrateur de la part de Environment and Climate Change Canada
  • Numéro de référence : 36
  • Présenté : 2023-06-06 11 h 09
  • Phase du projet : S.O.
  • Avis de participation : Avis public - Période de consultation publique sur un résumé de l'étude d'impact environnemental
  • Please see the attached submissions. 
  • Inclus pièce jointe
  • Annexes – Page 1/12 ANNEX 1: Advice to the Agency Table 1: Please use the table below to provide advice for the Agency’s consideration in its recommendation to the Minister of Environment and Climate Change and preparation of draft conditions Questions Responses/Comments  Has the proponent described all project components and activities in sufficient detail to understand all relevant project-environment interactions? If not, identify what additional information is needed. No, the proponent has provided very little information on potential impacts on landbirds that might be impacted by the facility. Please see ECCC-001 in Annex 2 for further details.  Were the study areas sufficient to predict potential effects from all relevant project- environment interactions, and to consider the effects within a local and regional context?  Is the baseline information sufficient to characterize the existing environment, predict potential effects and obtain monitoring ...
  • Inclus pièce jointe
  • Annexes – Page 1/35 ANNEX 1: Advice to the Agency Table 1: Please use the table below to provide advice for the Agency’s consideration in its recommendation to the Minister of Environment and Climate Change and preparation of draft conditions Questions Responses/Comments  Has the proponent described all project components and activities in sufficient detail to understand all relevant project-environment interactions? If not, identify what additional information is needed.  Were the study areas sufficient to predict potential effects from all relevant project- environment interactions, and to consider the effects within a local and regional context?  Is the baseline information sufficient to characterize the existing environment, predict potential effects and obtain monitoring objectives? If not, identify what additional information is needed. Alternatives Assessment  Has the proponent adequately described the criteria it used to determine the ...

Signaler