Wharf Reconstruction at the Mink River Small Craft Harbour, Prince Edward Island

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document Standard Mitigation Measures

  • Project Wharf Reconstruction at the Mink River Small Craft Harbour, Prince Edward Island
  • Document Category: Additional Information
  • Reference Number: 3
  • Document Date: 2026-04-10
  • Document: 166029E.pdf
  • Relevance: 398.72
  • Fisheries and Oceans Canada – Small Craft Harbours Maritimes and Gulf Regions Standard Mitigation Measures for Small Craft Harbour Projects Undertaken in Prince Edward Island TRANSPORTATION 1. Transport hazardous materials and hazardous waste in compliance with the Transportation of Dangerous Goods Act. 2. All vessels, floating plant equipment, barges and scows used in the work must comply with all Canada Shipping Act requirements for inspection, which includes ...
1 alternate format found
French PDF
  • Relevance: 347.72
  • Page 1 Pêches et Océans Canada - Ports pour petits bateaux Régions des Maritimes et du Golfe Mesures d'atténuation standard pour les projets au ports pour petits bateaux entrepris à l'Île-du-Prince-Édouard TRANSPORT 1. Transporter les matières dangereuses et les déchets dangereux en conformité avec la Loi sur le transport des marchandises dangereuses. 2. Tous les navires, l’équipement à outillage flottant, les barges et les ...

Document End of Public Comment Period

  • Project Wharf Reconstruction at the Mink River Small Craft Harbour, Prince Edward Island
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2026-03-06
  • Document: 166025E.html
  • Relevance: 394.92
  • March 6, 2026 – The public comment period on the project is closed. The Small Craft Harbours branch of Fisheries and Oceans Canada as well as Transport Canada are considering comments received to date to inform its determination on whether carrying out of the project is likely to cause significant adverse environmental effects.
1 alternate format found
French HTML
  • Relevance: 343.92
  • 6 mars, 2026 – La période de commentaires du public sur le projet est maintenant terminée. La direction des ports pour petits bateaux du Ministère des pêches et océans ainsi que Transports Canada examinent les commentaires reçus à ce jour afin de déterminer si l'exécution du projet est susceptible d'entraîner des effets environnementaux négatifs importants.

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: