Jeanne D'Arc Basin Exploration Drilling Project

Comment Search Mobile

Comment Search

Skip to filters

28 results

Attachment Miawpukek FN Comments - CEAR 80130

  • Jeanne D'Arc Basin Exploration Drilling Project
  • Author: Administrator on behalf of Miawpukek First Nation
  • Reference Number: 51
  • Submitted: 2020-01-10 - 2:52 PM
  • Project Phase: Environmental Assessment Report
  • Participation Notice: Public Notice - Public Comments Invited on the Draft Environmental Assessment Report
  • Greetings, I am delivering the attached report on behalf of Miawpukek First Nation. The report provides comments and recommendations regarding the Environmental Assessment Report and potential conditions for the Jean D’Arc Basin offshore exploration project proposed off of Newfoundland (CEAR 80130). If you have any questions or concerns, please contact myself and Ross Hinks.   Thank you, Keegan McGrath   Keegan McGrath, BSc, MES Fisheries and Aquatic Biologist, Shared Value Solutions Ltd. Office and Mobile: 226-706-8888 x123 Fax: 226-314-1200 E-mail: keegan.mcgrath@sharedvaluesolutions.com Web: www.sharedvaluesolutions.com (http://www.sharedvaluesolutions.com/) Shared Value Solutions Ltd. 62 Baker Street Guelph ON N1H 4G1 Canada Shared ...
  • Attachment Included
  • Newfoundland Jeanne D’Arc Basin Exploration Drilling Project Comments on the Draft Environmental Assessment Report and Draft Conditions of Approval Prepared by Miawpukek First Nation and Shared Value Solutions January 3, 2020 NEWFOUNDLAND JEANNE D’ARCBASIN EXPLORATION DRILLING | i Contents 1.0 Introduction ...................................................................................................................................... 1 2.0 Miawpukek First Nation .................................................................................................................... 1 2.1 Historic Overview .......................................................................................................................... 2 2.2 Rights and Interests ...................................................................................................................... 3 3.0 Comments on the Project, EA and Potential ...

Report

Attachment Jeanna D'arc Basin Exploration Drilling Project Draft Environmental Assessment Report and Potential Conditions Technical Review

  • Jeanne D'Arc Basin Exploration Drilling Project
  • Author: Administrator on behalf of Marcy Cloud
  • Reference Number: 58
  • Submitted: 2020-01-10
  • Project Phase: Environmental Assessment Report
  • Participation Notice: Public Notice - Public Comments Invited on the Draft Environmental Assessment Report
  • Hello,   Please find attached Mi'gmawe'l Tplu'taqnn Inc.'s Cover Letter and Technical Review of the Draft Environmental Assessment Report and Potential Conditions for the Jeanne D'Arc Basin Exploration Drilling Project.     Thank you,   Marcy 
  • Attachment Included
  • s h a r e d v a l u e s o l u t i o n s . c o m Jeanne D’Arc Basin Exploration Drilling Project Review of Draft Environmental Assessment and Draft Conditions Prepared for: Mi’gmawe’l Tplu’taqnn Incorporated Rachel Speiran, M.A. Project Director (226) 706 – 8888 ext. 120 rachel.speiran@sharedvaluesolutions.com 62 Baker Street Guelph, ON, Canada N1H 4G1 Mi’gmawe’l Tplu’taqnn Incorporated Chief George Ginnish Chief Rebecca Knockwood 38 Micmac Road Eel Ground, NB E1V 4A7 January 08, 2020 Dear Chief George Ginnish and Chief Rebecca Knockwood: It is our pleasure to provide you with the review of the Draft Environmental Assessment Report and Draft Potential Conditions for the Jeanne D’Arc Basin Exploration Drilling Project. This review was completed by Rachel Speiran, MA; Allie Mayberry, BSc, MA, Levi Snook, BSc, and Meaghan Langille, BSc; EPt, of Shared Value Solutions Ltd. We look forward to continuing to ...
  • Attachment Included
  • Mi’gmawe’l Tplu’taqnn Incorporated 40 Micmac Road Phone: 506.627.4696 Eel Ground, NB E1V 4B1 Fax: 506.627.4605 January 10, 2020 VIAEMAIL: iaac.husky.aeic@canada.ca Canadian Environmental Assessment Agency 200 – 1801 Hollis Street Halifax NS B3J 3N4 Dear Sir/Madam, Re: Technical Review & Assessment of the Draft Environmental Assessment Report and potential EA conditions for the Jeanna D’Arc Basin Exploration Drilling Project On behalf of Mi’gmawe’l Tplu’taqnn, we are responding to the Draft Environmental Assessment Report for the above project, dated November 2019. Mi’gmawe’l Tplu’taqnn’s primary concern remains how the projects impact migratory species that are of great cultural significance to the Mi’gmaq, including salmon, swordfish, Bluefin tuna, Atlantic right whales, and migratory birds. Please find enclosed a report from Shared Value Solutions that we are submitting on behalf of ...

Report

Attachment Rapport provisoire d'é. environnementale et conditions fédérales potentielles de l'é. environnementale du projet de forage exploratoire dans le Bassin Jeanne d'Arc-Husky Oil Operations Ltd. et ExxonMobil Canada Ltd.

  • Jeanne D'Arc Basin Exploration Drilling Project
  • Author: Administrator on behalf of Conseil des Innu de Ekuanitshit
  • Reference Number: 56
  • Submitted: 2020-01-03
  • Project Phase: Environmental Assessment Report
  • Participation Notice: Public Notice - Public Comments Invited on the Draft Environmental Assessment Report
  • Veuillez consulter la pièce jointe. 
  • Attachment Included
  • Conseil des Innu de Ekuanitshit 35, rue Manitou Ekuanitshit (Québec) G0G 1V0 Tél. : (418) 949-2234 fax : (418) 949-2085 Le 3 janvier 2020 PAR COURRIEL : iaac.husky.aeic@canada.ca Projet de forage exploratoire dans le Bassin Jeanne D’Arc Agence d’évaluation d’impact du Canada 200-1801 rue Hollis Halifax, Nouvelle-Écosse B3J 3N4 Objet : Rapport provisoire d’évaluation environnementale et conditions fédérales potentielles de l’évaluation environnementale du projet de forage exploratoire dans le Bassin Jeanne d’Arc—Husky Oil Operations Ltd. et ExxonMobil Canada Ltd. Réponse et commentaires des Innu de Ekuanitshit Madame Boychuk, La présente fait suite à votre courriel du 25 novembre 2019, par lequel vous nous demandiez de fournir nos commentaires à l’égard du Rapport provisoire et des conditions fédérales potentielles mentionnés en rubrique, et ce, d’ici le 3 janvier 2020. Nos ressources étant limitées et considérant le grand nombre de demandes ...

Report
Date modified: