Projet de la mine Beaver Dam

Comment Search Mobile

Comment Search

Passer aux filtres

373 résultats

Attachment From Atlantic Mining NS Inc. to the Impact Assessment Agency of Canada in response to the Agency's comments on Supplemental Information provided (Agency's comments - see related document 338)

  • Projet de la mine Beaver Dam
  • Auteur : Administrateur de la part de Atlantic Mining Nova Scotia Inc.
  • Numéro de référence : 340
  • Présenté : 2023-02-10 12 h 38
  • Mis à jour : 2023-02-20 14 h 55
  • Raison : Commentaire mis à jour pour cause administrative
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Please see the attached submission. 
  • Inclus pièce jointe
  • Page 1 of 2 Kathryn McCarthy Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, NS B3J 3N4 February 10, 2023 Dear Ms. McCarthy, On behalf of Atlantic Mining Nova Scotia Inc. (AMNS), I would like to thank you for the discussions held in the fall around the Beaver Dam Mine Project (the Project) regarding the technical review comments from the Department of Fisheries and Oceans (DFO) on potential effects to fish and fish habitat. We have received the most recent letter, dated November 17, 2022, with comments from DFO, Environment and Climate Change Canada (ECCC), and Natural Resources Canada (NRCan). Based on the technical feedback received, we do not believe the information provided related to flow modelling, water treatment, and the aquatic effects monitoring plan has been accurately represented. This letter is not intended to address each item of the November 17 DFO letter individually, however there are statements made ...

Signaler

Attachment Health Canada's conformity and technical review of the Proponent's revised response for CEAA-2-31 Round 2 IR responses

  • Projet de la mine Beaver Dam
  • Auteur : Administrateur de la part de Health Canada
  • Numéro de référence : 323
  • Présenté : 2022-01-24
  • Phase du projet : S.O.
  • Avis de participation : S.O.
  • Please see the attached submission.
  • Inclus pièce jointe
  • Environmental Health Program Regulatory Operations and Enforcement Branch Health Canada 1505 Barrington Street Halifax, Nova Scotia B3J EY6 January 24, 2022 Kathryn MacCarthy Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, Nova Scotia B3J 3N4 Sent by email to: Kathryn.MacCarthy@iaac-aeic.gc.ca Subject: Health Canada’s conformity and technical review of the Proponent’s revised response for CEAA-2-31 in the revised Round II (Part 1 and Part 2) information request responses and revised Environmental Impact Statement for the Beaver Dam Mine Project Dear Kathryn MacCarthy: Thank you for your email dated December 14, 2021 requesting Health Canada’s conformity and technical review of the Proponent’s revised response for CEAA-2-31 in the revised Round II (Part 1 and Part 2) information request responses and revised Environmental Impact Statement for the Beaver Dam Mine Project. For this project, Health Canada is participating ...
  • Inclus pièce jointe
  • 1 ANNEX 1: Information requests directed to the proponent for revised CEAA-2-31 ID Project Effects Link to CEAA 2012 Reference to EIS guidelines Reference to EIS Context and Rationale Specific Question/ Request for Information Air HC-A-14 5(1)(c)(i) Aboriginal Peoples Health/ socio-economic conditions 5(1)(c)(iii) Current Use of Lands and Resources for traditional purposes Section 6.2.1 Changes to the atmospheric environment Information Request Responses Round II Package Revised CEAA -2-31 Pg. 73-171 PDF The air quality isopleths do not show all data nor the baseline + project scenario. Ranges shown on the air quality isopleths do not include the lowest values that were modelled. For example, the NO2 24-hour contours in Figure CEAA 2-31-16A (Pg. 116 PDF) do not show values below 1 µg/m3. This can give the false impression that the project is not contributing contaminants of potential concern at any level, while in fact the ...

Signaler
Date de modification :