Projet aurifère de Fifteen Mile Stream

Comment Search Mobile

Comment Search

Passer aux filtres

124 résultats

Attachment Mikmaw Ecological Knowledge Study for 15 Mile Stream gold mine project area

  • Projet aurifère de Fifteen Mile Stream
  • Auteur : St. Mary's River Association
  • Numéro de référence : 125
  • Présenté : 2022-11-11 12 h 38
  • Mis à jour : 2022-11-30 10 h 34
  • Raison : Commentaire mis à jour pour cause administrative
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • November 9th 2022 some of my colleagues attended an open house hosted by St. Barbara in Sheet Harbour for the 15 Mile Stream Gold Mine Project.  The open house highlighted major changes to this project which I have not seen shared publicly prior to this open house.  When asked, staff said details were mailed out to locals but locals I since talked to have not seen any of this information.  When asked about the attached Mi'kmaw Knowledge Study proponet staff stated the 2018 study was now to old and they will now be working with Millbrook First Nation on a new study.  I want to make sure this study is not dismissed as it is certainly still relivent and I feel St. Barbara simply did not like the results of the study so they dismissed it.  I am not happy about the expansion plan either.  Most notably adding 3 more open pits in the middle of this very large wet land.  You can read about it through this link which takes you to an ...
  • Inclus pièce jointe
  • Mi’kmaw Ecological Knowledge Study Fifteen Mile Stream Gold Development Project by Atlantic Gold Corporation Fifteen Mile Stream, Nova Scotia 1 Mi’kmaw Ecological Knowledge Study Fifteen Mile Stream Gold Development Project by Atlantic Gold Corporation Fifteen Mile Stream, Nova Scotia Mi’kma’ki All Points Services Inc. P.O. Box 63 Shubenacadie, NS, B0N 1W0 Ph.: 902-236-MAPS (6277) Nov. 2018 2 Contents 1. Introduction 4 1.1. Mi’kma’ki All Points Services Inc. 4 1.2. Project Description 4 2. Methodology 7 2.1. Purpose, Scope and Ethics of this MEKS 7 2.2. Definition of Terms 7 2.3. Research Methodology 9 2.4. Limitations 10 2.5. Study Area 11 3. Section I: THE SETTING 11 3.1. The Biophysical Environment 12 ...

Signaler

Attachment submission

  • Projet aurifère de Fifteen Mile Stream
  • Auteur : Administrateur de la part de St. Mary's River Association
  • Numéro de référence : 120
  • Présenté : 2021-06-02
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Good afternoon,   I don't see the submission I sent in as a part of the public consultation process that just occurred.  The submission was from St. Mary's RIver Association.  Can you check into this matter for me please?    letter attached   Thanks, Scott Beaver, PResident, SMRA
  • Inclus pièce jointe
  • PO Box 179 Sherbrooke NS, B0J3C0 www. stmarysrierassociation.com email: stmarysriver@ns.sympatico.ca _______________________________________________________________________________________ April 26, 2021 Fifteen Mile Stream Gold Project Government of Canada Environmental Assessment Agency Suite 200, 1801 Hollis Street Halifax, N.S. B3J 3N4 To Whom it May Concern; The St. Mary's River Association is a charitable, non-profit organization providing leadership and engaging partners to enhance, protect, and promote the St. Mary's River as a healthy ecosystem for Atlantic salmon and other native animals and plant species, as well as providing a rich community resource. The SMRA is writing to express our concern with the scale of Atlantic Gold’s proposed Twelve Mile Stream Project and to provide input on the scope of the Federal Environmental Assessment. Many rural areas have succumb to various human activities that have degraded the ...

Signaler

Attachment Comment on FMS Mine proposal EIS

  • Projet aurifère de Fifteen Mile Stream
  • Auteur : Dalhousie University présenté par Karen Beazley
  • Numéro de référence : 70
  • Présenté : 2021-04-30 18 h 45
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Thank you for the opportunity to provide comment on the Environmental Impact Statement (EIS) of proposed Fifteen Mile Stream (FMS) Gold Project submitted by Atlantic Mining NS Inc, a wholly owned subsidiary of St Barbara Limited, as part of the Environmental Assessment (EA) process.  I have significant concerns with the project as a whole. I question the wisdom of considering or approving a project that despite any or all mitigation measures will substantially degrade Nova Scotia’s lands, waters and wildlife. Though there are many concerns that I address, the primary ones are related to loss of species at risk and of concern and their habitat, along with broader degration of habitat from edge and fragmentation effects, both directly related to the project ...
  • Inclus pièce jointe
  • 1 Comment on Fifteen Mile Stream Gold Mine Project submitted by Atlantic Mining NS Inc Karen Beazley, Professor, Resource and Environmental Studies, Dalhousie University; citizen of Halifax, Nova Scotia, Canada B3H 4P5 April 30, 2021 Thank you for the opportunity to provide comment on the Environmental Impact Statement (EIS) of proposed Fifteen Mile Stream (FMS) Gold Project submitted by Atlantic Mining NS Inc, a wholly owned subsidiary of St Barbara Limited, as part of the Environmental Assessment (EA) process. Before addressing specific items from the EIS, I first wish to express significant concerns with the project as a whole. In terms of the big picture, I question the wisdom of considering or approving a project that despite any or all mitigation measures will substantially degrade Nova Scotia’s lands, waters and wildlife for the purpose of enriching a foreign multinational corporation and its stockholders. St Barbara Limited is an Australian based, ASX ...

Signaler

Attachment Comments on EIS Reports 15 Mile Stream Proposed Gold Mine

  • Projet aurifère de Fifteen Mile Stream
  • Auteur : Administrateur de la part de Peter Lund
  • Numéro de référence : 98
  • Présenté : 2021-04-30
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Please find attached my comments. I removed my signature to ensure privacy. If you would like me to add back my electronic signature, let me know and I can resend. Thank you, Peter Lund <personal information removed>
  • Inclus pièce jointe
  • April 29, 2021 Canadian Environmental Assessment Agency Re: Comments on EIS Reports Proposed 15 Mile Stream Gold Mine, NS Herein are my comments and concerns regarding the EIS reports: 1. It is stated in the reports that “no water treatment facility will be constructed unless needed” and that the “current modeling does not predict the need for water treatment during the closure phase.” It is stated though that “ARD can begin in 6-15 years,” which is obviously during the post closure period. As the buffering capacity is depleted, the concentrations of dissolved metals will increase as the pH progressively lowers. The proponent needs to stay committed (in writing) beyond the 15-20 years they are currently committed to post-closure in the EIS documents, to ensuring that any required treatment and monitoring stays in place for decades following mine closure. As well, if the proponent’s company is sold in the future, the purchaser must assume and uphold the regulatory ...

Signaler

Date de soumission Afficher les filtres

Filters

Date de modification :